• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 4
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Návrh řetězového zásobníku nástrojů / Design of chain tool magazine

Mucha, Roman January 2011 (has links)
The aim of the Master´s thesis is to design a chain tool magazine for a heavy duty machining centre for the non-rotational parts production. The Master’s thesis is ordered by TOS KURIM - OS, a.s. Company. The first part contains the analysis of the solved problems with the overview on the automatic tool changers, and the next part of the thesis deals with the proposal of options. Design of the chosen solution of the chain tool magazine is made in the next step, including sizing of the main parts. The 3D model of the chain tool magazine and drawings are included.
2

Optimization of intermittent aeration for increased nitrogen removal efficiency and improved settling

Fredericks, Dana Kathleen 27 August 2014 (has links)
Nitrogen, when present in excess, can cause eutrophication in waterways, which may result in hypoxia and the desertion or death of aquatic life. As nitrogen continues to pollute our water, wastewater discharge limits are becoming more stringent with effluent limits based on preserving receiving waters. This project took place at the Hampton Roads Sanitation District's, Chesapeake-Elizabeth Wastewater Treatment Plant; a High-Rate Activated Sludge (HRAS) plant with no primary clarifiers operating at an SRT of 1.5" 2 days without biological nitrogen removal (BNR). BNR is considered more cost-effective than comparable chemical and physical processes, but it requires considerable resources to meet increasingly strict discharge limits. As these limits decrease, the resource requirement increases, making them no longer cost-effective. By 2021 HRSD anticipates the plant will be included in a bubble permit, resulting in a total nitrogen (TN) effluent target of approximately 5-8 mg/L. Conventional BNR plants remove carbon and nitrogen simultaneously, which requires both increased volume (capital costs) and aeration energy demand (operating costs). As an alternative, HRSD is pilot testing an A/B process; a two-sludge system comprised of a carbon removal stage followed by a nitrogen removal stage. The very high rate, low dissolved oxygen (DO) A-stage could reduce the organic load, allowing the B-stage to perform BNR within the existing reactor volume and eliminating the need for primary clarifiers. However, improper control of the carbon removal system can lead to carbon and alkalinity deficiencies, which results in poor nitrogen removal. This is mediated by employing a short-cut nitrogen removal technology. A novel aeration strategy based on set-points for reactor ammonia, nitrite and nitrate concentrations with the aim of maintaining equal effluent ammonia and nitrate + nitrite (NOx) concentrations was successfully employed. The goal was to inhibit nitrite-oxidizing bacteria (NOB) so the nitrification process stopped at nitrite. This helps promote an effluent with equal parts ammonia and nitrite, which is amenable to anammox polishing to achieve low effluent nitrogen concentrations. NOB suppression has been successfully applied in sidestream anaerobic digestion waste streams because NOB out-selection is favored in warm, nitrogen-rich conditions. However, the cold, dilute conditions of continuous mainstream processes are not favorable to NOB out-selection. The mechanisms employed to achieve sidestream NOB out-selection are not reasonable for mainstream applications. This study employed operational and process control strategies to aggressively out-select NOB based on optimizing the chemical oxygen demand (COD) input, imposing transient anoxia, aggressive solids retention time (SRT) operation approaching ammonia oxidizing bacteria (AOB) washout, and a dissolved oxygen concentration (DO) of 1.5 mg O2/L during aeration. This pilot-scale study demonstrated that when run aggressively, the proposed online aeration control is able to out-select NOB in mainstream conditions and provide relatively high nitrogen removal without supplemental carbon and alkalinity at a low hydraulic retention time (HRT). Successful full-scale implementation would promote improved water quality that is economically sustainable. The ability of two different process configurations (full intermittent aeration and Modified Ludzak-Ettinger [MLE]) to achieve high nitrite accumulation and nitrogen removal efficiencies in four equal volume tanks in series followed by a cone-bottom clarifier in a pilot scale biological nitrogen removal (BNR) process (V=0.61 m3) was evaluated. All four biological reactors were equipped with a variable speed mixer, a 17.7 cm membrane disc diffuser, and a Hach LDO probe. Aeration capacity in all four tanks allowed the system to be operated with or without a defined anoxic zone. Both processes utilized a novel aeration strategy based on set-points for reactor ammonia, nitrite and nitrate concentrations with the aim of maintaining equal effluent ammonia and NOx concentrations. The B-stage had a variable HRT (2-7 hours) and a variable influent flow rate. When operating in the MLE configuration, an internal mixed liquor recycle (IMLR) line returned nitrified mixed liquor from the last aerobic reactor to the anoxic reactor using a peristaltic pump at a rate between 200-450% of the influent flow. When IMLR was used the first tank was not aerated. RAS from the clarifier was returned to the anoxic zone at 100% of the influent flow. SRT was controlled by wasting solids from the last aerobic tank. The wasting was automated to maintain desired SRT. The nitrite accumulation ratio (NAR), NO2- -N/(NO2- -N+ NO3- -N), was best under full intermittent aeration, achieving 0.43+0.10 at a 3 hour HRT and influent carbon to ammonia ratio (COD/NH4+-N) of 7.9+1.4. As an MLE, the NAR decreased with increasing internal mixed liquor return (IMLR); at IMLR of 200%, 325% and 450%, the NAR was 0.20+0.04, 0.17+0 and 0.14+0.03, respectively. The MLE did, however, improve the overall TIN removal efficiency compared to operation where all reactors were intermittently aerated. The TIN removal efficiency was best under MLE operation, increasing as the IMLR and influent COD/NH4+-N increased. When the IMLR was 200%, 325% and 450%, the TIN removal efficiencies were 76.4+4.0%, 80.2+0% and 86.3+5.0%, respectively, which corresponded to an influent COD/NH4+-N and HRT of 9.2+0.8 and 4 hr, 9.8+0.4 and 6 hr, and 10.3+1.2 and 6 hr, respectively. In addition to process operation, key issues of filamentous bulking were assessed. Concrete solutions to this continual issue are not available as the unique features of each plants influent and process dynamics prohibit the formulation of a universal solution. Filaments observed throughout this study included Type 0041, Type 0675, Type 0803, Nocardia, Thiothrix I and Thiothrix II. Type 0041 and Type 067 were observed throughout the study and are typical of BNR systems; they arguably do not contribute to settling issues. Type 0803 filaments are linked to low F/M, high SRT systems. It was present at the start of the experiment and then no longer detected. Nocardia made a brief appearance on day 72 causing temporary foaming issues. This was fixed by vacuuming the surface of the clarifier daily and may be attributed to the high surface area to volume ratio present in pilot-scale systems. Thiothrix I and Thiothrix II were observed after day 93, however, never as the dominant species. Thiothrix related bulking was observed in the A-stage (Miller et al, 2012), which was attributed to high sulfide and organic acids in the influent raw wastewater during high temperature periods and carryover of sulfide and Thiothrix from the over-sized A-stage clarifier. The goals of this evaluation were to identify favorable parameters of common filaments and establish their impacts on the system. Typically an SVI of 150 mL/g indicates good settling. Overall the study experienced good settling (128.3+36.3 mL/g), indicating that operating under different influent substrate concentrations and process configurations did not result in poor settling. / Master of Science
3

