• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 141
  • 25
  • 23
  • 10
  • 9
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 221
  • 221
  • 138
  • 134
  • 134
  • 124
  • 115
  • 110
  • 107
  • 106
  • 105
  • 96
  • 94
  • 94
  • 94
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Příprava realizace přestavby domova pro seniory v Brně / Preparation for the reconstruction of a home for the elderly in Brno

Vičar, Ondřej January 2022 (has links)
The topic of the thesis is the construction and technological preparation of the extension of the retirement home in Brno. It is a three-storey building based on piles with combined vertical structures and monolithic ceilings, the building has a flat roof. The work includes a technical report, time and financial plan of the building, project of construction site equipment, mechanical assembly of the main mechanisms used during construction, as well as a time plan and the necessary number of workers.
112

Hotel v Dolní Lomné - stavebně technologický projekt / Hotel in Dolní Lomná - construction technology project

Bulawa, Tomáš Unknown Date (has links)
The subject of this diploma thesis is dealing with a construction-technological project of a hotel in Dolní Lomná. The main subject of this thesis is a technological report, coordination situation of the construction with broader relations to transport routes, a time and financial plan of the construction, a feasibility study of the main technological phases, a project of the site equipment, a suggested list of the main construction vehicles and building mechanisation, a time-schedule plan, a plan of material resources, a technological regulation for the implementation of monolithic ceilings, control and test plan, health and safety at work and a technological regulation for the implementation of rider bracing with economic balance. Part of the work is the itemized budget and calculating to THU.
113

Effekten av olika logistiklösningar : En studie kring fördelar och nackdelar med tredjepartslogistik och inbärning till ett projekt i Dalarna

Andersson, Julia, Liedström, Matilda January 2021 (has links)
Inom byggbranschen har man börjat sett fördelar med att titta mer på logistiken iolika byggprojekt. Många olika studier har utförts kring vilka lösningar som finnsoch hur man kan använda dem.Denna studie utförs i samarbete med Skanska Sverige AB. Studien syftar till att påolika sätt undersöka vilka fördelar och nackdelar man kan se med att använda sigav logistiktjänsterna terminalisering och inbärning till ett byggprojekt i Dalarna.Byggprojektet som utgör det specifika fallet i studien är ett ombyggnadsprojekt aven grundskola. Elever vistas i detta skolområde samtidigt som ombyggnationenutförs etappvis inom det stängda arbetsområdet. Studien innefattar även tredje mandär trygghetsupplevelse kring arbetsplatsen undersöks. Inbärningens användbarhetdiskuteras därefter utifrån trygghetsupplevelsen kring och inom arbetsplatsen samtutifrån ekonomiskt och ekologiskt perspektiv.Metoder som används i studien är intervjuer med somliga från projektets ledning,en logistiker på Skanska, rektor för årskurs F-6, yrkesarbetare samt tredje man.Utöver dessa intervjuer utförs även en fältstudie som involverar observationer ochmätningar. Som avslut utförs överslagsberäkningar för att se om användning av ettexternt företag kan leda till ekonomisk lönsamhet.Studiens resultat visar hur man inom företaget ser på logistiklösningarnaterminalisering och inbärning idag. Här visas även vilka fördelar och nackdelarolika parter ser med tjänsterna. Fältstudiens mätningar visar hur många av tredjeman som rör sig kring arbetsområdet i anslutning till att skoldagen börjar.Överslagsberäkningar visar på att man kan se en besparing ifall man använder sigav ett inbärningsföretag som arbetar under kvällstid och detta sker i samband medatt man använder sig av terminalisering.Studiens slutsatser är att det inte finns en allmän lösning till hur logistikfrågan skalösas på olika projekt. Om det finns möjlighet för terminalisering i området ärdetta samt inbärning ett alternativ för projektet. / Within the construction industry the advantages of looking at the logistics todifferent projects has been acknowledged during the past couple of years.This study has been written in collaboration with Skanska Sverige AB. Thepurpose of the study is to, in different ways, examine what advantages anddisadvantages there are in using the logistics solutions terminalization (also knownto be a part of Third Party Logistics) and inside delivery to a specific project inDalarna, Sweden. This project is a remodeling project of a school with studentsfrom six to sixteen years old. Within the school area new parts of the school isbuilt while students are located in the yet existent buildings. This infer thatstudents move around the construction sites daily. The study also involves thirdparty people and how these people feel about the large transports connected to theproject. The inside delivery utility is then discussed based on the securityexperience within and around the construction site along with the economic andecological perspective of the service.The methods used in this study are interviews with three people of the projectmanagement, one person that works with logistics at the company, the headmasterof the younger students, skilled workers and third party people. Furthermore afield study is done that includes measurements and observations. As a close,calculations are done to determine if a economical profitability could be possibleby using inside delivery.Results from the study show how the logistics solutions terminalization and insidedelivery is looked at within Skanska today. Here, the advantages anddisadvantages with the different services are displayed from the perspectives of thepeople who were interviewed. The results from the measurements from the fieldstudy presents how many third party people that move adjacent to the two activeconstruction sites when the school day begins. The calculations show that it iseconomically beneficial to use inside delivery after the end of the workday whileused with terminalization.Conclusions of the study indicate that there are no overall solutions regarding howthe logistics must be used in different projects. If there is a possibility to use terminalization in the area where the project is situated, this, along with insidedelivery, is a good alternative for the project.
114

