• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • 2
  • 1
  • Tagged with
  • 13
  • 8
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Facteurs environnementaux et réseaux d’eau, Arthabaska et Victoriaville, 1880-1934

Garneau, Caroline 07 1900 (has links)
Ce mémoire porte sur l’étude de deux réseaux d’eau distincts, soit celui de la ville d’Arthabaska et celui de la ville de Victoriaville. Nous souhaitons éclairer le rôle joué par les facteurs environnementaux, naturels et urbains, au cours du processus ayant mené à l’implantation de réseaux d’eau potable et d’eaux usées dans les deux villes à l’étude. Divers travaux ont traité de la mise en place des réseaux d’aqueduc et d’égout à la grandeur du Canada. Toutefois, ce sont essentiellement les grandes villes comme Montréal ou Toronto qui ont retenu l’attention de l’histoire urbaine, politique et environnementale canadienne. L’objectif de cette démarche consiste à montrer que le milieu physique rural doit être incorporé à l’analyse comme élément vivant qui se transforme, qui influence et qui est influencé à son tour par l’être humain, puisqu’un et l’autre sont en constante interaction. Nous soutenons que la mise en place et le développement de réseaux d’eau sont influencés par le territoire dans lequel ils sont implantés et qu’ils ne peuvent pas être correctement analysés sans celui-ci. Afin de mettre l’espace au cœur de l’étude, nous avons mené une analyse des villes d’Arthabaska et de Victoriaville en considérant la géographie de la région à l’aide des cartes et des plans d’assurance-incendie, en plus de consulter des documents officiels et des articles tirés des journaux locaux. / This thesis focuses on the study of two separate water systems, namely that of city of Arthabaska and city of Victoriaville. We wish to clarify the role of natural and urban environmental factors in the process that led to the establishment of drinking water and wastewater systems in the two cities under consideration. Various studies have dealt with the implantation of waterworks and sewer systems across the country. However, it is mainly the large cities such as Montreal and Toronto that have caught the attention of the canadian political, urban, and environmental history. The objective of this approach is to show that the natural physical environment must be incorporated into the analysis as a living element that transforms, which influences and is influenced in turn by humans, since both are in constant interaction. We argue that the establishment and development of water systems are influenced by the territory in which they operate and they can not be correctly analyzed otherwise. To put the surroundings in the heart of the study, we conducted an analysis of city of Arthabaska and city of Victoriaville considering the geography of the area using maps and fire insurance plans, in addition to the analysis of official documents and articles from local newspapers.
12

Development of a model simplification procedure for integrated urban water system models : conceptual catchment and sewer modelling

Pieper, Leila 24 April 2018 (has links)
La modélisation intégrée du système d’assainissement urbain offre la flexibilité nécessaire pour développer des solutions qui bénéficient le plus au système global, en mettant l'accent sur la quantité et la qualité de l'eau, Les modèles intégrés offrent des avantages par rapport aux modèles traditionnels des sous-systèmes individuels en facilitant l’analyse efficace des interactions entre ces différents systèmes individuels (c.-à-d. les bassins versants, les égouts, les stations d’épuration et les eaux réceptrices) dans une seule plateforme de modélisation. La complexité réduite de ce type de modèle diminue le fardeau de calcul par rapport à leurs homologues détaillés, ce qui permet une plus large gamme d'évaluations telles que l'analyse de scénarios, l'optimisation par contrôle en temps réel et l’analyse d'incertitude par approche Monte Carlo. Le potentiel de créer ces types de modèles intégrés représentatifs a été démontré dans de multiples études, mais les méthodes existantes pour développer ces modèles ne sont pas bien établies ni bien documentées et nécessitent donc un grand effort pour chaque nouveau cas d’étude. De plus, l'absence d'une méthode standardisée pour représenter la partie du modèle qui simule la quantité d'eau limite l'application de ces modèles pour des études de qualité de l'eau. Bien que la recherche soit nécessaire pour développer et optimiser toutes les méthodologies impliquées dans le développement de modèles intégrés de systèmes d'eaux usées urbaines, ce projet se concentre sur les modèles conceptuels simplifiés des bassins versants et des égouts pour la quantité d'eau. L'objectif de cette étude était de développer une procédure structurée pour traduire des modèles hydrologiques et hydrauliques détaillés en modèles conceptuels simplifiés utilisés dans la