Spelling suggestions: "subject:"civil engineering anda architecture"" "subject:"civil engineering ando architecture""
1 |
Skiftesstrukturen i Dalarna : Från storskifte till om arronderingLindahl, Marcus January 2009 (has links)
<p>The change of the Real property index map has met a lot of resistance in Dalarna.This is the reason that the parcel’s reform has not had the same impact in Dalarnaas in the rest of Sweden. In addition, even “Laga skifte” (the reformation on propertystructure) was never effected in most areas of Dalarna. This has lead to thatDalarna has a unique property structure with many small and narrow parcels.Some argue, however, that the property structure has been the same for many centuries.The purpose of this thesis is therefore to study how the property structurelooked before “storskifte” (the reformation on property structure) was done, howit was when äganderättsutredningen (the adjudication), in the 1970s, was accomplished,and finally how the structure looks when land consolidation has been implemented.For the template of the studies, seven different villages were chosen.The basis for the study was comprised of acts for each stage and each village.The study showed that change in property structure has occurred. When “storskiftet”was effected a very intensive and illegal dividing of the property landstarted (called sämjedelning). This led to the result that at the time for ”äganderättsutredning”the parcels had become much finer and significantly smaller. Whenland consolidation was accomplished, the parcels once again become fewer andlarger.</p> / <p>I Dalarna har motståndet mot förändringar i fastighetsindelningen varit mycketstort. Det har lett till att de skiftesreformer som genomförts i övriga delar av Sverigeinte fått samma genomslagskraft i Dalarna. Dessutom har inte ens lagaskiftetgenomförts på många platser i Dalarna. Det har resulterat i en för Dalarna unikfastighetsstruktur med många små och smala skiften.Vissa hävdar dock att fastighetsstrukturen sett likadan ut i många hundra år. Syftetmed detta examensarbete är därför att studera hur fastighetsstrukturen sett ut vidolika tidsepoker, storskiftet, äganderättsutredningen på 1970-talet samt när omarronderinggenomförts. För studien har därför sju olika byar i Dalarna valts ut. Underlagettill studien har utgjorts av akterna för respektive skede och by.Resultatet av studien visar på att en förändring av fastighetsstrukturen skett. Närstorskiftet genomförts påbörjades en ibland intensiv sämjedelning vilket innebaratt fastigheterna delades utan att gällande regelverk angående jorddelning följdes.Resultatet av sämjedelningen blev att vid äganderättsutredningen hade fastighetsstrukturenblivit betydligt mer finmaskig, och det enskilda skiftets storlek blivitavsevärt mindre. När omarronderingen sedan genomförs blir skiftena återigenfärre och större.</p> / QC 20101004
|
2 |
Inneklimatundersökning : Hur fungerar ventilationssystemen i två större lokaler och hur ser kommunikationen kring detta ut mellan hyresgäster, hyresvärd och projektör?Nordin, Eva January 2010 (has links)
<p>This examination paper is a study of the indoor climate in a theatre and a practice room for orchestras placed in Sickla in Stockholm. The designer of the ventilation system wondered if he had managed too make a good environment for the users and he also wondered which of the rooms that had the most desirable climate. The project includes polls for visitors, interviews of people connected to the rooms and measurements of the physical environment. The results show a small dissatisfaction about the thermal indoor climate, it’s a little bit to cold and the air draws. However it’s a good and likeable climate, the problem that is mentioned, is as it says only a small dissatisfaction. Actually the dissatisfaction only shows in the polls and in some of the interviews, in the measurements the climate seems very good. The people who work at the place seem to have adequate knowledge for their tasks but in some case the communication between theme and the users have more to wish for.</p>
|
3 |
Planering av området kartberget / Planning of the area KartbergetÅhmark, Tony January 2009 (has links)
No description available.
