• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 141
  • 25
  • 23
  • 10
  • 9
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 221
  • 221
  • 138
  • 134
  • 134
  • 124
  • 115
  • 110
  • 107
  • 106
  • 105
  • 96
  • 94
  • 94
  • 94
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
171

Sportovní centrum Jihlava, stavebně technologická příprava stavby / Sports center Jihlava, civil technological project

Nevole, Jan January 2016 (has links)
The aim of this final thesis is to design selected parts of construction technology project for building used as an sports centrum in Jihlava. The attachments provide a solution of upper structural work, with focusing on floor structure forms and staircase. The thesis contains the technological procedures for constructing both variants of floor structure and staircase, principles according to which is the construction organised, safety and health measures taken on the construction site, design of the mechanical assembly, time plan, plan of inspections and testing, controlling and testing plans for both variants and construction details.
172

Skladová hala v Šakvicích - stavebně technologický projekt / Warehouse in Šakvice - construction technological project

Knotek, Vít January 2016 (has links)
Main goal of this thesis is effective design and comprehensible description of the assembly of reinforced concrete skeleton warehouse in Šakvice. In several chapters of this thesis is for preparing of this investor´s plan solved supplies prefabricated components. As well as their assembly into construction, equipment of construction site, used technologies, quality control and safety of performed works. There is great emphasis on the construction budget and its chronology. The aim was to use the rapid progress of construction of the supporting skeleton, taking into account the financial coast of the proposed technology.
173

Stavebně technologický projekt výrobní haly v Polničce / Building technology project of the industrial building in Polnička

Zeman, Roman January 2017 (has links)
The diploma thesis deals with the issue of the building technology project of the structural work of industrial building belonging to CECHO company in Polnička. The industrial building consists of two building objects, shop floor and office building. The main aim of the thesis is to focus on the time and financial management of the construction, schedule, site equipment management including time schedule of establishment and removal of temporary site equipment objects and their rental costs, transport routes planning, proposal of main building equipment, oversized transport and technological regulations including inspection and test plans of quality. Last but not least, the thesis is also aimed at the itemized budget.
174

Výrobní areál LIWA v Pelhřimově - příprava realizace a řízení stavby / LIWA manufacturing facility in Pelhřimov - implementation of construction

Jůn, Michal January 2017 (has links)
The aim of the thesis is the process of building technological project LIWA manufacturing facility in Pelhřimov. It deals mainly a technological process for the realization of the main building. The thesis contains a technical report, technological specification, control and test plan. Other parts of the work are time and financial plan, machine and mechanic design, project about equipment of construction site and time schedule. The annexes are further addressed drawings of the building site equipment.
175

Generative Design for Construction Site Layout Planning

Raj Pradip Birewar (10664183) 07 May 2021 (has links)
<p>The construction industry contributes significantly to the GDP of the United States, attributing to its growth at an unprecedented rate. Efficient planning on all stages of construction is the only way to combat dynamic obstructions and deliver projects on time. The first element involved in the planning phase deals with the layout of the Construction Site. It significantly regulates the pace at which construction operations function and directly affects the time, cost, and safety linked to the successful delivery of the target project. Hence, it is paramount to ensure that every component of the construction site maneuvers with the utmost productivity. One such equipment that occupies significant attention while carrying out the CSLP process is Tower Crane. Tower crane optimization is pivotal to ensure proper lifting and handling of materials, and warrant conflict-free work zones. This research, therefore, aims to optimize its position by maximizing the lift ability. To achieve the goals, Generative Design- a paradigm that integrates the constructive features of mathematical and visual optimization techniques, is used to develop a relatively comprehensible prototype. The first part of the research, thus, utilized Generative Design on two construction sites- one from the United States and one from India. After implementing the visual programming algorithm, an improvement of 40% was warranted in the lift score. A pool of potential alternatives was explored and supplemented by the trade-off illustrations. The concept of trade-off was substantiated by allowing a framework for prioritization of lift cycles, and facilitating a holistic decision-making process. To evaluate the usability, 12 participants were chosen based on their previous experience with tower crane operations. The participants witnessed a live demonstration of the algorithm, answered a Likert scale questionnaire, and appeared for an open-ended interview to provide feedback about the proposed Generative Design technique. After carrying out narrative analysis for the usability aspect- it has been unanimously observed that the technique has extreme efficiency of usage and can evidently prevent the occurrence of errors. The study concludes by providing recommendations to augment the significance and usability of Generative Design for tower crane position optimization. </p><br>
176

