Spelling suggestions: "subject:"5construction site"" "subject:"constructuction site""
141 |
Skladový areál firmy Bidfood - stavebně technologický projekt / Bidfood warehouse - a construction technology projectŠpaček, Miroslav January 2020 (has links)
The goal of the thesis is a construction technological project of a Bidfood warehouse. Part of the work is the solution of technological regulation for drilled piles and assembly of steel skeleton, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
|
142 |
Stavebně technologická příprava skladového a administrativního objektu v Černé za Bory / Construction-Technological Preparation of Warehouse and Administrative Building in Černá za BoryŠtěpánek, Michal January 2020 (has links)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
|
143 |
Stavebně technologický projekt přípravy a realizace požární stanice v Jaroměři / Construction Project for Station of Fire and Rescue Services in JaroměřNývlt, Josef Unknown Date (has links)
The objective of this diploma thesis is the processing of the construction technology design as a part of the preparation and implementation of the fire station in Jaroměř. It is a new construction of the main building, which is supplemented by other objects and engineering buildings. The thesis deals with complex design of the implementation of the construction and then focuses in more detail on the installation of the supporting frame structure, which consists of reinforced concrete prefabricated elements. The whole project also includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, solutions for transport routes for construction supply, construction site design, machine set design, technological regulations with assembly diagrams, control and test plan, time plans and balance of resource needs, itemized budget and occupational safety and health plan. The diploma thesis is supplemented by a specialized part dealing with the reconstruction of the area road with a bituminous cover and the implementation of other paved areas within the area of the fire station.
|
144 |
Bytový dům v Hradci Králové – stavebně technologický projekt / Apartment Building in Hradec Králové – construction technology projectPavlásková, Klára Unknown Date (has links)
This diploma thesis is focused on construction technology solution of the construction of an apartment building in Hradec Králové. It contains a technical report of the construction technology project, time and financial evaluation of the object and the apartment building as a whole. The thesis deals with the technological regulations for the construction of a flat roof and the monolithic structures, for which control and test plans and the calculation of stripping of the formwork are prepared. The project of construction site equipment is divided into three stages, mainly rough substructure, rough superstructure and finishing work stage. Furthermore, the thesis contains the design of the main mechanisms and their deployment over time and item budget with a statement of acreage.
|
145 |
Stavebně technologický projekt kulturního domu / Constructive-technological project of cultural houseBittmannová, Lenka January 2012 (has links)
This thesis deals with the solution of building technological project Žabčice cultural center. Does the project site equipment, technological prescription for floor construction, roof deck flat roofs and cladding panels locking, time and financial plan of the building, mechanical assembly, EMS plan requirements.
|
146 |
Řízení stavební zakázky ve stavebním podniku / Building Order Management in the Building CompanyEis, Jan January 2013 (has links)
The master's thesis describe system of management construction project and elaboration prize offer from the perspective of contractor of building. Objectiv of this work is to introduce whit specific principles, procedures and methods, that are needed to prepare and management of construction contracts and their subsequen application to specific construction work - new building of locksmith in Chotěboř.
|
147 |
Residence Erasmus - příprava, realizace a řízení stavby / Residence Erasmus - preparation, implementation and project managementDokoupil, Jan January 2013 (has links)
This diploma thesis deals with the construction of a residential building The Erasmus Residence. This work includes a technical report of the issue solved, construction site installations of three phases of construction, which are groundwork, rough top construction and finishing. The work includes drawings of construction site installations for all these stages. The thesis also includes technological specification for thermal insulation systems including scaffolding construction, timing of construction, inspection and quality test plan and itemized budget.
|
148 |
Stavebně technologický projekt výstavby polyfunkčního domu v ulici Opuštěná, Brno / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING POLYFUNCTIONAL HOUSE IN OPUSTENA STREET, BRNODražilová, Michaela January 2013 (has links)
Project of master thesis solves brand new residential polyfunctional house with bike shop. The main object is a four-storyed, designed as a monolithic skeleton construction. The building is located in Opuštěná Street, Brno. The project is developed on the basis of project documentation and technical data, delivered by the designer in the behalf of investor requirements. Main goal of this project seeks to approach to real solution of the construction site. It is very important to compare also financial aspects, not only the technological. Last but not least, time requirements of construction plan and factual requirements of the customer. Constructive-technological project contains especially: technical report, site facilities, technologic regulation, schedule, financial budget, control and test plan, design of machinery, safety and health protection etc.
|
149 |
Stavebně technologický projekt polyfunkčního bytového domu / Construction technological project of polyfunktion house with block of flatsHromník, Lukáš January 2014 (has links)
Construction technological project of polyfunctional flat house SO 107, solves the realization of reinforced concrete monolithic ceiling construction the financial and time schedule, technological instruction of concreting, proposal of mechanization, the technical report of technology construction project. The proposal formwork system Multiflex.
|
150 |
Stavebně technologické řešení bytového domu na ulici Kamenná / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDINGGirard de Villars, Petr January 2014 (has links)
Master´s thesis deals with constructive-technological project of apartment house in Kamenná street in Brno-Štýřice. The aim of this work is the solution with the view to the financial, time, technical and technological requierements. The thesis includes technical report of constructive-technological project, technological instructions with inspectional and test plans, machinery configuration, safety plan, construction impact on enviroment, technical report of construction site with plans. The part of the thesis is also schedule of the construction, budget, time and financial plan of the construction.
|
Page generated in 0.11 seconds