Stavebně technologický projekt administrativní budovy / Constructive technological project of an administrative buildingLačňák, Slavomír January 2018 (has links)
The final thesis is focused on construction of the main technological stages of the administrative building of the Vídeňská in Brno. The final thesis contains the object engineering report, technological study, technological report, design of construction machinery and their transport. It also includes control and test plan, detailed schedule, item budget, and device object design. Finally is a plan of safety measures on the building.
|
122 |
Novostavba administrativního objektu v Karviné, stavebně technologický projekt / New Administrative Building in Karviná, Construction Technological ProjectToman, Marek January 2018 (has links)
The diploma thesis deals with preparation, organization and construction technology of an administrative building in Karviná. It is about new building with four above ground floor. From a design point of view, the structure is designed as a precast concrete frame. The diploma thesis contains technical report, coordinating situation with design of transport ways, time financial plan, study of the implementation of the main technological phases, concept of construction site equipment, design of machinery set, time plan with worker bilancion, material delivery plan for rough building, technical report for masonry work, inspection and test plan for masonry work, item budget with the statement of measurements and noice study for earthworks.
|
123 |
Stavebně technologický projekt rezidenčního domu v Brně / Building and technological project of a residential house in BrnoPodškubka, Martin January 2018 (has links)
The subject of this Diploma thesis is building and technological project of a residential house in Brno, which contain the implementation of the underground car park and residential building, which has three above-ground floors. Attention is focused mainly on the technological processes of bottom building. Text section contains the technical report on the structural and technological project, study implementation of major technological stages of building, technical report of construction site equipment, technological regulations, inspection and test plan, study of noise, plan health and safety at work, the design of the main building machines and mechanisms including transport routes. The attachment section contain time and financial plan construction-object, time deployment of machines, plan of material resources, time schedule, technology standard, budget, drawings of construction site equipment, verification of tower crane construction and schema of processes concreting.
|
124 |
Polyfunkční dům Prudký - stavebně technologický projekt / Multifunctional house Prudký - construction technology projectKaláb, Ondřej January 2018 (has links)
The aim of this Diploma Thesis is constructionally - technological solution of the rough construction of polyfunctional house on the corner of Bánskobystrická and Medlánecká streets in Brno Řečkovice. In the Diploma Thesis I will deal with the plan of the work procedure of the execution of roof construction layers, machine sets, itemized budget, construction schedule, construction site equipment, inspection and testing plan, ecology and transport relations related to the construction. I would like to point out the complication of the construction with a lack of space because the construction is in the area of Brno Řečkovice. The plan of construction execution was more difficult due to lack of space for storage of materials and machinery handling.
|
125 |
Centrální požární stanice Hradec Králové - stavebně technologický projekt / Central Fire Station in Hradec Kralove - Construction technology projectMalina, Marek January 2018 (has links)
The diploma thesis deals with the formation of a constructive-technological project for the building of the Central Fire Station in Hradec Králové - 1. Phase. The building consists of five floors and one underground. The aim of the thesis is to choose and process suitable solution of the building in terms of financial, time and technical requirements based on the project documentation provided by the designer. The thesis deals with the time and financial plan of the construction, the design of the main machines and mechanisms, the planning of the material supply and its transport routes, the design of the construction site equipment, the technological regulations, the control and testing plan for the monolithic and steel constructions of the building and the time schedule of the building with the technological norm.
|
126 |
Vybrané části stavebně technologického projektu Centrální zóny Technologického parku v Brně / ProjectŘezníčková, Tereza January 2018 (has links)
The diploma thesis deals with construction technological project of Central zone technology park in Brno. The thesis involves engineering report, coordinate situation, time and financial plan, study of the main technological stages, project of site equipment, design of machine formativ, time schedule, itemized budget with bill of quantities, technological prescription of monolithic reinforced concrete frame, kontrol and test plan, sefety and health care policy and structural details.
|
127 |
Projekt přípravy a realizace polyfunkčního domu ve Velkých Bílovicích / Execution of Multifunctional Building in Velké BílovicePospíšilová, Izabela January 2018 (has links)
The thesis is focused on construction technology solution for realization of the construction of a polyfunctional building in Velké Bílovice. Part of the thesis is technical report for construction technology project, time and financial evaluation of selected building as well as the whole project. The thesis contains selected technological regulations of carried out activities, control, and test plans, safety and health protection at work, a design of major building machines and mechanisms, a concept of the construction site or instructions for using the building.
|
128 |
Nájemní objekt Campus Bohunice – stavebně technologický projekt / The lease object Campus Bohunice - construction technology projectPlatzerová, Veronika January 2018 (has links)
The subject of this diploma thesis is the construction and technological solution of the construction of the campus building Bohunice - object C. This building is a new building located on several unfinished parcels. The diploma thesis contains technical reports, technological regulations of the selected works, control and test plans for these works, design of the machine group, the transport relations in the narrower and wider surroundings of the construction, the budget budget, the timetable, the design and realization of the tower cranes.
|
129 |
Příprava a organizace výstavby bytových domů Rozhledna v Chrudimi / Preparation and organization of the construction of residential houses in Chrudim LookoutKohout, Jiří January 2018 (has links)
The content of the diploma thesis is a building-technological project of the new building of residential buildings Rozhledna in Chrudim. The thesis contains technological regulations for a rough bottom structure and a rough top structure. Technological regulations are complemented by design of machine assembly, site facilities and control and test plans. Work safety, construction risk assessment, time schedule of main objects, object time and financial plan and budget of main buildings are also solved. An important part is the comparison of the parallel, gradual, current construction and the design of the thermal insulation system of the curtain wall.
|
130 |
Stavebně technologický projekt bytových domů Nad Městem, Nové Město na Moravě / Construction Technological Project of Building Blocks of Flat Nad MěstemVopršalová, Tereza January 2018 (has links)
The diploma thesis deals with construction and technological preparation of apartment buildings in „Nad Městěm“ locality in Nové Město na Moravě. The buildings have four above-ground floors and one underground floor with garages. This work contains a technical report of a construction project, a coordination situation with broader transport routes, a time and financial plan, a study of the implementation of the main technological stages, a project of the building site, the design of the main building machines and mechanisms, the cross building budget, the technological regulations, the control and test plans and specialized assignment of the noise study.
|