• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Interoperability Study of the European and Chinese Railway Signalling Systems : Case study in Ethiopia / Interoperabilitetsstudie av de europeiska och kinesiska järnvägssignalsystemen : Fallstudie i Etiopien

Tana, Kebron Temedo January 2021 (has links)
The railway industry in Ethiopia has been an important way of communication and transportation for a long time. It is a developing sector with many national plans for future investments. However, the current major corridors of Ethio­-Djibouti and Awash­-Weldiya have interoperability issues due to two different signalling systems being used. Thus, this study was undertaken with the objectives of assessing technical interoperability of the Chinese signalling system (CTCS) and the European signalling system (ETCS), identifying a possible technical solution regarding the interoperability issues, and assessing the economic benefits of a harmonized system. Compatibility of the two signalling systems was analyzed particularly with respect tothe technical configurations by thoroughly investigating each system’s features and making interviews and having discussions with professionals who worked with the two systems. In addition, a life cycle cost analysis of the Ethio­Djibouti signalling system was done with data obtained from Ethiopian Railway Corporation and compared with average life cycle costs of ETCS level 1. After analyzing each system, two possible technical solutions were found to achieve interoperability between the two systems used in Ethiopia currently. The first technical solution is upgrading Ethio­Djiboutirailway line from the current CTCS level 0 to CTCS level 2 to be compatible with the new Awash­Weldiya line which will use ETCS level 1. The second technical solution to make the two systems interoperable is to install ERTMS as an overlay on the existing CTCS level 0 as ERTMS is designed as an overlay system that could be installed on top of an existing national infrastructure and vehicles. However, these technical solutions have to be tested in laboratory and onsite with respect to their practical and economical feasibility. / Järnvägsindustrin i Etiopien har länge varit viktig för kommunikation och transport. Det är en sektor under utveckling med många nationella planer för framtida investeringar. De nuvarande korridorerna i Ethio­Djibouti och Awash­Weldiya har emellertid interoperabilitetsproblem på grund av två olika signalsystem. Detta examensarbete har analyserat kompatibiliteten för de två signalsystemen särskilt med avseende på de tekniska konfigurationerna genom att noggrant undersöka varje systems funktioner och genom intervjuer och diskussioner med yrkesverksamma somhar arbetat med de två systemen. Dessutom genomfördes en livscykelkostnadsanalys av Ethio­Djibouti signalssystemet med den data som erhölls från Ethiopian Railway Corporation. Efter analys av varje system hittades två möjliga tekniska lösningar för att uppnå interoperabilitet mellan de två systemen som används i Etiopien för närvarande. Den första tekniska lösningen är att uppgradera Ethio­Djiboutis järnvägslinje från nuvarande CTCS nivå 0 till CTCS nivå 2 för att vara kompatibel med den nya Awash­Weldiya­linjen som kommer att använda ETCS nivå 1. Den andra tekniska lösningen för att göra de två systemen interoperabla är att installera ERTMS som ett överlägg på det befintliga CTCS­0 signalsystemet, eftersom ERTMS är utformat som ett överläggssystem som kan installeras ovanpå en befintlig nationell infrastruktur. Dessa tekniska lösningar måste dock testas i laboratorium och i fält med avseende på deras praktiska och ekonomiska genomförbarhet.

Page generated in 0.0956 seconds