Dynamiska APD-planer : En fallstudie från inspektionsrundor med 360-graders hjälmkamera

Andersson, Isak January 2023 (has links)
Arbetsdispositionsplanen (APD-plan) är en central metod för planering av byggarbetsplatser och stöd för platsledningens beslutsfattande. Idag är stödet nästan uteslutande manuellt arbete även om det görs med digitala verktyg och uppdatering av APD-planen uteblir.  Denna studie syftar till att undersöka möjligheterna för att automatisera överföringen av information från en 360-graders hjälmkamera på en byggarbetsplats till en digital APD-plan integrerad med byggnadsinformationsmodeller (BIM). Målet med studien är att undersöka hur informationen från en hjälmkamera kan kopplas till digitala verktyg såsom APD-planer och BIM-modeller samt hur denna information kan användas som stöd för platsledningen på byggarbetsplatsen genom kontinuerlig uppdatering av APD-planen.  Studien baseras på en fallstudie som innefattar datainsamling i form av bilder och videor från byggarbetsplatsen, intervjuer med personer med erfarenhet och kunskap inom byggbranschen samt observationer från fältstudie. En litteraturstudie presenteras också, där teori kopplad till examensarbetets syfte och frågeställning används som grund för analys, diskussion och slutsatser.  För att uppnå syftet och målen med studien besvaras följande forskningsfrågor:  Hur uppdateras och används APD-planer i dagsläget inom byggsektorn?  Vilka utmaningar och svårigheter är förknippade med automatiserad överföring av information från hjälmkameror till APD-planer?  Vilka fördelar och nackdelar medför användningen av en 360-graders hjälmkamera som verktyg för automatiserad uppdatering av APD-planer och integrering med BIM-modeller?  Utifrån litteraturstudien och genomförda intervjuer uppdateras APD-planer i nuläget manuellt genom att APD-ansvarig genomför inspektioner ute på arbetsplatsen. Denna metod är tidskrävande och uppdateringar tenderar att utebli på grund av tidsbrist.  Resultatet av fallstudien indikerar att insamlad data från byggarbetsplatsen automatiskt kunde överföras till APD-planen men inspektionen för att samla in data krävde manuellt utförande. APD-planen uppdaterades manuellt genom att jämföra insamlade data från byggarbetsplatsen och sedan uppdatera APD-planen utifrån dessa förändringar.  Utvecklad metod skapar förutsättningar för en smidare och effektiv uppdateringsprocess av APD-planen. APD-ansvarig kan utföra uppdateringar digitalt utan fysisk närvaro på platsen. Med metoden kan APD-planer uppdateras frekvent där senaste information finns tillgänglig i smartphones för samtliga involverade i projektet. Nackdelen med utvecklad metod är att manuell uppdatering krävs där vidare forskning är nödvändig för att automatisera uppdateringen. Formatet av insamlat material medförde att en automatiserad uppdatering uteblev eftersom materialet inte kunde kopplas samman med APD-modellen utan enbart jämföras. Om formatet av insamlat material skulle kunna omvandlas till modeller eller placeras ovanpå befintliga modeller skulle en automatiserad uppdatering av APD-planen vara genomförbar. / The Construction Site Utilization Plan (CSUP) is a central method for planning construction sites and support for site management's decision-making. Today, the support is almost exclusively manual work, even if it is done with digital tools, updating the CSUP tends to be absent.  This study aims to investigate the possibilities of automating the transfer of information from a 360-degree helmet camera on a construction site to a digital CSUP model integrated with building information models (BIM). The goal of the study is to investigate how the information from a helmet camera can be connected to digital tools such as CSUP and BIM models and how this information can be used to support site management on the construction site through continuous updating of the CSUP.  The study is based on a case study that includes data collection in the form of images and videos from the construction site, interviews with people with experience and knowledge in the construction industry, and observations from field studies. A literature study is presented as well, where theory linked to the aim and question of the thesis is used as a basis for analysis, discussion and conclusions.  In order to achieve the aim and objectives of the study, the following research questions are answered:  How are CSUPs currently updated and used in the construction sector?  What are the challenges and difficulties associated with automated transmission of information from helmet cameras to CSUPs? What are the advantages and disadvantages of using a 360-degree helmet camera as a tool for automated updating of CSUPs and integration with BIM models?  Based on the literature study and conducted interviews, CSUPs are currently updated manually by the CSUP manager carrying out inspections at the construction site. This method is time consuming and updates tend to fail due to lack of time.  The results of the case study indicate that data collected from the construction site could be automatically transferred to the CSUP but the inspection to collect the data required manual execution. The CSUP was manually updated by comparing collected data from the construction site and then updating the CSUP based on these changes.  The developed method creates the conditions for a smoother and more efficient updating process of the CSUP. CSUP managers can carry out updates digitally without physical presence on site. With the method, CSUPs can be updated frequently where the latest information is available on smartphones for everyone involved in the project. The disadvantage of the developed method is that manual updating is required where further research is necessary to automate the updating. The format of collected material meant that an automated update was not possible because the material could not be connected to the CSUP model but only compared. If the format of collected material could be converted into models or placed on top of existing models, automated updating of the CSUP would be feasible.
115

