• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 203
  • 54
  • 34
  • 4
  • 4
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 367
  • 367
  • 63
  • 62
  • 52
  • 50
  • 49
  • 48
  • 47
  • 46
  • 42
  • 42
  • 40
  • 35
  • 34
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Extending the range of linear scheduling in highway construction /

Bafna, Tarun, January 1991 (has links)
Thesis (M.S.)--Virginia Polytechnic Institute and State University, 1991. / Vita. Abstract. Includes bibliographical references (leaves 183-186). Also available via the Internet.
32

Models for optimal utilization of production resources under demand selection flexibility

Taaffe, Kevin Michael. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 186 pages. Includes vita. Includes bibliographical references.
33

Models and algorithms for operations scheduling problems with resource flexibility and schedule disruptions

Yang, Bibo. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 152 pages. Includes vita. Includes bibliographical references.
34

Reinforcement learning for job-shop scheduling /

Zhang, Wei, January 1900 (has links)
Thesis (Ph. D.)--Oregon State University, 1996. / Typescript (photocopy). Includes bibliographical references (leaves 159-170). Also available on the World Wide Web.
35

Batch production smoothing with variable setup and processing times

Yavuz, Mesut. January 2005 (has links)
Thesis (Ph. D.)--University of Florida, 2005. / Title from title page of source document. Document formatted into pages; contains 277 pages. Includes vita. Includes bibliographical references.
36

A space-constrained resource-constrained scheduling system for multi-story buildings /

Thabet, Walid Y., January 1992 (has links)
Thesis (Ph. D.)--Virginia Polytechnic Institute and State University, 1992. / Vita. Abstract. Includes bibliographical references (leaves 425-430). Also available via the Internet.
37

Heuristic models for serviceman routing in the telephone industry

Feder, Terry Lee, January 1900 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1969. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references.
38

Highway bridge construction production rates for time estimation

Huh, Youngki, O'Connor, James Thomas, January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
39

Reconfigurable resource scheduling

Sun, Yu, January 1900 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2007. / Vita. Includes bibliographical references.
40

Scheduling of product families on multiple, identical parallel production lines to minimize setup costs

Monkman, Susan Kathleen, January 1900 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2006. / Vita. Includes bibliographical references.

Page generated in 0.0413 seconds