• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 2
  • 2
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

DB 2020: Analyzing and Forecasting DB Market Trends

January 2014 (has links)
abstract: Over the last two decades, Alternative Project Delivery Methods (APDM), such as Design-Build (DB), have become more popular in the construction industry, specifically in the U.S., and the competition for APDM projects has risen among construction companies. The Engineering News Record (ENR) magazine analyzes DB firms and publishes the list of the top 100 every year. According to ENR articles and many scientific papers, the implementation of DB method has grown drastically over the last decade, however, information about growth trends depending on firm size and segment is lacking. Also missing is knowledge the future market trends over the next five years. Furthermore, public agencies and DB firms may be worried that DB projects do not distribute wealth equally among DB firms. Using the top 100 firms deemed representative of the DB market, the author has divided the market into volumes based on rankings to analyze the total DB market revenue growth. A comparison between international and domestic revenues indicated that the top five DB firms have 64% more involvement in the international market compared to the domestic market. Furthermore, while the research shows increasing market share only for the top five firms, the author has found that (1) a large portion of their market share is due to a large growth in their international market, and (2) revenues for all volumes of the DB market have increased. Moreover, regression and time series analyses allow for the forecasting of the DB market growth, which the author anticipate to move from about $100B to about $150B in 2020. / Dissertation/Thesis / Masters Thesis Construction 2014
2

Performance of the Construction Manager at Risk (CMAR) Delivery Method Applied to Pipeline Construction Projects

January 2015 (has links)
abstract: Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as Construction Manager at Risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. CMAR project performance impacts have been studied in the horizontal and vertical construction industries. However, the performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied. The dissertation fills this gap in knowledge by performing the first quantitative analysis of CMAR performance on pipeline engineering and construction projects. This study’s two research objectives are: (1) Develop a CMAR baseline of commonly measured project performance metrics (2) Statistically compare the cost and schedule performance of CMAR to that of the traditional DBB delivery method A thorough literature review led to the development of a data collection survey used in conjunction with structured interviews to gather qualitative and quantitative performance data from 66 completed water and wastewater pipeline projects. Performance data analysis was conducted to provide performance benchmarks for CMAR projects and to compare the performance of CMAR and DBB. This study provides the first CMAR performance benchmark for pipeline engineering and construction projects. The results span across seven metrics in four performance areas (cost, schedule, project change, and communication). Pipeline projects delivered using CMAR have a median cost and schedule growth of -5% and 5.10%, respectively. These results are significantly improved from DBB baseline performance shown in other industries. To verify this, a statistical analysis was done to compare the cost and schedule performance of CMAR to similar DBB pipeline projects. The results show that CMAR pipeline projects are being delivered with 6.5% less cost growth and with 12.5% less schedule growth than similar DBB projects, providing owners with increased certainty when delivering their pipeline projects. / Dissertation/Thesis / Doctoral Dissertation Civil Engineering 2015
3

Design-Build in the Commonwealth of Massachusetts

Sader, Roula E. 08 May 2003 (has links)
Massachusetts General Laws (M.G.L.'s) require state agencies to procure construction contracts using the design-bid-build project delivery system, unless special legislation is enacted to allow the use of alternative methods. Considering the wide range of alternative delivery methods for construction contracts, this thesis focuses on design-build on public projects. Even though Massachusetts laws do not expressly prohibit design-build, they do preclude its use indirectly by requiring the separation of design and construction services, and by requiring that construction contracts be awarded to the lowest responsible bidder only after the project is fully designed. The objectives of this study are to specifically examine the reasons behind the legislature unwillingness to allow design-build as a conventional project delivery method; and to determine the likelihood that design-build will become a conventional delivery system in Massachusetts in the future. For this purpose, several academic research papers, case studies and industry reports have been reviewed. As well, pertinent sections of the M.G.L.'s and other references have been examined. Personal interviews were conducted with key representatives of the public and private sectors, who provided valuable input regarding design-build on public projects. The analysis of the information collected reveals that three principal areas seem to hinder any successful attempts to enact a legislation making design-build a conventional delivery method. These areas can be summarized as (1) loss of opportunities for the design and construction community, (2) technical and management issues at the public sector level, and (3) nature of the political environment in Massachusetts. Due to the unpredictable political environment, and the competing interests within the private sector, within the public sector, and between the private and public sectors, it is highly unlikely that design-build will become a conventional delivery method for public projects in the near future. The report concludes with recommendations to increase the likelihood of design-build to become a conventional project delivery method, considering the issues denoted above.
4

Project Delivery Method Performance Evaluation for Water and Wastewater Capital Projects