Soil and Water Conservation with an Emphasis on Stormwater Management, Public Involvement, Erosion and Sediment Control, and Geographic Information Systems: An Internship with Warren County Soil and Water Conservation District

Botschner, Caitlin Jean 09 September 2008 (has links)
No description available.
116

Stavebně technologický projekt přípravy a realizace bytového domu v Brně Líšni / Technological project of preparation and realization of residential house in Brno-Lisen

Nečasová, Barbora January 2012 (has links)
The technological project deals with the processing of materials and documentation for the preparation and realization of the residential building in Brno Lišen.The project includes a technical report which closely provides basic information about the building. These information are complementing and justifying the project documentation of the construction technologies and other related documantation which are focusing on the creation of a control and test plans , support of the implementation of a safety plan on the construction site, proposal of the main building machines and mechanisms, design of the supply processes within the realization phase of the building process. It also contains technical regulations with detailed descriptions of chosen construction processes .
117

Bauklimatische Simulationsverfahren zur Lösung von Entwurfs-, Planungs- und Sanierungsaufgaben in Syrien / Building climatic simulation methods for the solution of design, planning and renovation projects in Syria

Bishara, Ayman 13 January 2014 (has links) (PDF)
Die vorliegende Dissertation befasst sich mit der Entwicklung, Implementierung, Verifizierung und beispielhaften Anwendung eines thermohygrischen Modells zur Lösung bauklimatisch anspruchsvoller Planungsaufgaben. Als Anwendungsbeispiele dienen zwei Planungsprojekte an kritischen Standorten, ein Sanierungsentwurf für ein Wohngebäude in der warm-trockenen Klimazone (Damaskus) und ein Neubauentwurf für ein Kirchengebäude in der warm- feuchten Klimazone (Latakia). Die Entwicklung des thermohygrischen Berechnungsmodells wurde auf der Grundlage einer vereinfachten Gebäude- Energie- und Feuchtebilanz vorgenommen. Das Modell prognostiziert den thermischen und hygrischen Raumklimaverlauf in Abhängigkeit des Außenklimas, der Baukonstruktion und der Raumnutzung. Die Validität des Modells konnte in einem ersten Schritt am Beispiel eines Archivbaus am Standort Dresden nachgewiesen werden. In einem zweiten Schritt wurde das Modell in seiner Funktionalität (Eingabeparametervariabilität und -flexibilität) erweitert und in das Programm CLIMT (Climate-Indoor-Moisture-Temperature) implementiert. Die Validität der erweiterten Funktionalität des Programms konnte mit Hilfe von Messergebnissen eines Testhauses am Standort Partwitzer See (Brandenburg) sowie den für dieses Gebäude durchgeführten Simulationsergebnissen (Software TRNSYS) nachgewiesen werden. Die Anwendung des entwickelten Programms CLIMT wurde für zwei gehobene bauklimatische Problemstellungen demonstriert. In beiden Fällen handelt es sich um Gebäude, deren historisch gewachsenes Umfeld und deren bautypologische Traditionen maßgebende