modélisation du système intégré des eaux usées urbaines. L'objectif était d'améliorer la répétabilité, la flexibilité et l'efficacité de l'approche générale, indépendamment de la plateforme de modélisation choisie. Cette tâche a été réalisée en extrayant les principales étapes et considérations tout en construisant deux modèles conceptuels simplifiés d'une étude de cas au centre d'Ottawa, au Canada. La partie urbaine centrale (6 400 ha) d'un modèle détaillé PCSWMM de la Ville d'Ottawa, contenant une combinaison d'égouts séparés, partiellement séparés et combinés, a été utilisée comme modèle de référence dans cette étude de cas. La tâche principale consistait à déterminer comment traduire ce modèle détaillé en modèle conceptuel simplifié de manière structurée, systématique et répétable en utilisant WEST comme plateforme. La procédure développée suit une séquence similaire à celle des protocoles examinés dans la revue de la littérature, tout en tenant compte des spécificités liées à l'agrégation des bassins versants et des égouts. Les quatre phases principales sont la définition du projet, le développement du modèle, la calibration et la validation. Deux versions du modèle conceptuel ont été créées : le premier a d'abord été créé avec un certain niveau d'agrégation, tandis que le deuxième était plus agrégé que le premier modèle, avec environ la moitié du nombre de bloques et de réservoirs. Les deux modèles ont été calibrés et comparés au modèle détaillé. Les résultats des simulations ont montré que le volume total et la dynamique des débits calculés par les modèles conceptuels ont bien émulé ceux du modèle détaillé (< < 10% de différence), tout en fournissant une réduction significative du temps de calcul (10 à 80 fois). La réduction du temps de simulation pour le modèle le plus agrégé n'était pas équivalente au niveau d'agrégation augmentée, principalement parce qu’il y a une quantité de code qui est présente dans les deux codes et prend donc le même temps de calcul. Comme généralement anticipé, des différences plus grandes, mais acceptables, ont été observées en validation. Ces différences ont été attribuées à plusieurs facteurs, tels que le manque de calibration avec des données sur une période longue, les représentations simplifiées des structures spéciales, les différences entre les mécanismes utilisés dans les modèles détaillés et conceptuels pour représenter le durée de pluie, et la configuration du code de modèle. Dans l'ensemble, la validation a été une réussite étant donné que la calibration a été effectuée à l'aide d'événements de courte durée alors que la validation a utilisé une longue série de données. En général, la procédure conçue a permis de réduire le travail manuel associé à la construction d'un modèle et à bien structurer la façon de construire des modèles conceptuels. Des connaissances pour chacune des différentes phases de modélisation ont également été acquises tout au long du processus du développement des deux modèles. Dans la phase ‹‹ Définition du projet ››, les objectifs du modèle conceptuel ont guidé la méthode de développement et de calibration du modèle. Les bassins versants et les égouts ont été délimités simultanément dans la phase de ‹‹ Développement du modèle ››, tout en tenant compte des emplacements des structures hydrauliques clés, des pluviomètres et des structures de débordement. La phase de ‹‹ Calibration ›› a permis l'avancement le plus systématique étant donné qu'un bon ordre de calibration a été défini et un ensemble limité de paramètres a été ciblé pour chacune des étapes de calibration. La phase de ‹‹ Validation ›› s'est révélée essentielle pour repérer des lacunes dans les hypothèses de base et les valeurs calibrées, afin de déterminer si le modèle est prêt à être utilisé ou doit être modifié. Une procédure efficace et structurée qui traduit les représentations des bassins versants urbains et des égouts de modèles détaillés en modèles intégrés conceptuels a été développée et appliquée avec succès à une étude de cas. Comme démontré dans ce projet, l'application de la procédure structurée mènera au développement efficace de modèles intégrés représentatifs, ce qui augmentera leur utilisation potentielle pour tester des scénarios réalistes. Pour raffiner et améliorer la procédure formulée, il est recommandé de l'appliquer à d’autres études de cas. / Modelling urban wastewater networks within integrated systems, focusing on both water quantity and quality, introduces flexibility to develop solutions with greatest benefit to the overall system. Integrated models provide benefits over traditional single sub-system models by facilitating efficient analysis of interactions between the individual components of urban water systems (i.e. catchments, sewers, treatment plants, and receiving waters) within a single modelling platform. The reduced complexity of this type of model decreases the computational burden compared to their