• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 2
  • Tagged with
  • 67
  • 18
  • 12
  • 6
  • 6
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

The management of conflict in the construction industry in Ghana

Ellis, Florence Yaa Akyia January 2012 (has links)
No description available.
52

Ανάπτυξη συστήματος στήριξης αποφάσεων για τη διαχείριση κινδύνων στα τεχνικά έργα

Γεωργαντοπούλου, Ανδριάνα 26 July 2013 (has links)
Σκοπός της διατριβής αυτής ήταν η ανάπτυξη ενός συστήματος για τη διαχείριση των κινδύνων στα τεχνικά έργα. Ο σχεδιασμός του προτεινόμενου συστήματος στοχεύει στο να αποκαλύψει στο χρήστη την πιθανότητα εμφάνισης συγκεκριμένων κινδύνων στο έργο και την επίπτωση αυτών στους στόχους του έργου (κόστος, χρόνος, ποιότητα, σκοπός) καθώς και να προτείνει αντίσοιχες δράσεις πρόληψης, για την μείωση είτε της πιθανότητας της εμφάνισης τους είτε για τη μείωση των συνεπειών τους στους στόχους του έργου. / A decision support system was developed in order to examine the probability of occurrence of certain risks in a construction project. Risk responses were developed so as to minimize either the probability or the impact of its identified risk
53

Factors affecting maintenance labour productivity in the building industry

Gaber Abubaker, Abubaker January 2016 (has links)
The research explored ways for improving maintenance labour productivity and reducing maintenance costs. This can be achieved through reducing the number of maintenance activities and by improving the productivity of labour carrying out repair and maintenance tasks. The research established that Integrated Logistics Support (ILS) techniques, in particular, Failure Modes and Effects Analysis (FMEA) and Reliability Centred Maintenance (RCM) could be applied to building systems, in this case to the maintenance of Rainwater Goods to identify the most applicable and cost effective maintenance strategy. As a result it was found that while 60% of failure modes identified could be rectified by employing a Failure-Based Maintenance strategy, 40% of the failure modes require a Condition-Based Maintenance strategy which is not currently applied. Labour productivity is a subject of tremendous interest to research in the construction industry; the study found however, very little research on the productivity of labour in building repair and maintenance operations. It was found that measurement of building maintenance labour productivity has not been the focus of any previous studies. Indeed no measures of productivity for building maintenance were identified. Having considered a number of alternative measures, the research identified the productivity index expressed in terms of Estimated Hours/Actual hours to be the most appropriate measure of labour productivity in repair and maintenance operations. Using this measure, it was established that labour productivity is impacted by a number of variables including task performance, labour performance, material usage and seasonal variability. Among the objectives of the research was to identify the factors influencing labour productivity. Through a survey questionnaire, it was possible to identify the factors that have the greatest impact on maintenance labour productivity; these were the level of skills and motivation of workmen; quality of information and work instructions; labour turnover and absenteeism; availability of tools and material, and access to the job site. The analysis of historical repairs data from two building repair and maintenance organisations revealed that during the performance of the same tasks, one of the data sources was almost 25% more productive than the other. The research has established that there is a potential for improving labour productivity carrying out building repair and maintenance.
54

Stakeholder engagement and sustainability-related project performance in construction

