• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Risk analysis and communication for buildings using virtual reality

Terentjevs, Vitalijs 02 September 2020 (has links)
Traditionally risk management is associated with identification, evaluation and prioritization of risks. Nonetheless, communication of the risks to the parties involved is of the utmost importance. By providing more complete and easy to perceive information regarding potential hazard impacts and economic losses, risk analysis output increases risk awareness and helps make risk-informed decisions. At present, in the field of civil engineering three-dimensional (3D) models are almost exclusively used for the design of structures. The presence of 3D and Virtual Reality (VR) technologies in risk analysis is extremely scarce. At the same time, there are potential advantages these technologies can provide to risk analysis and communication: the virtual 3D environment can emulate physical space and relationships between elements of the system, time-dependent simulations of hazard propagation, and awareness of physical dimensions of elements and their interconnection can be integrated. This work is concerned with the way to communicate risks associated with building systems to decision-makers by visualizing them on a 3D model of construction and through simulation in a VR environment. For this purpose, the Almonte Power Plant in Mississippi Mills, Ontario, is analyzed as a case study. It is a small scale hydropower plant that is at risk of flooding, being located close to the Mississippi River. The last large scale flood in this region occurred in April 2019. The novel methodology is applied to the aforementioned case study and further experiments are performed to test the sensitivity of the model to various parameters. The parameters of interest are flow rate and the degree of dependency between elements. Risk scores are obtained and evaluated as a function of flow rates and duration from the onset of flooding. The change in the degree of dependency between various elements of the electrical system allows an illustration of the importance of expert judgement of those dependencies. / Graduate / 2021-05-20
2

BIM i medelstora byggentreprenadföretag : BIM in medium sized building construction companies

Åskregn, Peter January 2015 (has links)
Rapporten har ett fokus på Byggnads Informations Modeller (BIM), ett IT-tekniskt verktyg och arbetssätt som har vuxit fram i byggbranschen alltmer under de senaste åren. Hur detta IT-verktyg används hos medelstora byggentreprenadföretag redovisas i denna rapport.Syftet med rapporten är att verka positivt på utvecklingen mot effektivare och resurssnålare arbetsprocesser inom byggbranschen genom att bidra med kunskap om hur användandet av BIM ser ut bland dessa företag, varför det ser ut som det gör, ifall BIM behövs och vad som kan förändra läget i någon riktning.Metodarbetet har bestått av litteraturstudier och intervjuundersökningar.Arbetet inleddes med studier av rapporter och texter relaterade till BIM och intervjuer med representanter för ledande branschföretag inom bygg samt ett par branschorganisationer med inriktning på BIM. Därefter följde ytterligare litteraturstudier med inriktning på förändring och förändringsarbete och enkät och intervjuteknik. Arbetet ledde fram till olika grundteser och förklaringsmodeller som låg till grund för och utformade de intervjufrågor som ställdes vid huvudintervjuerna med elva medelstora byggentreprenadföretag.Huvudintervjuerna gav ett resultat som visade att företagen generellt sett såg på BIM som något positivt, med fördelar såsom lättare kommunikation och som ett hjälpmedel att minska fel i produktionen. Resultatet visade även att det fanns utmaningar såsom mjukvarukompabilitet och en beroendeproblematik mellan projektets involverade parter som innebar att för att tekniken ska kunna ge fördelar måste alla parter använda tekniken.Förklaringarna till det låga användandet bland medelstora byggentreprenadföretag var flera, vanligast var brist på krav från beställarna. Förklaringarna var också avsaknad av behov, kostsamma investeringar, konkurrerande målsättningar, kompabilitetsproblem med mjukvaror och avsaknad av kunskap om BIM.För att gynna en större användning föreslås att tekniska hinder elimineras genom standardisering och utveckling av arbetssättet och mjukvaran rörande BIM, det föreslås också att konkurrerande målsättningar elimineras genom kunskapsspridning om BIM i branschen, både hos entreprenörerna, -för att främja god utbildning så att personalen vill arbeta med tekniken, och hos beställare, -så att de börjar efterfråga BIM och därigenom ger tekniken konkurrensfördelar. / The report has a focus on Building Information Models (BIM), an IT-technical tool- and workmethod that have emerged increasingly in the construction industry in recent years. How this IT tool is used in medium-sized building construction companies is presented in this report.The purpose of the report is to promote positive development towards more efficient and resource-efficient work processes in the construction industry by providing knowledge on how the use of BIM exists among these companies, why it is the way it is, if BIM is needed and what can change the current status in any direction.The work-method has consisted of literature studies and interview surveys.The work began with studies of reports and texts related to BIM and interviews with representatives of leading construction industry companies and a couple of industry organizations with focus on BIM. This was followed by continued literary studies focused on change and change management, survey and interview techniques. This work led to various basic theories and explanatory models as the basis for and the design of the interview questions asked at the main interviews.The main interviews was conducted with eleven medium-sized building construction companies and gave a result that showed that companies generally looked at BIM as something positive with advantages such as easier communication and as a means to reduce errors in production. The result also brought some light to the fact that there existed challenges like software compatibility and dependency between the parties involved in the project, which means that for the technology to be able to provide wanted benefits all parties involved have to use the workmethod.The reasons for the low usage among medium sized construction contractors was several, the most common was the lack of demands of the clients. The reasons were also the absence of need, costly investments, competing objectives, compatibility issues with software and lack of knowledge of BIM.In order to promote a greater usage of BIM it is proposed that the technical obstacles are eliminated through standardization and development of the processing method and software, it is also proposed that the competing objectives are eliminated by spreading and increasing knowledge of BIM in the industry, both amongst entrepreneurs, -to promote good staff training so that the staff will want to work with the technology, and amongst construction clients, -so that they start asking for BIM and thereby provide the technology with a competitive edge.
3