detailed counterparts. This allows for a wider range of assessments such as scenario-testing, RTC optimization, and Monte Carlo uncertainty analyses. The potential to create these types of representative integrated models was proven in multiple studies, however, the current methods to develop these models are not well-established nor well documented, and therefore require significant work for each case study. Furthermore, the lack of a standardized method to represent the water quantity portion limits the wide-scale application of such models for water quality studies. Although research is required to further develop and optimize all methodologies involved with building Integrated Urban Wastewater System (IUWS) models, this project focuses on the simplified catchment and sewer conceptual models for water quantity. The objective of this study was to develop a structured procedure to translate detailed hydrologic and hydraulic models into the simplified conceptual models used in IUWS modelling. The aim was to improve repeatability, flexibility and efficiency of the general approach, regardless of chosen modelling platforms. This task was achieved by extracting the key steps and considerations while building two simplified conceptual models of a case study in central Ottawa, Canada. The central urban portion (6,400 ha) of a calibrated detailed PCSWMM model of the City of Ottawa, containing a mix of separated, partially-separated and combined sewer areas, was used as the reference model in this case study. The main task involved determining how to translate this detailed model into simplified conceptual models, using WEST as the platform, in a structured, systematic and repeatable way. The resultant developed procedure follows a similar sequence as the protocols reviewed in the literature review, while taking into consideration specifics related to aggregating catchments and sewers. The four main phases of this thesis are Project Definition, Model Development, Calibration and Validation. Two versions of the lumped model were created; the first was created with a certain level of aggregation, while the second was a further aggregation of the first model, resulting in about half the number of blocks and reservoirs. Both models were calibrated and compared to the detailed model as well as to each other. The simulation results showed that the volume and dynamics (ie. the shape of the hydrographs) of the conceptual models emulated those of the detailed model well (< < 10% differences), while providing a significant reduction in simulation-time speed-up (10 to 80 times faster than the detailed model). The simulation time reduction in the more aggregated model was not equivalent to the increased level of aggregation, mostly due to the fixed amount of basic calculation required in each model. As generally expected, larger but acceptable differences were found during the validation period compared to the calibration period. These differences were attributed to several factors, such as the lack of a long-time series calibration, oversimplified representations of special structures, the different mechanisms in the detailed and conceptual models used to represent wet weather flow, and the configuration of the model code. Overall, the validation was successful given the fact that the calibration was performed using events whereas the validation used an extended time series of 45 days. In general, the devised procedure helped reduce the manual labour associated with building a model and structured the approach to build the conceptual models. General findings from the various identified phases were also documented throughout the model building process. In the Project Definition phase, the conceptual model’s objectives guided the method of model development and calibration. The catchments and sewers were delineated concurrently in the Model Development phase, while taking into consideration the locations of the key hydraulic structures, raingauges and overflows. The Calibration phase allowed for the most systematic advancement of the model build, given that a good calibration order was defined and a limited set of parameters was targeted in each successive run. The Validation phase proved critical in pinpointing deficiencies in the initial assumptions and calibrated values, thus determining whether the model is ready for use or needs to be modified through one of the preceding phases. An efficient and structured procedure that translates catchment and sewer representations from detailed to conceptual models in IUWS was developed and successfully applied to a case study. As demonstrated in this project, applying the proposed structured procedure will lead to the efficient development of representative IUWS models, thus increasing their potential use to test real-life scenarios. To challenge and improve the formulated procedure, applying it to multiple case studies is recommended.
