Proyects by direct management and custom proyects: solution or problem? Should we restrict them? / Las Obras por Administración Directa y por encargo: ¿Solución o problema? ¿Hay que restringirlas?

Morón Urbina, Juan Carlos 12 April 2018 (has links)
The author performs an analysis of the power that public entities have, under certain assumptions, to attend their own needs for goods, services and proyects without the need of contracting with private individuals, but using self-provision. The study covers the conditions under which entities can opt for this alternative, the limits that exist for it and the consequences they bring to the effectiveness of the entity’s management. In addition, the author proposes considerations that should be adopted by legislation in the field for greater control and verification of the conditions of effectiveness. / El autor realiza un análisis de la facultad que tienen, bajo ciertos supuestos, las entidades públicas para atender sus propias necesidades de bienes, servicios y obras sin necesidad de contratar con privados, sino recurriendo a la autoprovisión. El estudio realizado abarca las condiciones en las cuales las entidades pueden optar por esta alternativa, los límites que existen para ello y las consecuencias que traen para la eficacia de la gestión de la entidad. Además, el autor propone consideraciones que debería adoptar la legislación en la materia para un mayor control y verificación de las condiciones de eficacia.
2

Análisis de la Productividad y Propuesta de Directiva de Procedimientos para la Ejecución de Obras en la Modalidad de Administración Directa de la Universidad Pública De Cerro De Pasco – 2020 / Analysis of Productivity and Proposal for a Procedure Directive for the Execution of Works in the Direct Administration Mode of the Public University of Cerro De Pasco - 2020

Porras Arroyo, Edinson José, Zevallos Solis, Huber Jesús, Chavez Rios, Eric Miguel 03 June 2020 (has links)
Actualmente la economía del Perú está estrechamente vinculada con el sector construcción, existen diversos factores por qué este sector no ha crecido, específicamente en el sector público. Durante el 2018 el estado peruano contó con más de 49 (cuarenta y nueve) mil millones de soles programados para ejecución de Obras (Según Consulta Amigable del Portal del Ministerio de Economía y Finanzas), sin embargo, solo se han gastado treinta y dos mil millones de soles en inversiones de obras lo que hace que existe diversos factores que influyen que este dinero programado no se pueda gastar. De estos cuarenta y nueve mil millones de soles en proyectos para ejecución están incluidos la construcción de obras por administración directa el cual por los problemas que existe en el sector construcción siendo el desconocimiento acerca de la ejecución de obras por administración directa hace que este monto programado no supere 65% de ejecución presupuestaria. El sector Educación durante el año 2018 ha contado con más de 1,500 millones de soles en gastos programados para la ejecución del año fiscal 2018, siendo ejecutados alrededor de un 71% lo que significa que no existe éxito en la ejecución de gasto presupuestal en este sector, La UNDAC para el 2018 ha programado más de 18 millones de soles en ejecución de obras por administración directa e indirecta ejecutando solo un 27.7% lo que significa un bajo nivel de gasto presupuestal y un problema para solucionar esta brecha. Este trabajo de investigación desarrollará una propuesta de directiva para ejecución de obra por la modalidad de administración directa ya que la UNDAC no cuenta a la fecha con una directiva eficaz para esta modalidad de ejecución de obras. En el capítulo I de este Proyecto de Investigación se planteará el problema de investigación evidenciando los objetivos y la justificación de nuestro trabajo de investigación. En el Capítulo II presentaremos el marco teórico en relación a la ejecución de obras por la modalidad de administración directa, indicando los antecedentes, palabras claves, definición de conceptos básicos y la hipótesis de nuestro trabajo de investigación. En el Capítulo III presentaremos la metodología de investigación indicando el tipo, diseño y metodología de investigación como también el procesamiento y análisis de datos de los proyectos evaluados y de la directiva planteada. En el Capítulo IV explicaremos todos los resultados que emanan de nuestro trabajo de investigación en base a índices, montos, y acciones que resulta de la implementación de la directiva y por último se discutirá en el Capítulo V las conclusiones y recomendaciones que derivan de la investigación. / Currently the economy of Peru is closely linked to the construction sector, there are currently several factors why this sector has not grown specifically in the public sector. During 2018, the state had more than 49 billion soles scheduled for the execution of Works (According to the Friendly Consultation of the Portal of the Ministry of Economy and Finance), however, only 32 billion soles have been spent on construction investments. which causes that there are several factors that influence that this programmed money cannot be spent. Of these 49 million in Projects for execution, the construction of works by Direct administration is included which, due to the problems that exist in the construction sector, the lack of knowledge about the execution of works by direct administration means that this programmed amount does not exceed 65% of Budget Execution. The Education sector during 2018 has had more than one thousand five hundred million soles in expenses planned for the execution of fiscal year 2018, being executed around 71% which means that there is no success in the execution of budget expenditure in this sector, UNDAC for 2018 has programmed more than 18 million soles in execution of works by direct and indirect administration, executing only 27.7%, which means a low level of budgetary expenditure. This research work will develop a proposal for a directive for the execution of work by the direct administration modality since UNDAC does not have an effective directive for this type of execution of works. In Chapter I of this Research Project, the research problem will be presented, evidencing the objectives and justification of our research work. In Chapter II we will present the theoretical framework in relation to the execution of works by the direct administration modality, indicating the background, keywords, definition of basic concepts and the hypothesis of our research work. In Chapter III we will present the research methodology indicating the type, design and research methodology as well as the data processing and analysis of the projects evaluated and the proposed directive. In Chapter IV we will explain all the results emanating from our research work based on indices, amounts, and actions resulting from the implementation of the directive and Finally, the conclusions and recommendations derived from the investigation will be discussed in Chapter V. / Trabajo de investigación
3

