Spelling suggestions: "subject:"compact fluorescent lamp"" "subject:"kompact fluorescent lamp""
1 |
Srovnání klasických žárovek a současných světelných zdrojů z hlediska vzájemných náhrad / Comparison of conventional light bulbs and contemporary light sources in terms of mutual exchangeKočí, Martin January 2012 (has links)
Term project on comparison of conventional light bulbs and light sources present in terms of mutual compensation marks dissertation, which will pay the same issue. The main pillar of the thesis will be a practical measure, whose structure is indicated below. Semester project constitutes a theoretical basis for a thesis and provides an overall introduction to the issue of compensation light sources. Emphasis is placed on the differences between the light source and the real problems may be encountered by consumers during the transition to another type of light bulbs, respectively. fluorescent lamps. Because consumers often replace the original lamps with compact fluorescent lamps, semester project pays attention to just the differences between ordinary incandescent and energy-saving fluorescent lamps.
|
2 |
Improvements to longitudinal clean development mechanism sampling designs for lighting retrofit projectsCarstens, Herman January 2014 (has links)
An improved model for reducing the cost of long-term monitoring in Clean Development Mechanism
(CDM) lighting retrofit projects is proposed. Cost-effective longitudinal sampling designs use the
minimum number of meters required to report yearly savings at the 90% confidence and 10% relative
precision level for duration of the project (up to 10 years) as stipulated by the CDM. Improvements
to the existing model include a new non-linear Compact Fluorescent Lamp population decay model
based on the results of the Polish Efficient Lighting Project, and a cumulative sampling function
modified to weight samples exponentially by recency. An economic model altering the cost function
to a nett present value calculation is also incorporated.
The search space for such sampling models are investigated and found to be discontinuous and
stepped, requiring a heuristic for optimisation; in this case the Genetic Algorithm was used. Assuming
an exponential smoothing rate of 0.25, an inflation rate of 6.44%, and an interest rate of 10%,
results show that sampling should be more evenly distributed over the study duration than is currently
considered optimal, and that the proposed improvements in model accuracy increase expected project
costs in nett present value terms by approximately 20%. A sensitivity analysis reveals that the expected
project cost is most sensitive to the reporting precision level, coefficient of variance, and reporting / Dissertation (MEng)--University of Pretoria, 2014. / gm2014 / Electrical, Electronic and Computer Engineering / Unrestricted
|
Page generated in 0.1115 seconds