Dynamiska APD-planer : En fallstudie från inspektionsrundor med 360-graders hjälmkamera

Andersson, Isak January 2023 (has links)
Arbetsdispositionsplanen (APD-plan) är en central metod för planering av byggarbetsplatser och stöd för platsledningens beslutsfattande. Idag är stödet nästan uteslutande manuellt arbete även om det görs med digitala verktyg och uppdatering av APD-planen uteblir.  Denna studie syftar till att undersöka möjligheterna för att automatisera överföringen av information från en 360-graders hjälmkamera på en byggarbetsplats till en digital APD-plan integrerad med byggnadsinformationsmodeller (BIM). Målet med studien är att undersöka hur informationen från en hjälmkamera kan kopplas till digitala verktyg såsom APD-planer och BIM-modeller samt hur denna information kan användas som stöd för platsledningen på byggarbetsplatsen genom kontinuerlig uppdatering av APD-planen.  Studien baseras på en fallstudie som innefattar datainsamling i form av bilder och videor från byggarbetsplatsen, intervjuer med personer med erfarenhet och kunskap inom byggbranschen samt observationer från fältstudie. En litteraturstudie presenteras också, där teori kopplad till examensarbetets syfte och frågeställning används som grund för analys, diskussion och slutsatser.  För att uppnå syftet och målen med studien besvaras följande forskningsfrågor:  Hur uppdateras och används APD-planer i dagsläget inom byggsektorn?  Vilka utmaningar och svårigheter är förknippade med automatiserad överföring av information från hjälmkameror till APD-planer?  Vilka fördelar och nackdelar medför användningen av en 360-graders hjälmkamera som verktyg för automatiserad uppdatering av APD-planer och integrering med BIM-modeller?  Utifrån litteraturstudien och genomförda intervjuer uppdateras APD-planer i nuläget manuellt genom att APD-ansvarig genomför inspektioner ute på arbetsplatsen. Denna metod är tidskrävande och uppdateringar tenderar att utebli på grund av tidsbrist.  Resultatet av fallstudien indikerar att insamlad data från byggarbetsplatsen automatiskt kunde överföras till APD-planen men inspektionen för att samla in data krävde manuellt utförande. APD-planen uppdaterades manuellt genom att jämföra insamlade data från byggarbetsplatsen och sedan uppdatera APD-planen utifrån dessa förändringar.  Utvecklad metod skapar förutsättningar för en smidare och effektiv uppdateringsprocess av APD-planen. APD-ansvarig kan utföra uppdateringar digitalt utan fysisk närvaro på platsen. Med metoden kan APD-planer uppdateras frekvent där senaste information finns tillgänglig i smartphones för samtliga involverade i projektet. Nackdelen med utvecklad metod är att manuell uppdatering krävs där vidare forskning är nödvändig för att automatisera uppdateringen. Formatet av insamlat material medförde att en automatiserad uppdatering uteblev eftersom materialet inte kunde kopplas samman med APD-modellen utan enbart jämföras. Om formatet av insamlat material skulle kunna omvandlas till modeller eller placeras ovanpå befintliga modeller skulle en automatiserad uppdatering av APD-planen vara genomförbar. / The Construction Site Utilization Plan (CSUP) is a central method for planning construction sites and support for site management's decision-making. Today, the support is almost exclusively manual work, even if it is done with digital tools, updating the CSUP tends to be absent.  This study aims to investigate the possibilities of automating the transfer of information from a 360-degree helmet camera on a construction site to a digital CSUP model integrated with building information models (BIM). The goal of the study is to investigate how the information from a helmet camera can be connected to digital tools such as CSUP and BIM models and how this information can be used to support site management on the construction site through continuous updating of the CSUP.  The study is based on a case study that includes data collection in the form of images and videos from the construction site, interviews with people with experience and knowledge in the construction industry, and observations from field studies. A literature study is presented as well, where theory linked to the aim and question of the thesis is used as a basis for analysis, discussion and conclusions.  In order to achieve the aim and objectives of the study, the following research questions are answered:  How are CSUPs currently updated and used in the construction sector?  What are the challenges and difficulties associated with automated transmission of information from helmet cameras to CSUPs? What are the advantages and disadvantages of using a 360-degree helmet camera as a tool for automated updating of CSUPs and integration with BIM models?  Based on the literature study and conducted interviews, CSUPs are currently updated manually by the CSUP manager carrying out inspections at the construction site. This method is time consuming and updates tend to fail due to lack of time.  The results of the case study indicate that data collected from the construction site could be automatically transferred to the CSUP but the inspection to collect the data required manual execution. The CSUP was manually updated by comparing collected data from the construction site and then updating the CSUP based on these changes.  The developed method creates the conditions for a smoother and more efficient updating process of the CSUP. CSUP managers can carry out updates digitally without physical presence on site. With the method, CSUPs can be updated frequently where the latest information is available on smartphones for everyone involved in the project. The disadvantage of the developed method is that manual updating is required where further research is necessary to automate the updating. The format of collected material meant that an automated update was not possible because the material could not be connected to the CSUP model but only compared. If the format of collected material could be converted into models or placed on top of existing models, automated updating of the CSUP would be feasible.

Page generated in 0.1356 seconds