Menoka, Bal January 2014 (has links)
Stakeholders are considered to be one of the key drivers for any construction project. On the other hand, the performance of construction projects is primarily driven by sustainability-related targets. Hence, there is a need for a systematic approach to engage the stakeholders, as part of the Project Management process, to achieve the construction sustainability. This research focused on stakeholder engagement with the aim to improve the construction project performance through achieving construction sustainability. A framework is developed which integrates stakeholders with sustainability driven project performance. This research performs an empirical investigation through mixed-method research as the appropriate research technique. Data collection of this research is carried out in two stages. A series of semi structured interviews were carried out with 16 experienced UK construction professionals. Prior literature were used to design the interview questions about different issues related to the stakeholder engagement, construction sustainability and construction project performance. The aim of the interview is to investigate the current issues and practices of the construction projects are facing relating to engaging stakeholder to make the construction sustainable to improve the construction project performance. Some of the hypotheses are generated relating to the findings from the interviews and literature reviews. After analysing the interviews, a questionnaire is designed based on the findings from the interviews. Questionnaires were mailed to 500 UK construction companies and 233 (46 per cent) responses were received. The aim of this survey is to find out a structured and appropriate methodology to accomplish the requirements of making the construction sector more sustainable by improving its performance. Typically, questionnaires will be used to get the participants opinion in order to produce data to follow. These data will be used to test the hypothesis. These two approaches were adopted to align the participant’s opinions and beliefs and to develop jointly acceptable strategies with agreed long-term, sustainable solutions. Statistical Package for Social Science [SPSS] is selected and used to analyse the questionnaire responses. Correlation analysis revealed that the extent of the impact of stakeholder engagement to achieve the construction sustainability and improving the construction project performance. ANOVA revealed the variation of the perception of participant’s roles and companies’ strategic focuses towards the stakeholder’s engagement, construction sustainability and construction project performance. In essence, adhering to the various levels of implementation presented will ensure that construction sector can derive the maximum benefit from stakeholder engagement and that the decision-making process and the actions regarded as critical are taken into consideration. Based on the findings from the interview and questionnaire survey a conceptual framework is set out that underline the preparation and presentation of stakeholder engagement to improve the construction project performance through achieving construction sustainability. This derived framework demonstrates that such engagement can be valuable in anticipating the expectations of the different stakeholders from the projects, which may impact on behaviour. Finally, this research provides recommendations from both a theoretical and practical point of view to improve the stakeholder’s impact on construction sustainability and construction project performance.
55

The promotion of sustainable construction practices in Kuwait

Al Sanad, Shaikha Abdulattef January 2014 (has links)
The construction industry has a significant impact on the environment. It is responsible for a large proportion of global CO2 emissions, as well as the use of both natural resources and energy reserves. Green building practices are becoming increasingly recognised as a way of mitigating CO2 emissions and energy consumption, with economic, environmental, social and financial benefits accruing. The aim of the research reported here is to investigate the opportunities to promote sustainable construction practices in Kuwait. This entails identifying the current status of green construction practices, the awareness level of construction stakeholders, the key drivers that motivate the implementation of green practices, as well as barriers to green construction and the risks associated with its implementation. After comprehensively reviewing the literature, primary data were collected and analysed in three phases, using quantitative and qualitative approaches. The three phases of primary data gathering consist of conducting a questionnaire survey, an interview survey and running a simulation. Local stakeholders associated with the Kuwaiti construction industry are the target population and are used as a platform from which to obtain the data. A total of 678 questionnaires were distributed and 504 completed questionnaires were received, while a total of 96 interviews were conducted. The quantitative data is then analysed through descriptive analysis and inferential statistics with the help of SPSS and Microsoft Excel, while the qualitative data is analysed using the content analysis method. Simulation analysis is performed using IES VE (Integrate Environmental Solution) computer simulation software in order to demonstrate the impact different construction materials have on the energy efficiency of the building. The main findings of this research are as follows: implementation of the concept of sustainability is low in the Kuwaiti construction industry; more action and strategies to improve and encourage this concept are therefore required in order for it to be applied efficiently in future construction projects; lack of awareness is found to be the main barrier to the use of green construction methods in Kuwait; the Kuwaiti government must take initiatives in terms of introducing standards, policies and incentives to promote green construction; the risks affecting the development of green construction processes vary and are unevenly distributed throughout the construction industry in Kuwait, but common risks, such as ‘lack of experts’, ‘limit of a green supply chain’, ‘lack of experts ‘ and ‘higher cost’, are considered the most important risks overall; improved measures concerning the use of energy-saving materials can facilitate the achievement of energy-effective building design. The findings of this study provide valuable information for organisations that intend to participate in green construction projects in Kuwait. Recommendations based on the research findings and conclusions are offered to the Kuwaiti construction industry and government. Recommendations for further research are identified.
56

Reducing construction waste in healthcare projects : a project lifecycle approach

