• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Geležinkelio ruožo „Vilnius – Turmantas“ pastatų (XIX a.II p.- XX a. I p.) architektūros raiška / Railway buildings architectural expression on the section Vilnius - Turmantas (time-period between second half of the 19th c. – first half of the 20th c.)

Zacharov, Sergej 08 July 2009 (has links)
Pagrindinis magistrinio darbo tikslas yra geležinkelio ruožo „Turmantas – Vilnius“ (geležinkelio atkarpos „Peterburgas – Varšuva“ atkarpos) pastatų architektūrinės raiškos tyrimas, tipologinės grandinės sudarymas. Darbe analizuojama objektų bei jų išdėstymo stotyse kompoziciją, apibūdinami pagrindiniai veiksniai nulemiantys kompozicijos savybes. Nagrinėjama pastatų tipologija, aiškiai atskiriami geležinkelių infrastruktūros pastatai nuo kitų geležinkeliui nepriklausančių objektų, tiksliai apibrėžiamos jų funkcijos. Atliekama geležinkelio objektų harmonizavimo priemonių analizė, atkreipiant dėmesį į proporcijų harmoniją, pastatų eksterjerų simetriją ir asimetriją, jų atskirų dalių architektūrinius santykius, kompozicijos išraiškos priemones, ritmą, statiką ir dinamiką, niuansą ir kontrastą. Analizuojama geležinkelio atkarpa yra pati seniausia Lietuvos teritorijoje. Darbe apimamas laikotarpis nuo jos atsiradimo XIX a. viduryje iki XX a. antros pusės, kai po prasiautusio karo geležinkelyje prasidėjo naujas statybos etapas. Darbe nustatomos dažniausiai ir rečiausiai sutinkamos architektūrinės raiškos priemonės, pastatai turintys išskirtinius bruožus. Apibrėžiamas architektūrinės raiškos priemonių ypatybės bei jų naudojimo priežastingumas. Baigiamojo darbo struktūrą sudaro įvadas, trys pagrindiniai skyriai ir išvados. Darbo pabaigoje pateikiami apibendrinimai ir išvados, naudotos literatūros ir iliustracijų sąrašai. Darbo apimtis – 99 p. teksto be priedų , 105 iliustr., 10 lent... [toliau žr. visą tekstą] / The main objective of the thesis is the analysis of Railway facility buildings architectural expression at the section „Turmantas - Vilnius“ (part of the railway line „St. Petersburg – Warsaw“) and its typology system formation. Buildings composition as well as their disposition is analysed, the main factors behind the composition properties are characterized. What is more, a lot of attention is paid to railway buildings typology system creation. Its main purpose is to discern clearly what buildings really are railway facilities precisely their functions. The work also discusses harmonization tools in architecture, such as symmetry and asymmetry, proportions, rhythm, contrast and nuance, harmony of proportions. Railway section „Turmantas - Vilnius“ is the oldest in Lithuania. The paper coveres time-period between second half of the 19th c. (time of the railway line foundation) and first half of the 20th c. (when new construction stage after World War II has begun). The paper sets out the least and the most frequently found architectural expression (harmoniztion) tools, buildings which have special features. Final structure of the work consists of an introduction, three main sections, generalizations and conclusions as well as literature and illustrations lists. Thesis consist of: 99 p. text without extras, 105 pictures, 10 tables, 5 diagrams, 79 bibliographical entries. 9 appendixes included (in total 56 p., 68 pictures, 13 tables).
2

"Divadlo hudby" - koncertní sál pro město Brno / "Theatre Music" - a concert hall for the city

Krausková, Veronika January 2014 (has links)
The object of this diploma thesis is the concept of architectonic studies of concert hall – theatre music. The main functional scope of the projected building is concert hall with capacity of 542 visitors. Hall enables performances of choir up to 50 members and orchestra up to 80 members. Operative and service room of the concert hall background is one of the parts of handled task. The main accent was put on acoustic solution of the main hall and overall limpidity of the building operation. Building look and its solution is trying to supplement compactness of the urban unit with the respect to the surrounding build-up area.

Page generated in 0.1037 seconds