Spelling suggestions: "subject:"4cluster atemsystem"" "subject:"4cluster systsystem""
1 |
Globular Cluster Kinematics and Dark Matter Content of the Isolated Elliptical NGC 720SCHEMBRI, AMANDA M 03 February 2011 (has links)
We examine the globular cluster system (GCS) of the isolated elliptical NGC 720 using the Gemini Multi-Object Spectrograph (GMOS) and have obtained spectra for 241 candidate globular clusters (GCs) extending to a galactocentric radius of 40 kpc. Of the 241 candidates, 120 are confirmed GCs, where 46 are members of the metal-poor, blue, population and 74 are members of the metal-rich, red, population. A (g-i)=0.50 colour split is used to identify the blue and red populations. We measure the full GCS to have a rotational velocity (Vrot) of 50 +/- 7 km/s with a position angle (PA) of 170 +/- 69 degrees. The red population has a Vrot = 97 +/- 14 km/s with PA = 147 +\- 18 degrees and the blue population has a Vrot = 79 +/- 7 km/s with PA = 89 +/- 18 degrees. The full GCS has an average velocity dispersion of 168 +/- 22 km/s, for
the red population is 156 +/- 30 km/s and for the blue population is 181 +/- 33 km/s.
The velocity dispersion pro file for all populations is constant with increasing radius, suggesting the presence of a dark matter halo. Using a tracer mass estimator, we have measured the mass out to 40 kpc as 1.8(+0.6/-0.1)x10^12 Msun for a potential which traces the dark matter pro file. We also estimate the M/L_V = 30 - 70. This study
extends our survey of GCSs to isolated environments. / Thesis (Master, Physics, Engineering Physics and Astronomy) -- Queen's University, 2011-01-31 11:30:54.389
|
2 |
The Design of Fault Tolerance of Cluster Computing PlatformLiao, Yu-tien 29 August 2012 (has links)
If nodes got failed in a distributed application service, it will not only pay more cost to handle with these results missing, but also make scheduler cause additional loadings. For whole results don¡¦t recalculated cause by fault occurs, it will be recalculated data of fault nodes in backup machines. Therefore, this paper uses three methods: N + N nodes, N + 1 nodes, and N + 1 nodes with probability to experiment and analyze their pros and cons, the third way gives jobs weight before assigning them, and converts weight into probability and nice value(defined by SLURM[1]) to influence scheduler¡¦s decision of jobs¡¦ order. When fault occurs, calculating in normal nodes¡¦ results will back to control node, and then the fault node¡¦s jobs are going to be reassigned or not be reassigned to backup machine for getting complete results. Finally, we will analyze these three ways good and bad.
|
3 |
Communication, Collaboration and Coordination during humanitarian relief effortsIvanov, Krasimir January 2015 (has links)
This thesis will investigate the Communication, Collaboration and Coordination among hu-manitarian organization with the application of Information and Communication Technol-ogy, and commercial paradigms. Aims to involve the relief actors and the commercial com-panies involved throughout of their Corporate Social Responsibility programs. The method-ology is chosen specifically to fit the qualitative nature of the research. The paper presents data collected for the sole purpose of this research and is later on analysed in order to draw theoretical conclusions. At the end, practical implications and suggestions for future research are included.
|
4 |
Communication and memory management in networked storage systemsWu, Jiesheng 12 October 2004 (has links)
No description available.
|
Page generated in 0.0436 seconds