Propuesta de implementación de la metodología last planner system en obras de defensa ribereña en la modalidad de ejecución de obra por administración directa. Caso de estudio: construccion de defensa ribereña del Rio Huatanay – Cusco

Carrasco Muñoz, Miriam, Contreras Cusi, Leonid Simón 15 September 2021 (has links)
La siguiente investigación tiene por objetivo principal elaborar una propuesta de implementación de metodologías de gestión que permitan que las obras publicas cumplan con sus plazos y presupuestos. Es muy común que los proyectos ejecutados bajo la modalidad de administración directa en la región de Cusco no cumplan con los objetivos de plazo y costo inicialmente trazados. La investigación se centra en el análisis y evaluación de un proyecto público de construcción de defensas ribereñas en la región de Cusco ejecutado bajo la modalidad de administración directa que a lo largo de su ejecución ha presentado constantes solicitudes de ampliaciones de plazo y presupuesto. La presente investigación elabora una propuesta de implementación de la metodología Last Planner System adaptando los conceptos y buenas prácticas del Lean Construction a la ejecución de proyectos bajo esta modalidad. En esencia esta investigación comprende el desarrollo del marco teórico, la evaluación del estado situacional del caso de estudio en donde se ha analizado la incidencia del factor humano, la procura de los materiales y la planificación de obra, un capítulo en el cual se ha elaborado la propuesta de implementación basada en la aplicación racional de los principios Lean y Last Planner System adaptado a proyectos ejecutados bajo la modalidad de administración directa y el caso de estudio y por ultimo un capítulo en el cual se ha calculado los costos de implementación de la propuesta y detallado los beneficios de dicha implementación. / The main objective of this research is to work on a proposal for the implementation of management methodologies that allow public works to meet their deadlines and budgets. It is very common that projects executed under the modality of direct administration in the Cusco region do not meet the deadline and cost objectives initially set. The research focuses on the analysis and evaluation of a public project for the construction of riparian defenses in the Cusco region executed under the modality of direct administration that throughout its execution has presented constant requests for extensions of term and budget. This research elaborates a proposal for the implementation of the Last Planner System methodology, adapting the concepts and good practices of Lean Construction to the execution of projects under this modality. In essence, this research includes the development of the theoretical framework, the evaluation of the situational state of the case study where the incidence of the human factor has been analyzed, the procurement of materials and work planning, a chapter in which the implementation proposal has been elaborated based on the rational application of the Lean and Last Planner System principles adapted to projects executed under the modality of direct administration and the case study and finally a chapter in which the costs of implementation of the proposal have been calculated and detailed the benefits of said implementation. / Trabajo de investigación
4

Implementación del sistema Last Planner para la mejora de la etapa de planeación en la construcción de muros de contención, caso región Cusco, 2021 / Implementation of the Last Planner system to improve the planning stage in the construction of retaining walls, Cusco region, 2021

Mejía Olivera, Brandon David, Chavez Palomino, Leonardo German 25 November 2021 (has links)
El presente trabajo de investigación tiene la finalidad de implementar el Sistema Last Planner como parte de la etapa de planeamiento del expediente técnico de una obra piloto ejecutada bajo administración directa del Gobierno Regional de Cusco. Con la finalidad de gestionar las restricciones identificadas durante la ejecución de obra. Se obtuvo que las principales restricciones fueron la responsabilidad de los ejecutores de obra y a su vez agentes externos de los que depende el avance, los tiempos previstos en el expediente técnico no son flexibles ante cambios o imprevistos y finalmente que los proveedores no cumplen la entrega puntual de bienes y servicios. El contexto se planteó desde las definiciones y normas que rigen al gobierno regional, su sistema de funcionamiento a través de unidades ejecutoras y finalmente a las obras ejecutadas bajo administración directa de la sede central del gobierno regional de donde se seleccionó una obra piloto que culmino su ejecución recientemente para recoger las restricciones y problemas que tuvo. Luego aplicar el sistema Last Planner al expediente técnico de la obra piloto se pudo comparar con el proyecto inicial donde finalmente se concluyó que implementar el Last Planner logra un mejor desempeño al tener herramientas suficientes para garantizar el cumplimiento de las asignaciones en el tiempo establecido, lo que se refleja en menos inventarios intermedios estancados y mejor optimización del uso de mano de obra. / The purpose of this investigation work is to implement the Last Planner System as part of the planning stage of the technical file of a pilot project executed under the direct administration of the Regional Government of Cusco. To manage the restrictions identified during the execution of the work. It was found that the main restrictions were the responsibility of the work executors and external agents on which progress depends, the times provided in the technical dossier are not flexible to changes or unforeseen events and finally that suppliers do not meet the timely delivery of goods and services. The context was approached from the definitions and norms that govern the regional government, its system of operation through executing units and finally to the works executed under direct administration of the regional government headquarters, from which a pilot work was selected that recently finished its execution to collect the restrictions and problems it had. After applying the Last Planner system to the technical file of the pilot project, it was possible to compare it with the initial project where it was finally concluded that implementing the Last Planner system achieves better performance by having sufficient tools to guarantee the fulfillment of the assignments in the established time, which is reflected in less intermediate inventories stagnant and better optimization of the use of labor. / Tesis