• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] AN ANALYSIS OF THE OPTION TO EXPAND THE CAPACITY OF THE BRT TRANSOESTE CORRIDOR VIA THE REAL OPTIONS METHOD / [pt] UMA ANÁLISE DA EXPANSÃO DE CAPACIDADE DO CORREDOR BRT TRANSOESTE PELO MÉTODO DAS OPÇÕES REAIS

19 May 2020 (has links)
[pt] Projetos de infraestrutura de transporte de massa desempenham um importante papel no planejamento urbano das zonas urbanas, podendo influenciar na geração de crescimento econômico e o aumento do bemestar social. Entre as variadas opções de modos de transporte de massas existentes está o BRT, caracterizado por ser um sistema que requer um curto tempo de implementação, baixo custo de construção, e possui velocidade operacional e nível de capacidade médios. Em comparação com outros modos de transporte de maior capacidade, como trens e metrôs, o BRT é uma opção viável e atraente ao modo de transporte, dado o ritmo crescente de sua implementação em várias cidades ao redor do mundo nos últimos anos. Neste estudo, foi feita uma análise do corredor BRT TransOeste da cidade do Rio de Janeiro, sob a ótica da Teoria das Opções Reais, com o objetivo de avaliar o valor da opção de expandir a capacidade de passageiros transportados atualmente naquele corredor. Os resultados do estudo sugerem que a incorporação de estratégias interativas das Opções Reais, relativas às decisões de expansão da capacidade máxima de passageiros do corredor e de adiamento do exercício desta decisão, contribuíram para aumentar o valor esperado do projeto em 30,63 por cento. Além disso, foi observado que o aporte de recursos realizados pelo poder concedente contribuiu para aumentar o valor da opção real de expansão. / [en] Mass transportation infrastructure projects play an important role in the process of development of urban areas, leading to economic growth and increase of social welfare. Among the various existing types of transit modes is the BRT, which is characterized by being a system that requires a short time of implementation and a low cost of construction, operating in an medium level of operational speed and capacity. In comparison with other transit modes of higher capacity such as trains and subways, the BRT has shown to be a feasible and attractive alternative, as noted by the increasing pace of its implementation in many cities throughout the world in recent years. In this study, an analysis was made of the BRT TransOeste corridor in the city of Rio de Janeiro from the perspective of the Theory of Real Options in order to assess the value of the option of expanding passenger capacity in that corridor. The results suggest that the incorporation of interactive strategies of Real Options related to the decisions of expanding the maximum capacity of passengers and deferring this decision contributed to increase the expected value of the project by 30.63 percent. In addition, the contribution of the granting authority led to an increase in value of the real option.

Page generated in 0.0317 seconds