January 2018 (has links)
abstract: The water and wastewater industry in the United States is in dire need of renovation due to dwindling infrastructure and requires substantial reinvestment. Design-bid-build (DBB) is the traditional method of project delivery most widely applied in this industry. However, alternative project delivery methods (APDM) are on the rise and touting the benefits of reduced project schedule and cost. The main purpose of this study is to conduct a qualitative and quantitative performance evaluation to assess the current impact of APDM in the water and wastewater industry. A national survey was conducted targeting completed water and wastewater treatment plant projects. Responses were obtained from 75 utilities and constructors that either completed their projects using DBB, construction manager at risk (CMAR), or design-build (DB). Data analysis revealed that CMAR and DB statistically outperformed DBB in terms of project speed and intensity. Performance metrics such as cost growth, schedule growth, unit cost, factors influencing project delivery method selection, scope changes, warranty and latent defects, and several others are also evaluated. The main contribution of this study was that it was able to show that for the same project cost, water and wastewater treatment plants could be delivered under a faster schedule and with higher quality through the utilization of APDM. / Dissertation/Thesis / Masters Thesis Construction Management 2018
5

Innovative Delivery of Water Infrastructure Projects

January 2020 (has links)
abstract: Water utilities across the United States are facing numerous challenges, such as limited funding and increasing project complexity, in constructing and upgrading their aging infrastructure. One innovative method to overcome these challenges is through the use of alternative project delivery methods (APDM), such as construction management at-risk (CMAR) and design-build (DB). Previous research has shown that APDM have the potential to deliver higher performing water infrastructure projects when compared to the traditional design-bid-build (DBB) method. However, there is a need to further examine APDM practices and develop tools that may support utilities in the delivery of their APDM water infrastructure projects. This study fills the knowledge gap by conducting several studies that may support public and private utilities in improving the delivery of their APDM water infrastructure projects. First, APDM implementation practices for water infrastructure projects are identified by assessing the state of practice, particularly during project procurement and execution. Second, DB project administration best practices are determined to support utilities seeking to add DB to their organization’s project delivery toolbox. Third, a pioneering web-based project delivery method decision-support tool was developed to aid utilities in selecting the appropriate delivery method for their water project. Finally, project-specific factors and attributes that impact project delivery performance are investigated through exploratory modeling and analysis. The study collected data on 75 completed treatment plant projects, conducted interviews with ten utilities that successfully deliver their water projects using DB, and worked closely with several industry experts through industry workshops and panels. Key findings related to water infrastructure project delivery revealed in this study included: (1) guaranteed maximum price (GMP) is the preferred compensation type for APDM projects; (2) utilities statistically having the lowest comfort level with delivering CMAR projects; (3) qualifications-based procurement is an effective DB project delivery practice; (4) the identification of 13 key project delivery method selection factors; and (5) the three highest predictors that impact unit cost performance are project complexity, project team chemistry and communication, and project size. / Dissertation/Thesis / Doctoral Dissertation Civil, Environmental and Sustainable Engineering 2020
6

Organizational Change Management for the Adoption of Alternative Project Delivery Methods within the AEC Industry

January 2020 (has links)
abstract: The alternative project delivery methods (APDMs) today are being increasingly used by owner organizations in the architecture, engineering, and construction (AEC) industry. Yet the adoption of these methods can be extremely difficult to accomplish and requires significant change management efforts. To facilitate the APDM adoption, this research aimed to better understand how AEC owner organizations have changed from only using the design-bid-build method to also successfully implementing APDMs from an organizational change perspective. This research utilized a literature review, survey and interviews to fulfill the research objectives. The dissertation follows a three paper format. The first paper focuses on identifying organizational change management (OCM) practices that, when effectively executed, lead to increased success rates of adopting APDMs in owner AEC organizations. The results of the first paper indicated that the five OCM practices with the strongest correlations to successful APDM adoption were realistic timeframe, effective change agents, workload adjustments, senior-leadership commitment, and sufficient change-related training. The second paper focuses on investigating AEC employees’ reactions to the adoption of APDMs. The findings of the second paper revealed that employees in AEC organizations react favorably to adopting a change in their project delivery systems. The findings further revealed that increasing the use of OCM practices is related to decreased employee resistance to change. The third paper aimed to provide guidelines detailing on how to lead APDM adoption. The findings of the third paper indicated that there was a general sequence of four implementation phases, which were preparing and planning, pilot project testing, expanding to the intended scale, and sustaining and evaluating. The phases include specific OCM practices that increase the probability of successful APDM adoption. The dissertation results can help in guiding the senior managers of construction organizations and OCM consultants to effectively implement APDMs for the first time in the construction sector. / Dissertation/Thesis / Doctoral Dissertation Construction Management 2020

Page generated in 0.1101 seconds