• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Developing a Generic Resource Allocation Framework for Construction Simulation

Taghaddos, Hosein 11 1900 (has links)
The allocation of resources over time, referred to as resource scheduling, in large-scale construction environments is a challenging problem. Although traditional network scheduling techniques are the most popular scheduling techniques in the construction industry, they are ineffective in modeling the dynamic nature and resource interactions of large projects. Simulation based modeling or optimization techniques are also time-consuming, complicated and costly to be implemented in large-scale projects. This research is focused on developing a new framework to insert artificial intelligence inside construction simulations for facilitating the resource allocation process. The first stage in this study was developing a framework to solve resource scheduling problems in large scale construction projects. This framework, called the Simulation Based Auction Protocol (SBAP), integrates Multi-Agent Resource Allocation (MARA) in a simulation environment. This hybrid framework deploys centralized MARA (i.e., auction protocols) whereby agents bid on different combinations of resources at the start of a simulation cycle. Agents attempt to improve their individual welfare by acquiring a combination of resources. An auctioneer is designed to allocate resources to the agents by maximizing the overall welfare of the society. Simulation is also employed to track the availability of resources, and manage resource oriented activities. This framework is implemented in two large construction applications of scheduling module assembly yard and multiple heavy lift planning in modular construction. The second objective of this project is to develop a generic resource allocation component for addressing optimized resource allocation in various construction projects. This component is developed in a large scale model using High Level Architecture (HLA), instead of traditional simulation environments. HLA allows splitting a large scale model, known as a federation, into a number of manageable components (i.e., federates), while maintaining interoperability between them. A generic Resource Allocation (RA) federate is designed to act as an auctioneer for federates developed based on the SBAP. Another generic federate is also built to automate the communication with the RA federate. These two generic federates can be reused in various construction federations. This framework is successfully implemented in an industrial construction process that involves different supply chains including spool fabrication, module assembly and heavy crane lifts in site construction. / Construction Engineering and Management
2

Developing a Generic Resource Allocation Framework for Construction Simulation

Taghaddos, Hosein Unknown Date
No description available.

Page generated in 0.0497 seconds