• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 141
  • 25
  • 23
  • 10
  • 9
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 221
  • 221
  • 138
  • 134
  • 134
  • 124
  • 115
  • 110
  • 107
  • 106
  • 105
  • 96
  • 94
  • 94
  • 94
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Stavebně technologický projekt rozhledny Vartovna u obce Seninka / Construction technological project of the lookout tower Vartovna near the Seninka village

Starnovský, Jakub Unknown Date (has links)
The diploma thesis deals with the complex construction of the Vartovna lookout tower near the village of Seninka. Within this work was prepared item budget, drawings of construction site equipment for the main construction stages, concreting scheme and landfill supply, time schedule of the whole construction, construction financing plan, number of workers, necessary machines and mechanisms with their deployment over time, technological regulation for monolithic foundations. hydraulic concrete structures, technological regulation for the assembly of the steel structure of the lookout tower, control and test plans for monolithic and prefabricated structures, the formwork scheme of all foundation structures, and safety and health protection at work.
212

Stavebně technologický projekt výrobní haly v Hodějicích / Construction Project for Implementation of Industrial Hall in Hodějice

Koudelková, Anna Unknown Date (has links)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
213

Sadová, Bytový dům M1 - stavebně technologický projekt / Sadova, Apartment building M1 - construction technology project

Štěrba, Marek January 2018 (has links)
The aim of the diploma thesis is construction-technological project of the whole construction focusing on the main building object - Apartment building, which is based on large-diameter drilling piles. The basis of the work is the budget of the main building and its timetable. Part of the thesis is a solution of organization of construction and design of building site equipment, technological regulation of selected activities, quality control and solution of transport relations including oversized transport. In addition, the design of the machine assembly, assessment of lifting mechanisms, safety and health protection and protection of the environment are solved.
214

Skladová hala v Měříně, příprava a organizace stavby / Project

Malý, Martin January 2018 (has links)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
215

Stavebně technologický projekt pro hotel v Krkonoších / Construction technology project for a hotel in Giant Mountains

Pozler, Tomáš January 2020 (has links)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.
216

Centrální dispečink pro řízení železniční dopravy Praha - příprava realizace a řízení stavby / Central control rail traffic management Prague - preparation for the implementation and management of buildings

Buček, Radek January 2016 (has links)
The thesis deals with the preparation of the implementation and management of building central dispatching of rail traffic management Prague. The thesis contains the selected part of building technological project together with appropriate drawings. The project addresses mainly the rough construction of the mainbuilding.The aim of this thesis is to design appropriate and effective way of realization of construction depending on local conditions.
217

Příprava realizace stavby Biology Park Brno / Preparation for construction management Biology Park Brno

Šťastná, Ludmila January 2016 (has links)
The thesis deals with the preparation of construction works Biology Park Brno . The goal is to determine the time, financial and material demands of the building and determine the appropriate method of construction technology . The work is focused on the main building object SO 01 - Building laboratories and offices , but some parts are addressed to the whole building. It is elaborated construction technology study , which followed closely solved the selected part of building technology project dealing with the given structures. Part of the work is devoted to the design optimization of the amount of formwork , which is necessary for construction.
218

Yacht club Hlučín - stavebně technologický projekt / Construction technology project of Yacht club in Hlučín

Labudek, Lukáš January 2016 (has links)
The subject of this thesis is a construction technology project object Yacht Club Hlučín. The basis for the elaboration of this work is the diploma thesis from Ing.Radim Kučera - Yacht Club Hlučín. This thesis includes technical report construction technology project, coordinating the situation with the construction of wider relations of routes for transportation of main materials, time and financial plan of the construction according to the technical-economic indicators, drawing building equipment, scheduling, inspection and test plan, technological regulation for the implementation of the gross substructure, itemized budget and the plan for OSH implementation in Yacht club Hlučín.
219

Stavebně technologická příprava dopravního terminálu v Peci pod Sněžkou / Construction and Technological Preparation of the Transport Terminal in Pec pod Sněžkou

Černý, Jiří January 2022 (has links)
The diploma thesis solves construction and technological preparation of the transport terminal in Pec pod Sněžkou. The content of the diploma thesis is a techical report on the construction technology project, the coordination situation, the time and financial schedule, the project of building site, selection of machines, time schedule for the main building object, plan for securing material resources for the main building of the transport terminal, technological prescription and inspection and test plan for monolithic ceiling structures. Another assignment part contains a plan for safety and health protection at work on the construction site and specialized topic is a noise study.
220

Vybrané části STP pro výstavbu administrativně bytového komplexu Sochorova / Selected parts of the Construction-technology Project for construction of Administration and Flat Buildings complex Sochorova

Dvořák, Marian January 2012 (has links)
Masters thesis is engaged of chosen parts of technological-buildig project of administrativ and housing complex of Sochorova in Brno, Žabovřesky. Contains technological-buildig study of first phase with brief description of advancement of construction with grafical scripts of particular steps, timetable and pecuniarytable of objects AB3, AB4, diagrams with various possibilities of using operatives. Thesis continous with calculation of entire first phase and item budged of object AB3(draft construction), statement of masurement, technical report of construction-technological AB3, plan of situaction of the building, technological manual of reiforced concrete ceiling of AB3 including plan of planking parts PERI, timetable, design of construction site equipment with technical report, proposal of machineries and crane, plane of inspections for chosen items, ecology and report about safety and health protecting on construction site.

Page generated in 0.1056 seconds