Spelling suggestions: "subject:"5construction machinery"" "subject:"constructuction machinery""
31 |
Omega Sport Olomouc - centrum sportu a zdraví, stavebně technologická příprava stavby. / Omega Sport Olomouc - Sport and Health Center, civil technological project.Bartoněk, Vratislav January 2014 (has links)
The master's thesis is elaborated on the basis of the project of the Sport and Health Center Olomouc. The project consists of two main buildings – the object of NH Hotel and the Sports Center Omega. The hotel also includes a conference center with three conference halls and covered parking. The object of Omega Sports Center is composed of sports halls for squash, badminton and tennis, along with changing rooms, wellness area and operational background of the object itself. The sports center also incorporates outdoor tennis courts and an underground tunnel connecting the Omega center and the NH Hotel. This thesis deals with the civil technological project of the building site and involves mainly the technical report of civil technological project, the study of realization of the main technological stages of the building object, the project of organization of construction, time schedule of aforementioned two main buildings, the technological standard with test and execution plans for the execution of underground construction by the impermeable concrete technology and for execution of variant solution of tennis hall roofing. Further, a comparison of the alternative roofing technology with current used roofing technology is performed, including the drawing documentation of new roofing alternative.
|
32 |
Bytové domy v Brně, Bystrci - příprava a organizace výstavby / The Block of Flats in Brno, Bystrc - Project Planning and ManagementŠarlejová, Petra January 2014 (has links)
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats.
|
33 |
Rekonstrukce Hlavní budovy Plaveč – příprava a organizace výstavby / RECONSTRUCTION OF THE CENTRAL BUILDING PLAVEČ – PREPARATION AND ORGANIZATION OF CONSTRUCTIONČerný, Karel January 2012 (has links)
This thesis deals with reconstruction of the home for the elderly Plaveč main building. These reconstruction is primarily interior renovation, the rooms of clients and staff facilities, but also the surrounding of the building. All work will be in full operation. Consideration of this factor in the organization of construction is the main subject of this thesis, which shall include traffic contexts, costing, budget, time schedule, equipment of construction site, construction machinery, technology procedure, occupational safety and resources.
|
34 |
Stavebně technologický projekt pro hotel v Krkonoších / Construction technology project for a hotel in Giant MountainsPozler, Tomáš January 2020 (has links)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.
|
Page generated in 0.1133 seconds