Spelling suggestions: "subject:"5construction industry -- managemement."" "subject:"5construction industry -- managementment.""
71 |
The construction industry in Mexico : its characteristics and problems.Maldonado López Lira, Gonzalo January 1976 (has links)
Thesis. 1976. M.S.--Massachusetts Institute of Technology. Dept. of Civil Engineering. / Microfiche copy available in Archives and Engineering. / Bibliography: leaves 205-210. / M.S.
|
72 |
Coordinating construction projects : modern organization theory applied to project management.Andreotti, Lamberto January 1977 (has links)
Thesis. 1977. M.S.--Massachusetts Institute of Technology. Dept. of Civil Engineering. / MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING. / Bibliography : leaves 82-83. / M.S.
|
73 |
Design-Build Interoperability and Conceptual Design and Development of a Design-Build Management Control SystemMcClain, Lewis Robert 10 April 2007 (has links)
The design-build construction industry has recognized the advantages of a collaborative contracting method; however it has yet to create information systems that can truly support the industry. Many software applications have been created to assist the Design-Builder; however no software provider has created an application that can completely manage the design-build process from beginning to end. Although some software providers have attempted to integrate data between various project management activity modules (estimating, scheduling, accounting, etc), no software provider has resolved the need to integrate data between both project management activity modules and the various phases of the design-build life cycle. The advancements of the design-build industry method of contracting will never be fully achieved until an information system is designed to specifically support the industry. This paper details the conceptual development of a management control system designed to not only integrate data among various project management activities modules but also to integrate data between all phases of the design-build project life cycle.
|
74 |
A cost-based model for optimising the construction logisticsschedulesFang, Yuan, 方媛 January 2011 (has links)
published_or_final_version / Civil Engineering / Doctoral / Doctor of Philosophy
|
75 |
Development of a performance measurement system for the delivery of pharmaceutical capital facility projectsHwang, Bon Gang 28 August 2008 (has links)
Not available / text
|
76 |
Exploratory study of lean construction : assessment of lean implementationKim, Daeyoung 11 May 2011 (has links)
Not available / text
|
77 |
The effectiveness & efficiency of legislative control on the management of private sector property in Hong KongWong, Hung-choi., 黃雄才. January 1997 (has links)
published_or_final_version / Housing Management / Master / Master of Housing Management
|
78 |
A fuzzy genetic algorithms (GAs) model for time-cost optimization in constructionZheng, Xinmin., 鄭新敏. January 2003 (has links)
published_or_final_version / abstract / toc / Civil Engineering / Master / Master of Philosophy
|
79 |
The effective use of partnering for empowerment in the construction industry.Mbatha, Qinisani Nhlanhla. January 2004 (has links)
Abstract not available. / Thesis (M.Com.)-University of Natal, 2004.
|
80 |
Web hosted management of projects in architecture, engineering and constructionSchwarzüller, Gerhard 05 1900 (has links)
No description available.
|
Page generated in 0.1475 seconds