• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 85
  • 20
  • 5
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 134
  • 70
  • 46
  • 43
  • 40
  • 33
  • 27
  • 19
  • 17
  • 16
  • 14
  • 12
  • 12
  • 12
  • 12
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
131

The Development of Education in Bowling Green, Kentucky

Vance, Lula Dickey 01 June 1936 (has links)
In recent years several articles have been written concerning education in Bowling Green, Kentucky, but the writer has been unable to discover an article that has treated the development of education from the time Bowling Green was established until now. It is the motive of this study to trace the development of education from the time Bowling Green was established until the present time. Information for this thesis has been obtained from various sources, but the greater part of it has been secured through personal interviews, unpublished manuscripts, scrapbooks and histories.
132

Sportovní centrum Za Lužánkami Brno / Sport Centre Za Lužánkami Brno

Kociánová, Lenka January 2016 (has links)
Prior to this thesis, there was a specialist course “Sport centre Za Lužánkami Brno”. This project was focused on planning of urbanism-architectural area with a mixture of renovated and new facilities with different functions for sport and leisure, together with professional sport opportunities. The emphasis was on collision-free paths for pedestrians and cyclists, clear transport links around the centre and terrain configuration of the area. The thesis follows on from this project, focusing on development between the hotel Bobycentrum in the South and the Lužánky swimming pool in the North. The idea of the proposal stems from the need to connect the development area to the existing network of pedestrian and cycle paths and the public transport system to minimise the use for individual car travel to the sport centre; and to connect existing and new facilities for leisure and sports. The Sport relax centre was designed with existing buildings in mind and partially follows their ground floor dimensions. The centre creates a barrier from the noisy and busy street and provides a calmer area for outdoor recreation. It fills a gap between the existing buildings and is encircled by a footpath at second level joining to the footbridges over Sportovní Street and the existing terrain in the north-western part. The footpath is ended by passageway between swimming pool and wellness centre. More and more people are looking for sport opportunities in cities however; there are still not enough quality grounds and facilities on offer. The facilities in this development are meant for regular trainings and recreation for the public, including parents with children, groups of friends as well as individual and team sports players, offering a range of day, evening and night activities both indoors and outdoors. Other facilities include outdoor changing rooms and sports equipment rental as well as spaces for meeting friends such as a restaurant, wellness and a dancing-hall.
133

Sportovně relaxační centrum / Sports and wellness center

Libřický, Zdeněk January 2018 (has links)
The final thesis is focused on the design and elaboration of the project documentation of the sports and relaxation center. The proposed building is located in the south-eastern part of the town of Hradec Králové, in a location supposed for buildings and areas of sports and relaxation use. It is a three-storey building with a flat roof and partial basement. The construction system is wall-mounted with a combination of skeleton. The building is based on plain concrete and reinforced concrete foundation footing. The peripheral, supporting and partition walls are designed from ceramic blocks POROTHERM. The inner load-bearing elements consist mainly of reinforced concrete columns. The ceiling structure is designed from reinforced concrete slabs supported locally. The perimeter walls of the first overground floor and part of the perimeter walls of the basement are insulated by an external contact thermal insulation system. The thermal insulation of the perimeter walls of the second floor is designed by means of a ventilated facade with facade tiles except the squash courts and the relaxation area. The building is functionally divided into three main parts, where the central part forms an entrance hall with comunication spaces of all floors. In this part a basement with technical facilities is designed. The right part of the ground floor consists of a restaurant with a bowling alley and a kitchen with storage and hygienic facilities. As part of this section, a gym and exercise rooms for fitness exercises, spinning and TRX are designed on the second floor. The left part consists of two squash courts with the appropriate facilities and massage areas. There is also a relaxing facilities with a north-facing terrace on the second floor. There are also dressing rooms and hygienic facilities. The designed object is accessible for disabled people. There is a parking lot for 40 cars, 3 motorcycles, one bus and three barracks for cars.
134

Sportovní centrum Polička / Sports centre Polička

Svoboda, Jan January 2016 (has links)
This thesis deals with the design and elaboration process of a project documentation of a sports centre. The designed sports centre building is situated in the southern part of the town of Polička, in the area determined for sports and free time activities complexes and areas. It is a two-floor, non-cellar, flat-roof building. It is based on plain concrete strip foundations and reinforced concrete foundation footing. The bearing, peripheral and partition walls are designed from POROTHERM hollow clay blocks. Reinforced concrete columns are designated in open disposition areas. The ceiling construction is made from SPIROLL pre-stressed concrete floor slabs and point-supported reinforced concrete slabs. The peripheral walls of the first aboveground floor are insulated with external thermal insulation system with a protective gabion facade. The peripheral wall thermal insulation in a bowling restaurant and gym halls extension is designed from a ventilated facade with CEMBRIT METRO facade cladding panels. The building is functionally divided into two main parts with a shared entrance. The sports centre with gyms and other sports facilities form the first part. Three squash courts, a mini-football piste, a special room for spinning and alpinning, a room for group exercising and cloakrooms with sanitary facilities are designed within one part of the sports centre. A restaurant with a bowling area and a kitchen with storerooms and other facilities for employees form the second part. The designed complex is barrier-free. There is aimed to be a car park for fifty cars, four motorbikes and a bus in front of the building. Three parking places are for disabled people.

Page generated in 0.0525 seconds