Domingo, Nikula January 2011 (has links)
Construction waste generation is a global issue in the sustainable construction context and several studies have been performed in different parts of the world to develop methods and tools for waste prevention, reduction, reuse and recycling. Most of these studies adopted a linear approach by focussing on a specific project phase, such as design, procurement or construction. However, there is a consensus in the literature that factors causing construction waste span across the project life cycle and recent researchers emphasised the need for a more integrated lifecycle approach to holistically assess and evaluate causes of waste to suggest recommendations to reduce lifecycle construction waste generation. Over recent years, the UK government has been investing billions of pounds in new and refurbished healthcare projects, where the healthcare buildings are often referred to, in literature, as complex buildings. This large investment has created a number of sustainability issues including water consumption, CO2 emissions, energy consumption, and more significantly construction waste generation. However, no significant research has been undertaken to propose a systematic construction waste minimisation mechanism for healthcare construction projects. Therefore, this research aims to develop a lifecycle construction waste minimisation framework for healthcare projects (HC-WMF). In order to identify the research problem and construction waste generation issues peculiar to healthcare projects, nine preliminary interviews were conducted with healthcare clients (N=3), architects (N=3), and contractors (N=3). The findings revealed that healthcare projects generate high rates of waste compared to other building projects throughout the project lifecycle, identified complex features that have an effect on waste generation, and identified particular causes of construction waste in healthcare projects. A further in-depth study based on four case studies was undertaken to understand the impact of waste generation due to the causes of waste, the relationship between complex features in healthcare projects and the causes of waste, and best waste minimisation practices to be implemented throughout a healthcare project lifecycle to address construction waste causes. Three interviews (client, architect, and contractor) from each case study were undertaken during the data collection stage. A Healthcare Construction Waste Minimisation Framework (HC-WMF) and Self-Assessment Tool (SAT) were then developed based on the findings of the literature review, preliminary data collection study and case studies, and adoption of the key concepts of problem solving methodology. This HC-WMF comprised six waste minimisation strategies (project documents management, stakeholders waste awareness, communication and coordination, buildability, materials selection and procurement, and change management) to be followed throughout the lifecycle stages of a healthcare project. SAT provides a means to assess the effectiveness in implementing HC-WMF and to obtain feedback and learning outcomes for continuous further improvements. In order to validate the developed HC-WMF and SAT a validation questionnaire (N=26) and validation interviews (N=4) were conducted. The validation results showed that the HC-WMF and SAT would be very useful in reducing construction waste generation from healthcare projects. The research contributes to construction waste minimisation research introducing a novel approach to lifecycle waste reduction. Also, the research revealed the complex features in healthcare projects that affect construction waste generation, causes and origins of waste peculiar to healthcare projects, and best waste minimisation strategies to implement to reduce construction waste generation from healthcare projects. Most importantly, through HC-WMF, this research produced a set of guidelines to be followed throughout the healthcare project lifecycle to reduce construction waste generation. The study has made recommendations which, if adopted, will lead to significant improvements in sustainable healthcare construction due to construction waste minimisation. The content should be of interest to clients, designers, and contractors dealing with construction waste minimisation and sustainable construction in healthcare projects. Key words: Construction waste, Healthcare, Causes of waste, Healthcare complexities, Waste minimisation, UK.
57

Development of a risk response model to handle delays of construction projects in the United Arab Emirates