Planungsaspekte darstellen. Die Standort- Klimazonen beider Gebäude bringen besondere Schwierigkeiten mit sich. Für das Sanierungsplanungsbeispiel „Damaszener Wohnhaus“ wurden die Hauptmerkmale der historischen städtebaulichen Einbindung, der Gebäudezonierung sowie der traditionellen gestalterischen und bautechnischen Gebäudeelemente herausgearbeitet. Im Anschluss daran wurde die historisch- bauklimatische Funktionsweise dieses Gebäudetypus mit zahlreichen CLIMT- Variantenrechnungen näher betrachtet. Die besondere klimatische Schwierigkeit des Standortes Damaskus besteht in den permanent hohen Lufttemperaturen von bis zu 42°C, verbunden mit sehr niedrigen Luftfeuchten und Luftgeschwindigkeiten. Es wurden die beiden wesentlichen bauklimatische Funktionsbereiche, deren maßgebende Eigenschaften und deren Wirkungsweise für das Standortklima analysiert. Die Ergebnisse dieser Analyse bilden eine Hilfestellung für die traditionsbewusste bauklimatische Konzeption ähnlicher Gebäudetypen in dieser Klimazone. Auch für den Anwendungsfall der Neubauplanung eines Kirchenbaus am Standort Al-Rwda (Latakia) wurde eine umfassende bauhistorische Analyse des Gebäudetypus durchgeführt. Es konnten die historisch gewachsenen Hauptmerkmale des byzantinischen bzw. syrischen Sakralbaus in Bezug auf die Gebäudekubatur, Fassadengestaltung, Baustoffwahl und Innenraumgestaltung herausgestellt werden. Die bauklimatische Optimierung des neu zu errichtenden Kirchenbaus wurde mit Hilfe von CLIMT- und DELPHIN- Simulationsstudien vorgenommen. Am Gebäudestandort Latakia bestand die besondere Problemstellung in der Berücksichtigung hoher Luftfeuchten und Temperaturen welche ein erhöhtes Schadenspotenzial für die Außenbauteilkonstruktionen bedingen. Trotz der zahlreichen Randvorgaben der Planung konnten die bauphysikalischen Eigenschaften der gewählten Konstruktionen so weit wie möglich den vorteilhaften historischen Konstruktionseigenschaften angenähert werden so dass Schadensfreiheit gewährleistbar ist und der Energiebedarf weitestgehend minimiert wurde. Auch die Erkenntnisse dieses Kapitels bieten Planungshilfestellungen für den Entwurf ähnlicher Gebäudetypen und sind des Weiteren auf andere Klimazonen, so auch die gemäßigte Klimazone, übertragbar. Die Dissertation leistet einen wichtigen Beitrag zur Verbesserung des Entwurfsprozesses indem sie ein praxistaugliches aber dennoch exaktes Bewertungsmodell zur Verfügung stellt und dessen Anwendung im Zusammenspiel der zahlreichen Entwurfsaspekte wie z.B. Städtebau, Nutzungsanforderungen, Statik, Liturgie, Baugeschichte und vor allem Bauklimatik, beispielhaft aufzeigt. Die Ableitung bauklimatischer Regeln bzw. Erkenntnisse konnten für zwei bauklimatisch bedeutende Klimazonen, die warm- feuchte und die warm- trockene Zone, an Hand zweier Entwurfsfelder bzw. Entwurfsbeispiele aufgestellt werden. Die erzielten Erkenntnisse beruhen dabei nicht nur auf der Anwendung des thermohygrischen Gebäudemodells sondern auch auf einer theoretischen Analyse der baugeschichtlichen Vorbilder für die Entwurfsbeispiele der jeweiligen Klimazone.
118

ARBETSMILJÖ OCH SÄKERHET : Systematiskt arbetsmiljöarbete på byggarbetsplatser i Mellansverige

