Spelling suggestions: "subject:"[een] PRODUCTION SCHEDULING"" "subject:"[enn] PRODUCTION SCHEDULING""
41 |
Modeling and analysis of the batch production scheduling problem for perishable products with setup timesCharnprasitphon, Aphiwat. January 2007 (has links)
Thesis (Ph. D.)--Industrial and Systems Engineering, Georgia Institute of Technology, 2007. / Dr. Faiz Al-Khayyal, Committee Co-Chair ; Dr. Paul M. Griffin, Committee Co-Chair ; Dr. Earl Barnes, Committee Member ; Dr. Jye-Chyi Lu, Committee Member ; Dr. John Elton, Committee Member.
|
42 |
Master scheduling and component lot sizing decisions in resource-constrained material requirements planning environments /Bahl, Harish C. January 1980 (has links)
No description available.
|
43 |
Development of an algorithm for a multi-processor weighted flow time scheduling problem /c y Seokyoo Ahn.Ahn, Seokyoo January 1982 (has links)
No description available.
|
44 |
Sequencing to minimize total earliness-tardiness penalties on a single-machine /Tahboub, Zainel-Abideen Abdul-Majid January 1986 (has links)
No description available.
|
45 |
Short run instability in the industrial contract research industry /Goldstone, Seymour E. January 1968 (has links)
No description available.
|
46 |
Development of the project definition rating index (PDRI) for building projects /Cho, Chung-suk, January 2000 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2000. / Vita. Includes bibliographical references (leaves 283-288). Available also in a digital version from Dissertation Abstracts.
|
47 |
Comparison of the Clarke-Wright algorithm for generation of optimal transportation schedulesShiffrin, James Henry, 1948- January 1972 (has links)
No description available.
|
48 |
An integrated solution methodology for two-stage manufacturing operationsSmith, Neale R. 12 1900 (has links)
No description available.
|
49 |
A desision support system for session schedulingSchulz, Joseph Edward 08 1900 (has links)
No description available.
|
50 |
Lot size scheduling problem with two level setup cost/time structureChung, Jae Hyun 08 1900 (has links)
No description available.
|
Page generated in 0.0694 seconds