Motaleb, Omayma Hashim January 2014 (has links)
Due to the complex nature of construction projects, delay risks are more widespread in the construction sector than elsewhere. This poses a problem for the industry, since it is already at risk because of the recent global economic recession. Indeed, the financial crisis in late 2008 arrested economic development in the construction sector in the United Arab Emirates (UAE), with the result that investors’ confidence in the sector is severely depressed. In this situation, effective risk response is urgently required, since it aims to ensure that all project objectives, including avoiding delays, are met. In itself, the risk response process is a core element of risk management and perhaps the most important area needs to be improved. The aim of the research work that underpins this thesis was to develop a model for effective risk response to help in controlling delay risks. First, the strengths and weaknesses of current risk response processes have been analysed through a comprehensive critical literature review. Common causes of delay risks have been identified and various traditional measures used for their control have been critically reviewed. The greatest deficiencies in all published measures of delay risks control in construction projects are related to the lack of risk response development and appropriate measures (preventative/mitigating), within the risk management process. From the literature review it was also possible to identify the most appropriate methodology to adopt for the current research. A robust research methodology was then outlined which involved a questionnaire survey, case studies and interviews to confirm the literature review results and to achieve the research objectives. The questionnaire was piloted with nine construction professionals in the UAE for its suitability with the envisaged sample. After the pilot the questionnaire was refined then administered in 35 construction, consultancy, and contracting companies, attracting 102 usable responses. The results of the questionnaire confirmed the literature review results. Accordingly, six case studies from three companies were identified and supplemented by face-to-face interview, documents and direct observations. This strategy allowed the research evidence to be triangulated and thus the researcher to be more confident in testing a particular concept or theory. From the results it emerged that most organisations have immature project management systems and poor risk response processes. Hence, 22 Key Success Factors (KSFs) of preventative measures and 15 KSFs of mitigation measures were identified to achieve risk response development by maturity levels in the pre-construction stage and in the construction stage, respectively. The analysis of the case studies revealed the great potential for employing five KSFs of mitigation measures in the risk response development to control delay risks. Having considered these outcomes a risk response development model to control delay risks has been outlined. The model has been carefully validated, both theoretically and in practical terms, through the discussions with interviewees from the selected case studies. The interviewees agreed on the practicality of the model to identify the risk response development, however it is recommended that the project risk event severity and the company capability would need to be taken into account, and the demand to format the test stage for the maturity levels at the transition stages (Disciplinary, Consistency, Integration, and Optimisation) to achieve the effectiveness and the transparency of the model. Based on the validation, it is anticipated that by developing the risk response model, the process itself will be more objective, particularly in delay risks control. The study brings forward findings that can be promoted as the means to enhance opportunities to control delay risks, and benefit practitioners in the UAE given that so far, there has been no model of risk response development by maturity levels for delay risks control. Moreover, one of the unique features of the study is the creation of new knowledge by focusing on the UAE. At the same time, the use of maturity modeling to handle construction delay risks provides new knowledge for a wider audience.
58

An investigation into the implementation of the construction (design and management) regulations in the construction industry

Mzyece, Dingayo January 2015 (has links)
The European Union (EU), in 1992, issued the Temporary or Mobile Construction Sites (TMCS) Directive, which requires EU members to introduce specific law to improve health and safety (H&S) performance outcomes by placing specific duties on key stakeholders. This Directive led to the introduction of the first Construction (Design and Management) (CDM) Regulations in the UK construction industry on 31 March 1995 and since their introduction, the overall performance of construction H&S has improved gradually. However, despite this positive outlook, there are still significant concerns surrounding the implementation of the CDM Regulations, a subject on which empirical research has been very scanty. It is against such a background that this study investigates the practical implementation of the CDM Regulations and extends current knowledge and understanding, and develops a framework for appropriate remedial action by industry. The research method involved a thorough critical review of literature, semi-structured interviews, and two postal questionnaire surveys, using as research informants, practitioners with experience of the Designer, CDM Coordinator (CDM-C), and Principal Contractor (PC) roles under the CDM Regulations. Primary data were collected and analysed from in-depth interviews with six organisations purposively selected based on their construction design expertise and 122 questionnaires returned in total. The finding regarding lack of collaborative working amongst duty holders is a significant outcome of this study; a requirement expressed explicitly within the CDM Regulations, yet questionable in terms of its implementation. Further, the study reveals a number of statistically significant correlations between the extent of discharge of duties and their perceived degree of importance. However, the strength of the majority of these correlations is weak. In particular, the evidence indicates that 50% of the duties of the CDM-C are misaligned in terms of extent of discharge and perceived degree of importance, whereas 25% of the PC duties are also misaligned. This signals a lack of understanding regarding the importance of duties, towards achieving improved H&S management. Surprisingly, a comparison between extent of discharge of duties and their perceived degree of difficulty reveals that all the duties of the PC are statistically significant, meaning that the perceived degree of difficulty does not impede their extent of discharge. While 90% of the CDM-C duties are also statistically significant, again the same interpretation applies. Further, a consensus reached by Designers supports the view that CDM-Cs provide insufficient input throughout the planning and construction phase, raising doubt as to whether the duty holder is fit for purpose. Overall, the results confirm that interdependent working of duty holders is still a challenge, demonstrated by the Designer duty to ensure appointment of the CDM-C (Regulation 18(1)), the CDM-C duty to ensure Designers comply with their duties (Regulation 20(2)(c)), and the PC duty to liaise with the CDM-C and Designer (Regulation 22(1)(b)). Three recurring themes emerge from the results, that is: (i) collaboration, (ii) accountability and compliance, and (iii) facilitation, which in turn inform the remedial action framework comprising 13 remedial actions and 8 change drivers. Validation of the remedial action framework by 15 study participants reveals that, at least 10 remedial actions and 7 change drivers are considered likely to improve CDM implementation. The top three remedial actions are: (i) ensuring adequate arrangements for coordination of H&S measures; (ii) including provisions within the regulations specifying the stages for the appointment of duty holders; and (iii) amending the ACoP to provide guidance on determining what resources are adequate for a particular project. Whereas, the top three change drivers are: (i) management leadership; (ii) the proactive participation of duty holders; and (iii) training to equip duty holders with sufficient knowledge on provision of timely and adequate preconstruction information. Based on these outcomes, conclusions, recommendations, and further areas of research are drawn.
59

