• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 28
  • 2
  • 2
  • 1
  • Tagged with
  • 34
  • 34
  • 24
  • 24
  • 24
  • 23
  • 23
  • 22
  • 22
  • 21
  • 20
  • 20
  • 19
  • 16
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Příprava a realizace Protonového terapeutického centra v Praze / Implementation of Proton Therapy Center in Prague

Halanič, Daniel January 2019 (has links)
The diploma thesis deals with the construction technological project of carcass SO – 001 Proton Therapy Center. The thesis is focused on part B (gantry) of hospital building Proton Therapy Center in Bulovka Hospital area in Prague. The thesis is being processed vertical and horizontal massive monolithic reinforced concrete skeleton realization. The thesis is report, budget, time schedule, technological specification, design of site equipment, design of machinery, design of road construction and next text and drawing documentation processed by assignment of diploma thesis.
12

Stavebně technologický projekt přípravy a realizace administrativní budovy firmy TREFAL, spol. s r.o. / Construction project for Implementation of Administrative Building of TREFAL, spol. s r.o.

Bočková, Andrea January 2020 (has links)
The aim of this thesis is the development project of the firm TREFAL, Spol. s.r.o. The object SOO2 - Administrative building - that is a constituent of the area of TREFAL, Spol. s.r.o. is discussed topic of this thesis. The main focus is the construction development of the monolithic supporting construction objects. The thesis further depicts and investigates accompanying and overall technical report, an implementation study of the main technological stages, situational designs, a solution of the broader traffic relations including a proposal for the supplementation of the construction development, BOZP plan, budget and timeline, a proposal for the new local communication and following textual and design documentation according to the thesis assignments.
13

Stavebně technologický projekt přípravy a realizace autobusového terminálu v Benešově / Construction Project for Implementation of Bus Terminal in Benešov

Hájek, Tomáš January 2020 (has links)
The subject of this diploma thesis is construction project for implementation of bus terminal in Benešov. This thesis contains technical report, construction study of main technological stages, supply management for selected technological processes, technical report of site facilities including drawings, construction machinery and equipment for selected technological processes, technological specification for execution of earthworks SO01 & SO02, technological specification for execution of foundations SO01 & SO02, control and test plan for execution of earthworks, control and test plan for execution of foundations, safety and health protection plan for selected technological processes, construction site noise study and a construction study of reconstruction of roads in the terminal area.
14

Budova vysokoregálového skladu SPO - vybrané části STP / High-rack storage area SPO - selected parts of CTP

Juřica, Karel January 2012 (has links)
Master thesis high-rack storage area spo - selected parts of ctp covers technological studies throughout the building, the construction division, building and engineering structures, preparation of normal technology, mechanical engineering time and financial plan. Also master thesis focuses more on building a major object of the building, which is the storage, dispatch and administrative part of high-rack storage area spo. Building on this subject is further developed such documentation and other documents that complement and prescribe requirements for faster, easier, safer, better and technologically accurate realization of this phase.
15

Vybrané části stavebně technologického projektu realizace obloukového mostu / Selected Parts of the Construction Technology Project of Realization Arch Bridge

Gurgul, Roman January 2013 (has links)
Diploma thesis deals with constructive technological preparation of bridge structure SO-201. This 86m long bridge is located in a non-built-up area of the city of Nitra in Slovakia. Bridge structure is part of project Highway R1 Nitra, západ - Selenec. Bridge is formed by a self-anchored arch structure with intervening bridge deck.The bridge superstructure is formed by steel arches filled with concrete ,steel girders and beams locked with a reinforced concrete slab.
16

Základní škola speciální a Praktická škola při dětském domově Zlín - stavebně technologický projekt / Special basic school and Practical school with orphanage in Zlin - structural technological project

Hrdlička, Michal January 2013 (has links)
This diploma thesis deals selected parts of a structural technological project for new building Basic school and Practical school with orphanage in Zlín. It contains studies of main technological steps, chronological plan, calculation, project of site equipment, technological prescription for concrete roof, suggestion construction machinery and another selected parts. This new brick building includes 3 floors with basement and is located in a separate educational area. Basic monolithic concrete constructions with steels are realizated as a surface structures.
17

Stavebně technologický projekt polyfunkčního bytového domu / Construction technological project of polyfunktion house with block of flats

Hromník, Lukáš January 2014 (has links)
Construction technological project of polyfunctional flat house SO 107, solves the realization of reinforced concrete monolithic ceiling construction the financial and time schedule, technological instruction of concreting, proposal of mechanization, the technical report of technology construction project. The proposal formwork system Multiflex.
18

Stavebně technologické řešení překladiště v Prostějově / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING

Dvořák, Jan January 2014 (has links)
Master thesis and building technology solutions transshipment point in Prostejov covers technological studies throughout the construction, distribution structures on buildings, machinery equipment, time and financial plan. Furthermore, the thesis further focuses on one main structures of the whole building, object transshipment point. On this construction project is further developed such documentation and other documents that complement and prescribe requirements for faster, easier, safer, better and more technologically correct implementation of this phase.
19

Stavebně technologické řešení bytového domu na ulici Kamenná / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING

Girard de Villars, Petr January 2014 (has links)
Master´s thesis deals with constructive-technological project of apartment house in Kamenná street in Brno-Štýřice. The aim of this work is the solution with the view to the financial, time, technical and technological requierements. The thesis includes technical report of constructive-technological project, technological instructions with inspectional and test plans, machinery configuration, safety plan, construction impact on enviroment, technical report of construction site with plans. The part of the thesis is also schedule of the construction, budget, time and financial plan of the construction.
20

Centrum výzkumných institutů a doktorských studií v Brně - příprava a organizace výstavby / The Centre Research Institutes and Doctoral Studies in Brno – Project Planning and Management

Hejna, Vladimír January 2014 (has links)
The technological project deals with processing of materials and documentation for the preparation and realization of the new building Center research institutes and doctoral studies in Brno Poříčí. The project includes technical report which closely provides basic information about the building and used technologies. Due to complicated underlying conditions the project is focused on usage of bracing of foundation pits. The project contains also control and test plans including graphical attachments.

Page generated in 0.1083 seconds