Spelling suggestions: "subject:"[een] PRODUCTION SCHEDULING"" "subject:"[enn] PRODUCTION SCHEDULING""
31 |
Extending the range of linear scheduling in highway construction /Bafna, Tarun, January 1991 (has links)
Thesis (M.S.)--Virginia Polytechnic Institute and State University, 1991. / Vita. Abstract. Includes bibliographical references (leaves 183-186). Also available via the Internet.
|
32 |
Models for optimal utilization of production resources under demand selection flexibilityTaaffe, Kevin Michael. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 186 pages. Includes vita. Includes bibliographical references.
|
33 |
Models and algorithms for operations scheduling problems with resource flexibility and schedule disruptionsYang, Bibo. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 152 pages. Includes vita. Includes bibliographical references.
|
34 |
Reinforcement learning for job-shop scheduling /Zhang, Wei, January 1900 (has links)
Thesis (Ph. D.)--Oregon State University, 1996. / Typescript (photocopy). Includes bibliographical references (leaves 159-170). Also available on the World Wide Web.
|
35 |
Batch production smoothing with variable setup and processing timesYavuz, Mesut. January 2005 (has links)
Thesis (Ph. D.)--University of Florida, 2005. / Title from title page of source document. Document formatted into pages; contains 277 pages. Includes vita. Includes bibliographical references.
|
36 |
A space-constrained resource-constrained scheduling system for multi-story buildings /Thabet, Walid Y., January 1992 (has links)
Thesis (Ph. D.)--Virginia Polytechnic Institute and State University, 1992. / Vita. Abstract. Includes bibliographical references (leaves 425-430). Also available via the Internet.
|
37 |
Heuristic models for serviceman routing in the telephone industryFeder, Terry Lee, January 1900 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1969. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references.
|
38 |
Highway bridge construction production rates for time estimationHuh, Youngki, O'Connor, James Thomas, January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
|
39 |
Reconfigurable resource schedulingSun, Yu, January 1900 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2007. / Vita. Includes bibliographical references.
|
40 |
Scheduling of product families on multiple, identical parallel production lines to minimize setup costsMonkman, Susan Kathleen, January 1900 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2006. / Vita. Includes bibliographical references.
|
Page generated in 0.0413 seconds