Risk management in fast-track projects : a study of UAE construction projects

Harthi, Bader Ahmed Al January 2015 (has links)
This thesis is about risk management in fast-track construction projects. The aim of the study is to identify the risks in the UAE construction industry, understand how they are dealt with, and propose more effective frameworks for risk management in fast-track construction. A mixed method approach was used to fulfil the objectives of the study. 65 questionnaires were distributed to professionals in the construction industry, including contractors, sub-contractors, project managers and private consultants. Their responses were analysed using statistical techniques, and the results taken for discussion to a focus group of eleven experienced construction managers and experts. Secondary data was also collected via literature reviews of print and website articles, and of books and documents from company, government and industry-specific databases. The findings show that risks in construction projects can be internal or external, and that in the UAE, owner- and design-related risks are seen as the most significant. Knowledge about risk management is present, but more needs to be done to eradicate the problems associated with poorly managed fast-track construction projects. Using the suggestion of the focus group, a framework for risk mitigation was developed based on the Alien Eyes’ risk and Qualitative Risk Management models. The study discusses the implications of risk management for practitioners and academicians in the construction industry. Poor risk management, which is usually the consequence of inadequate recognition of and/or responsiveness to risks and uncertainties, can have a devastating impact upon projects. It is hoped that practitioners applying the findings and suggestions in this study will see positive change, improved profitability and greater competitive advantage as a result.
60

Development of an integrated business improvement system for construction

Beatham, Simon January 2003 (has links)
The construction industry has inherent problems due to its structure and fragmentation. Its poor performance has been challenged by its client base and it has been forced to seek ways to deliver improved performance. This project was initiated as a response to this challenge and represents one organisation's attempt to deliver improvements. This organisation provides both design and construction solutions, offering ‘total life of asset support' from business consultancy through to decommissioning, in a neutral contractual environment. Initial investigations of the integration of design and construction and of the use of the EFQM Excellence Model concluded that a holistic view of the organisation's performance was needed. Most organisations use traditional, easily quantifiable measures, such as time and cost, whilst neglecting the softer cultural issues, as a way of assessing overall business performance. This prompted further research into the use of performance measurement and also a review of the culture that existed within the organisation. It became clear that many performance initiatives failed because of the lack of ‘Change Action driven by Results (CAR)'. The failure to initiate change or implement action based on the results achieved, means that performance measures are not being integrated into the management systems of the organisations. Based on the conclusions of this work, this project has developed and implemented the Integrated Business Improvement System (IBIS) within the primary case study unit and also two other organisations, all of which are part of AMEC Plc. The project details the barriers that were experienced during the development and implementation of the system and concludes that it is the human component that is critical for the successful implementation and use of any improvement system. The findings of this work have been presented in five peer- reviewed papers.

Page generated in 0.0526 seconds