|
4 |
Railway bridge response to passing trains : Measurements and FE model updatingWiberg, Johan January 2009 (has links)
Today’s railway bridges are analysed in more detail for moving loads due to the increase in speeds and axle loads. However, these numerical analyses are very time consuming as they often involve many simulations using different train configurations passing at different speeds and many considerations to take into account. Thus, simplified bridge, track and train models are often chosen for practical and time efficient simulations. The New Årsta Railway Bridge in Stockholm was successfully instrumented during construction. A simplified 3D Bernoulli-Euler beam element FE model of the bridge was prepared. The FE model was first manually tuned based on static load testing. The most extensive work was performed in a statistical identification of significantly influencing modelling parameters. Consequently, parameters to be included in an optimised FE model updating, with consideration also to synergy effects, could be identified. The amount of parameters included in the optimisation was in this way kept at an optimally low level. For verification, measurements from several static and dynamic field tests with a fully loaded macadam train and Swedish Rc6 locomotives were used. The implemented algorithms were shown to operate efficiently and the accuracy in static and dynamic load effect predictions was shown to be considerably improved. It was concluded that the complex bridge can be simplified by means of beam theory and an equivalent modulus of elasticity, and still produce reliable results for simplified global analyses. The typical value of an equivalent modulus of elasticity was in this case approximately 25% larger than the specified mean value for the concrete grade in question. The optimised FE model was used in moving load simulations with high speed train loads according to the design codes. Typically, the calculated vertical acceleration of the bridge deck was much lower than the specified allowable code value. This indicates that multispan continuous concrete bridges are not so sensitive to train induced vibrations and therefore may be suitable for high speed train traffic. Finally, the relevant area of introducing the proposed FE model updating procedure in the early bridge design phase is outlined. / QC 20100818
|
5 |
Estimation of the Elastic Moduli of Porous Materials using Analytical Methods, Numerical Methods, and Image AnalysisEkneligoda, Thushan Chandrasiri January 2007 (has links)
The effective bulk modulus and effective shear modulus of porous materials having various types of pore shapes are investigated, using both analytical and numerical methods. These solutions, and the scaling laws that are derived with the aid of these solutions, are then used to make predictions of the effective elastic moduli of some sandstones and ceramics, based on two-dimensional images of the pore space. The complex variable method is used to find the hydrostatic and shear compliances of a large family of pores that have N-fold rotational symmetry, and which have at most four terms in their conformal mapping function. This solution is validated using boundary element (BEM) calculations, and is also used to test two scaling laws that estimate the compliances based on the area and perimeter of the pore. The boundary perturbation method is used to study the effect of small-scale roughness on the compressibility and shear compliance of a nominally circular pore. The solution is carried out to fourth order in the roughness parameter for the case of hydrostatic loading, and to second order for shear loading. These solutions allow one to judge the scale of roughness that can safely be ignored when obtaining images of the pores. Predictions are then made of the elastic moduli of some porous materials – two sandstones and a ceramic. Starting with scanning electron micrographs, image analysis software is used to isolate and extract each pore from the host material. The bulk and shear compliances are estimated using both BEM and the two scaling laws. Areally-weighted mean values of these compliances are calculated for each material, and the differential effective medium scheme is used to obtain expressions for the moduli as functions of porosity. These predictions agree well with the experimental values found in the literature. / QC 20100706
|
6 |
Valuation and Performance Reporting in Property Companies Accouding to IFRSNordlund, Bo January 2008 (has links)
