• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] OPERATING RESERVE ASSESSMENT IN MULTI-AREA SYSTEMS WITH RENEWABLE SOURCES VIA CROSS ENTROPY METHOD / [pt] PLANEJAMENTO DA RESERVA OPERATIVA EM SISTEMAS MULTIÁREA COM FONTES RENOVÁVEIS VIA MÉTODO DA ENTROPIA CRUZADA

JOSÉ FILHO DA COSTA CASTRO 11 January 2019 (has links)
[pt] A reserva girante é a parcela da reserva operativa provida por geradores sincronizados, e interligados à rede de transmissão, aptos a suprir a demanda na ocorrência de falhas de unidades de geração, erros na previsão da demanda, variações de capacidade de fontes renováveis ou qualquer outro fator inesperado. Dada sua característica estocástica, essa parcela da reserva operativa é mais adequadamente avaliada por meio de métodos capazes de representar as incertezas inerentes ao seu dimensionamento e planejamento. Por meio do risco de corte de carga é possível comparar e classificar distintas configurações do sistema elétrico, garantindo a não violação dos requisitos de confiabilidade. Sistemas com elevada penetração de fontes renováveis apresentam comportamento mais complexo devido ao aumento das incertezas envolvidas, à forte dependência de fatores energético-climáticos e às variações de capacidade destas fontes. Para avaliar as correlações temporais e representar a cronologia de ocorrência dos eventos no curto-prazo, um estimador baseado na Simulação Monte Carlo Quase Sequencial é apresentado. Nos estudos de planejamento da operação de curto-prazo o horizonte em análise é de minutos a algumas horas. Nestes casos, a ocorrência de falhas em equipamentos pode apresentar baixa probabilidade e contingências que causam corte de carga podem ser raras. Considerando a raridade destes eventos, as avaliações de risco são baseadas em técnicas de amostragem por importância. Os parâmetros de simulação são obtidos por um processo numérico adaptativo de otimização estocástica, utilizando os conceitos de Entropia Cruzada. Este trabalho apresenta uma metodologia de avaliação dos montantes de reserva girante em sistemas com participação de fontes renováveis, em uma abordagem multiárea. O risco de perda de carga é estimado considerando falhas nos sistemas de geração e transmissão, observando as restrições de transporte e os limites de intercâmbio de potência entre as diversas áreas elétricas. / [en] The spinning reserve is the portion of the operational reserve provided by synchronized generators and connected to the transmission network, capable of supplying the demand considering generating unit failures, errors in load forecasting, capacity intermittency of renewable sources or any other unexpected factor. Given its stochastic characteristic, this portion of the operating reserve is more adequately evaluated through methods capable of modeling the uncertainties inherent in its design and planning. Based on the loss of load risk, it is possible to compare different configurations of the electrical system, ensuring the non-violation of reliability requirements. Systems with high penetration of renewable sources present a more complex behavior due to the number of uncertainties involved, strong dependence of energy-climatic factors and variations in the capacity of these sources. In order to evaluate the temporal correlations and to represent the chronology of occurrence of events in the short term, an estimator based on quasi-sequential Monte Carlo simulation is presented. In short-term operation planning studies, the horizon under analysis is from minutes to a few hours. In these cases, the occurrence of equipment failures may present low probability and contingencies that cause load shedding may be rare. Considering the rarity of these events, risk assessments are based on importance sampling techniques. The simulation parameters are obtained by an adaptive numerical process of stochastic optimization, using the concept of Cross Entropy. This thesis presents a methodology for evaluating the amounts of spinning reserve in systems with high penetration of renewable sources, in a multi-area approach. The risk of loss of load is estimated considering failures in the generation and transmission systems, observing the network restrictions and the power exchange limits between the different electric areas.

Page generated in 0.0501 seconds