Řízení stavební zakázky ve stavebním podniku / Construction Order Management in the Construction Company

Šrámková, Michaela January 2022 (has links)
The thesis describes the project management of a construction contract in a construction company from the supplier's point of view. The work includes a theoretical and practical part. The theoretical part describes important definitions and knowledge, which are then used to create a practical part. It deals with the preparation and management of a specific construction contract called "Reconstruction of the sports hall Otrokovice" with the help of methods and procedures that the issue offers.
177

Obvodní oddělení policie ČR v Brně - Bohunicích, příprava realizace stavby / District Police Department of the Czech Republic in Brno-Bohunice, Preparation for Construction

Dubecký, Tomáš January 2022 (has links)
The aim of the diploma thesis is to prepare the construction called the District Police Department of the Czech Republic in Brno, Bohunice. The diploma thesis contains a technical report on the construction technology project, which deals with architectural and construction design solutions, coordination situation and transport routes, where critical points are assessed time and financial plan of construction, where all construction objects are described with their time and financial schedule, a study of the implementation of the main construction stages, which addresses the various stages of construction. The diploma thesis contains a technical report, item budget, plan for the establishment and liquidation of buildings and drawings of construction site equipment for each stage, design of the main construction machinery for the construction. A detailed time plan of the main building, a plan of its supply of materials for the rough construction was prepared for the given construction. Furthermore, the work contains a technological regulation for a reinforced concrete monolithic staircase, which is related to the control and test plan for a reinforced concrete monolithic staircase. The next assignment deals with the item budget of the main building for the rough construction, the drawing of the formwork for the reinforced concrete monolithic staircase and the economic assessment and evaluation of construction cranes.
178

Stavebně technologický projekt administrativní budovy Brno Business Park, 3. Etapa / Construction Project for implementation of administrative building of BBP

Janeček, Milan January 2022 (has links)
The content of my diploma thesis is a construction technology project of an administrative building in Brno. The work emphasizes the feasibility of the object. I prepared an implementation study with a detailed solution of the construction process in terms of time and financial plan. Technological regulations, control and testing plans and occupational health and safety are proposed. Drawings are pre-pared for the performed construction
179

Stavebně technologický projekt hotelu v Ostrožské Nové vsi / Construction technology preparation of hotel in Ostrožská Nová ves

Khamzina, Mariia January 2022 (has links)
The subject of this diploma thesis is civil technical project of a new building of the hotel Aztec in Ostrožská Nová Ves. The building was designed as a 6-storey building and will be used for accommodation and recreation. Thesis contains engineering report, a detailed time schedule for the main building object, project of construction site, technological notes and inspection and test plans for particular steps of construction, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes protection of health and safety at work taking into account environmental protection.
180

Stavebně technologický projekt výrobní a skladovací haly / Construction-technological project of production and storage hall

Marek, Jiří January 2022 (has links)
This diploma thesis deals with construction-technological project of production and storage hall in Hradec Králové. The thesis deals with complex of the implementation of the construction and focuses in more detail on the implementation of both foundation structures and assembly of the steel frame. The project includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, design and assessment of construction routes, construction equipment project, financial and construction schedule, machine design, schedule and budget of the main building, control and test plan for foundation structures, and occupational safety and health.

Page generated in 0.104 seconds