• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 2
  • Tagged with
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Front End Planning In The Modern Construction Industry

January 2012 (has links)
abstract: Front end planning (FEP) is an essential and valuable process that helps identify risks early in the capital project planning phases. With effective FEP, risks can potentially be mitigated through development of detailed scope definition and subsequent efficient project resource use. The thesis describes the FEP process that has been developed over the past twenty years by the Construction Industry Institute (CII). Specifically, it details the FEP tools developed for early project planning and the data gathered to analyze the tools used within the CII community. Data from a March 2011 survey are given showing the tools commonly used, how those tools are used and the common barriers faced that prohibit successful FEP implementation. The findings from in-depth interviews are also shared in the thesis. The interviews were used to gather detail responses from organizations on the implementation of their FEP processes. In total, out of the 116 CII organizations, 59 completed the survey and over 75 percent of the respondents used at least one CII tool in their front end planning processes. Of the 59 survey respondents, 12 organizations participated in the in-depth interviews. The thesis concludes that CII organizations continue to find value in CII FEP tools due to the increase tool usage. Also the thesis concludes that organizations must have strong management commitment, smart succession planning and a standardized planning process to increase the likelihood of successful FEP strategies. / Dissertation/Thesis / M.S. Construction 2012
2

Safety Benchmarking of Industrial Construction Projects Based on Zero Accidents Techniques

Rogers, Jennifer Kathleen 26 June 2012 (has links)
Safety is a continually significant issue in the construction industry. The Occupation Safety and Health Administration as well as individual construction companies are constantly working on verifying that their selected safety plans have a positive effect on reduction of workplace injuries. Worker safety is a large concern for both the workers and employers in construction and the government also attempts to impose effective regulations concerning minimum safety requirements. There are many different methods for creating and implementing a safety plan, most notably the Construction Industry Institute's (CII) Zero Accidents Techniques (ZAT). This study will attempt to identify a relationship between the level of ZAT implementation and safety performance on industrial construction projects. This research also proposes that focusing efforts on certain ZAT elements over others will show different safety performance results. There are three findings in this study that can be used to assist safety professionals in designing efficient construction safety plans. The first is a significant log-log relationship that is identified between the DEA efficiency scores and Recordable Incident Rate (RIR). There is also a significant difference in safety performance found between the Light Industrial and Heavy Industrial sectors. Lastly, regression is used to show that the pre-construction and worker selection ZAT components can predict a better safety performance. / Master of Science
3

Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv / Feasibility studies of commercial real estates : An analysis of the pre-project planning phase in Swedish construction companies

Rashidi, Ehsan January 2009 (has links)
<p>This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit.</p><p> </p><p>The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes.</p><p> </p><p>The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process. The importance of testing the profitability of the idea is also being discussed. The interviews also indicated that the pre-project phase is not linear but rather transactional and that the original alternatives presented to the client lead to new client desires and requirements.</p>
4

Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv / Feasibility studies of commercial real estates : An analysis of the pre-project planning phase in Swedish construction companies

Rashidi, Ehsan January 2009 (has links)
This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit.   The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes.   The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process. The importance of testing the profitability of the idea is also being discussed. The interviews also indicated that the pre-project phase is not linear but rather transactional and that the original alternatives presented to the client lead to new client desires and requirements.

Page generated in 0.102 seconds