Applying a historical cost accounting (HCA) concept in property companies led on many occasions to a situation where everyone knew that the figures in balance sheets and income statements were wrong from a market perspective, but the analysts knew how the figures had arisen. Applying a fair value accounting (FVA) concept has led to a situation, on many occasions, where almost everyone believes that the figures in balance sheets and income statements accurately and fairly reflect reality, whereas few have sufficient knowledge how these figures have arisen.Appraisal of property is a complex issue. One of the most important conclusions from the research reported in this thesis is that disclosure regarding applied methods, significant assumptions in property valuations and statements about the connections between appraised values and market evidence needs refinement in financial reports, according to International Financial Reporting Standards (IFRS). As the uncertainty in property valuations cannot be removed, it has to be managed. Providing explicit disclosure about valuations is one important way to manage this issue by reducing the gap of information asymmetry between those who perform valuations and those who are users of financial statements.Other findings reported are connected to issues of consistent application of IFRS other than disclosures about valuations. Such an issue is the border between maintenance expenses and capitalised costs regarding component replacements. On many occasions companies seem to interpret IFRS accounting rules differently in this respect. This could lead to distorted reporting of net operating income (NOI) levels.Another conclusion reported is that NOI for financial reporting purposes are not equivalent to NOI used for real-estate appraisal purposes. In this thesis it has been shown that differences may turn up regarding rental income and maintenance costs in this respect.Fair value adjustments in income statements are another issue handled in this thesis. Empirical studies showed that a majority of the property companies studied reported such adjustments above financial items in the income statement, which seems to be in line with the intentions of the IFRS rules. / QC 20100831
|
7 |
Planering av området kartberget / Planning of the area KartbergetÅhmark, Tony January 2009 (has links)
No description available.
|
8 |
DIGITAL VISUALISERINGSTEKNIK : möjligheter, för- och nackdelarHaag, Joacim January 2009 (has links)
Ever since the development of the pc and their software, in the early 80´s,architects way of work have changed a lot. Nowadays most of the architectspresent all their works digitally and not with hand drawn material, as they didbefore the pc boom.Digital visualisation technique pushes the limits, when it is about presentingarchitecture projects virtual reality.This report studies how digital visualization technique is used among thearchitects today.Together with architects from ABAKO architect firm in Gothenburg, Sweden,interviews has been made to give answers about what they think about digitalvisualization technique. What are the opportunities, advantages- anddisadvantage with this digital technique?The answers from the architects, together with work that has been done withdigital visualization technique in a project called Project Sofiedal, shows thatthis technique has big opportunities when it comes to create nice looking VRpresentations. The result in this report also shows that this digital technique ismore time demanding compared to hand drawn presentations.The investigation shows that digital visualization technique is a goodcompliment when it is about showing the citizens how future projects willaffect the surrounding. Small projects, not for public interest, the digitalvisualization technique could be questioned as a method of work, but notexluded. / Digital visualiseringsteknik, modellering, rendering, visualisering.
|
9 |
Modern mät- och övervakningsmetodik för bedömning av befintliga broarAndersson, Andreas, Carlsson, Fredrik, Enckell, Merit, Enochsson, Ola, Karoumi (Redaktör), Raid, Malm, Richard, Plos, Mario, Sundquist, Håkan, Täljsten, Björn, Wiberg, Johan, Ülker, Mahir January 2007 (has links)
<p>QC 20110809</p>
|
10 |
Inneklimatundersökning : Hur fungerar ventilationssystemen i två större lokaler och hur ser kommunikationen kring detta ut mellan hyresgäster, hyresvärd och projektör?Nordin, Eva January 2010 (has links)
This examination paper is a study of the indoor climate in a theatre and a practice room for orchestras placed in Sickla in Stockholm. The designer of the ventilation system wondered if he had managed too make a good environment for the users and he also wondered which of the rooms that had the most desirable climate. The project includes polls for visitors, interviews of people connected to the rooms and measurements of the physical environment. The results show a small dissatisfaction about the thermal indoor climate, it’s a little bit to cold and the air draws. However it’s a good and likeable climate, the problem that is mentioned, is as it says only a small dissatisfaction. Actually the dissatisfaction only shows in the polls and in some of the interviews, in the measurements the climate seems very good. The people who work at the place seem to have adequate knowledge for their tasks but in some case the communication between theme and the users have more to wish for.
|
Page generated in 0.2236 seconds