13

Simulations et stratégies de contrôle applicables à la gestion de la vidange du réservoir de rétention du site St-Sacrement du réseau sanitaire de la ville de Québec

Simoneau-Drolet, Daniel 11 April 2018 (has links)
Ce mémoire présente le développement d'un simulateur permettant d'étudier différentes stratégies applicables au contrôle de la vidange d'un réservoir de rétention du réseau sanitaire de l'est de la ville de Québec soit celui du site St-Sacrement. Dans un premier temps, le contexte du projet est présenté afin de bien comprendre les modèles qui sont proposés pour constituer le simulateur. Les modèles présentés, à prime abord, sont ceux par défaut, c'est à dire, disponibles avant la mise en service des installations. Cependant, les conditions hydrauliques de cette station de contrôle ne permettent pas de satisfaire toutes les hypothèses des modèles par défaut de telle sorte qu'une étape de calibration a été nécessaire. Suite à la réalisation de tests expérimentaux, différents modèles ont alors été calibrés afin d'augmenter la précision du simulateur. Ceci a permis de construire plusieurs simulateurs en fonction des modèles présentés (par défaut et expérimentaux). Des données expérimentales recueillies lors de la vidange contrôlée du 17 juillet 2005 ont permis de sélectionner le meilleur simulateur. Il s'est avéré que les modèles par défaut permettent de représenter le système avec précision sous réserve d'utiliser un bon délai d'écoulement entre le réservoir et la chambre de contrôle. Par ailleurs, des phénomènes en apparence complexes ont été modélisés avec des modèles relativement simples ce qui a permis d'augmenter du même coup la stabilité du simulateur. Le simulateur choisi a alors été utilisé pour tester et comparer différentes stratégies de contrôle pour la vidange du réservoir. Celui-ci a par ailleurs été modifié quelque peu afin de connaître la performance des différentes approches de contrôle présentées pour un système comportant des contraintes encore plus sévères. Les résultats montrent que les approches de contrôle plus avancées basées sur des modèles internes offrent de meilleures performances qu'un contrôleur PID mais qu'ils ne se démarquent significativement que pour les simulations utilisant des contraintes plus sévères. / This thesis presents the development of a Simulator to study various strategies applicable to control the emptying of a retention reservoir located at the St-Sacrement site, which is part of Québec City's Eastern wastewater collection network. The context of the project is first presented to fully understand the models proposed to build the Simulator. The models presented at first are default models, i.e. available before the commissioning of the facilities. However, because the hydraulic conditions of this control station could not satisfy ail the hypotheses related to the default models, some calibration was required. Following experimental tests, various models have been calibrated to increase the accuracy of the simulator. Several simulators were then built based on the models presented (default and experimental). The experimental data collected during the controlled emptying of the reservoir on July 17, 2005 was used to select the best simulator. It was found that default models can represent the network accurately provided that the flow is delayed between the basin and the control chamber. Also, some phenomena which seemed complex at first glance were simulated with relatively simple models, thus increasing the stability of the simulator. The selected simulator was then used to test and compare various control strategies for the emptying of the reservoir. The latter was later modified to assess the performance of the various control approaches for a System that included even more restrictive constraints. Results show that the more advanced control approaches, based on internal models, perform better than a PID controller. However, they stand out significantly only in simulations using more restrictive constraints.

Page generated in 0.0174 seconds