Problematika rychlé automatické výměny nástrojů u obráběcích strojů / Problematic of Fast Automatic Tool Change by Working Machinery

Pavlík, Jan January 2011 (has links)
This dissertation thesis is focused on the problem of the Automatic Tool Change for milling centers, which is recently shown as a very current topic. The content of this work is to conduct a comprehensive research of various types of ATC depending on the type of machine, as well as research of the current tool interface relating closely with these problems. There was made a comprehensive analysis on the basis of data obtained by comprehensive research, from which both the main factors affecting this topic and the area dealed and developed by this work resulted. The most problematic area of machinery used nowdays for the Atomatic Tool Change was detected as manipulator provided the exchange between spindle and tool storage. Kinematic structure and design of individual elements affects very significantly the dynamics of the whole process of exchange of tools. Therefore, the work is focused on problematic of the manipulator. The main results of this thesis are constructional design of several types of manipulators, which were partly realized within the project 1.2.4 of Brno department of RCMT in the form of the testing stands. There was developed simulation models for selected types of manipulators which were verificated by measuring on the real stand. On the basis of abovementioned problem there was identified another key issue related not only to the exchange process but also with complex problem of service life of spindle. It is a grab force in the process of picking tools. The work outlines the possibilities for further research of these forces on the service file of spindle (especially on service life of bering groups of spindle).
4

Comparison of Aeration Strategies for Optimization of Nitrogen Removal in an Adsorption/Bio-oxidation (A/B) Process with an Emphasis on Ammonia vs. NOx (AvN) control

Sadowski, Michael Stuart 08 December 2015 (has links)
Research was performed at a pilot-scale wastewater treatment plant operating an adsorption/bio-oxidation (A/B) process at 20C. The study compared B-Stage performance under DO Control, Ammonia Based Aeration Control (ABAC), and Ammonia vs. NOx (AvN) control. AvN in 1) fully-intermittent and 2) intermittently-aerated MLE configurations was compared to DO Control and ABAC, each with continuous aeration, in an MLE configuration. The study also examined operation of each aeration strategy with two different feed types: A-Stage effluent (ASE) and primary clarifier effluent (PCE). Operating modes were compared on the basis of nitrogen removal performance, COD utilization efficiency for denitrification, and alkalinity consumption. AvN was found to provide comparable nitrogen removal performance to DO Control and ABAC. The highest nitrogen removal performance was seen when operating DO Control (81.4 ± 1.2%) and ABAC (81.1 ± 1.2%) with PCE. High nitrogen removal efficiency (77.5 ± 6.1%) was seen when fully-intermittent AvN operation was fed ASE containing a high particulate COD fraction. A high effluent nitrite accumulation ratio (NAR = NO2-/(NO2-+NO3-)) was seen during this period (46 ± 15%) accompanied by the out-selection of Nitrospira. Feeding effluent from AvN control to an Anammox MBBR improved removal efficiency. Increased soluble COD loading resulted in greater nitrogen removal with strategies operating in an MLE configuration while particulate COD was found to be important for processes where removal was designed to occur in downstream reactors. Efficiency of COD for denitrification was found to vary based on the amount and type of influent COD; however AvN in an MLE configuration was found to use COD more efficiently than fully-intermittent AvN. In either configuration, AvN required less alkalinity addition than DO Control or ABAC. High sCOD concentrations in PCE led to increased nutrient removal as compared to ASE but increased heterotrophic growth and mixed liquor concentrations in the B-Stage making the A-Stage an attractive option for its ability to control the C/N ratio fed to BNR processes. / Master of Science

Page generated in 0.0264 seconds