Spelling suggestions: "subject:"programvara"" "subject:"enprogramvara""
1 |
Workflow from point cloud to BIM / Arbetsflöde från punktmoln till BIMKaliakouda, Alexandra January 2021 (has links)
The title of this thesis is 'Workflow from point cloud to BIM'. Thus, an attempt is made to present and analyse all the steps followed in such a process. The building used as a case study is U-Building which is located at KTH campus. Briefly, a report is made on the various methods of mapping existing buildings. Also, the principles of operation of 3D laser scanners are presented as well as an analysis of BIM technology. Furthermore, it is analysed the process of creating a 3D representation of the building in the form of a point cloud as well as the process of creating the 3D model with the help of two software packages. / Titeln på denna uppsats är 'Arbetsflöde från punktmoln till BIM'. Således görs ett försök att presentera och analysera alla steg som följs i en sådan process. Byggnaden som används som fallstudie är U-Building som ligger på KTH campus. Kortfattat görs en redovisning av de olika metoderna för att kartlägga befintlig bebyggelse. Dessutom presenteras principerna för driften av 3D-laserskannrar samt en analys av BIM-teknik. Vidare analyseras processen att skapa en 3D-representation av byggnaden i form av ett punktmoln samt processen att skapa 3D-modellen med hjälp av två mjukvarupaket.
|
Page generated in 0.0601 seconds