• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] COMPARISON OF DIFFERENT STRATEGIES FOR OFFSHORE WELL CONSTRUCTION INCORPORATING UNCERTAINTY / [pt] COMPARAÇÃO DE ESTRATÉGIAS DE CONSTRUÇÃO DE POÇOS MARÍTIMOS INCORPORANDO INCERTEZAS

MARIANA MONTEIRO MARTINS 16 February 2017 (has links)
[pt] Esta pesquisa apresenta uma comparação entre duas estratégias de construção de poços marítimos, sequencial e seriada, de forma a entender suas características e ressaltar suas diferenças, impactos e desafios. Além disso, para inserir o contexto de incerteza nessas operações, foi acrescentada uma análise de risco para cada uma das estratégias de perfuração e completação de poços. Um estudo de caso com dados reais de um campo de petróleo foi desenvolvido de forma a analisar os resultados e comparar questões sobre duração da campanha dos poços, entrada dos poços em produção, troca de fluidos e ajustes da sonda. Essas mesmas questões foram analisadas após acrescentar distribuições de probabilidade aos cronogramas das estratégias sequencial e seriada e aplicar a simulação de Monte Carlo. Os resultados mostraram a relevância de se avaliar novas formas de sequenciamento das atividades de poços a fim de reduzir o tempo total levado para construção de poços marítimos. / [en] This research presents a comparison between two different strategies of offshore well construction, one sequential and another in batch. This analysis aims to understand the characteristics of these two strategies, their impacts on some results and challenges. Besides, to understand how uncertainties affect these operations, a risk analysis was incorporated to each one of the strategies. A case study with real data from an oil field was developed in order to analyze the results and to compare issues, as total well campaign duration, production ramp up, fluid exchange and drilling rig adjustments. These same issues were analyzed after adding probability distribution in each strategy s schedules and realizing a Monte Carlo simulation. The results showed the importance of evaluating different types of sequencing well activities seeking to reduce total well construction duration.

Page generated in 1.5242 seconds