Yousef, Jivara January 2017 (has links)
The construction industry is a large industry with approximately 320,000 employees according to the Swedish construction industry. As the work environment at construction sites affects a large number of individuals, it is important that there is good security at the construction sites, in order to reduce and prevent workers in the construction industry from being injured. The work thesis has been carried out in collaboration with Tuna Förvaltning & Entreprenad AB with the aim of creating better conditions for work environment and strategic safety work at Tuna Förvaltning & Entreprenad AB's construction sites, as well as highlighting risks and safety aspects. This qualitative study has been carried out at Tuna Förvaltning & Entreprenad AB, where semi-structured interviews and observations were conducted to then use the information as the foundation of the study. The work has also been based on reviewed literature studies in the form of pre-review. In order to have a good working environment and safety at the construction sites, a number of factors are involved. The study shows that time, cleaning, communication, education and experience are the factors that have the greatest impact on the work environment and safety. According to some of Tuna Förvaltning & Entreprenad AB's workforce, there will always be deficiencies in safety, while some claim that a "zero vision" is possible to reach, so far no occupational accidents has occurred at Tuna Förvaltning & Entreprenad AB's construction sites, however, it seems that the subject does not get enough time, resources and like to prevent future accidents with "safety-first". The Work Environment Authority requires employers to systematically work with environment and safety issues with a vision of "zero tolerance", in which is strengthened by the work environment act. The interviews show that the viewpoint of the working environment differs depending on what perspective is being analyzed, for example, the supervisor has a wider perspective and greater responsibility whilst the professional worker has more narrow perspective and less responsibility. The survey shows that planning and preventive work can prevent workplace accidents with a systematic follow-up. In order for professionals and supervisors to understand the risks and preventive work they should be educated and thus gain an awareness of the problem. Improvement needs to create more awareness and prevention for work environment and safety with "safety deadline" have always been a goal to reach. One hope is that the working environment and security policy will contribute to improved security at the company's construction sites. systematic environmental work simplified by existing routines in environmental work for construction workers, leads to increased workplace safety and fewer occupational accidents. / Byggbranschen är en stor bransch med ca 320 000 sysselsatta personer enligt Sveriges byggindustrier. Då arbetsmiljön på byggarbetsplatserna påverkar ett stort antal individer är det viktigt att det råder en god säkerhet på byggarbetsplatserna, för att minska och förhindra att de anställda inom byggbranschen inte kommer till skada.Examensarbetet har utförts i samarbete med Tuna Förvaltning & Entreprenad AB i syfte att skapa bättre förutsättningar för arbetsmiljö och säkerhetsarbete ute på Tuna Förvaltning & Entreprenad AB:s byggarbetsplatser samt att belysa risker och säkerhetsaspekter. Kvalitativa studie har utförts på Tuna Förvaltning & Entreprenad AB:s byggarbetsplatser där semi-strukturerade intervjuer och observationer utförts för att sedan använda informationen som grundpelare i studien.För att det ska råda god arbetsmiljö och säkerhet på byggarbetsplatserna spelar ett flertal faktorer in. Studiens resultat visar att tid, städning, kommunikation, utbildning och erfarenhet är de faktorer som har störst inverkan på arbetsmiljön och säkerheten. Enligt en del av yrkesarbetarna på Tuna Förvaltning & Entreprenad AB kommer det alltid att finnas brister inom säkerheten medan en del påstår att en ”noll-vision” är möjlig att nå. Tuna Förvaltning & Entreprenad AB:s ett ungt företag och hittills har inga större arbetsolyckor inträffat på deras byggarbetsplatser. Emellertid tycker en del att ämnet inte får tillräckligt med tid, resurser och dylikt för att förhindra framtida olyckor med ”safety first”. Arbetsmiljöverket ställer krav på att arbetsgivaren skall arbeta systematiskt med arbetsmiljö och säkerhetsfrågor med en vision om ”noll-tolerans” vilket styrks av arbetsmiljölagen.Intervjuerna visar att synen på arbetsmiljön skiljer sig åt beroende på vilket perspektiv som analyseras, exempelvis har arbetsledare ett bredare perspektiv och större ansvar medan yrkesarbetaren har ett smalare perspektiv och mindre ansvar.Undersökningen visar att planering och förebyggande arbete kan förhindra arbetsplatsolyckor med ett systematiskt uppföljningsarbete. För att yrkesarbetare och arbetsledare skall ha förståelse för risker och förebyggande arbete bör de utbildas och därmed erhålla en medvetenhet kring problemet.Förbättringsbehov föreligger när det gället att skapa mer medvetenhet och ha ett förebyggande syfte för arbetsmiljö och säkerhet med ”safety first”. En förhoppning är att en bättre arbetsmiljö och en ny upprättad säkerhetspolicy kommer att bidra till en förbättrad säkerhet på företagets byggarbetsplatser. Det systematiska arbetsmiljöarbetet med förbättrad befintliga rutiner i arbetsmiljöarbetet för byggnadsarbetare bör leda till ökad säkerhet på arbetsplatsen samt undvika arbetsolyckor.
119

Bytový dům Ivančice - stavebně technologický projekt / Apartment building in Ivančice - construction technology project

Fejfar, Michal January 2018 (has links)
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
120

Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt / Construction Project - Apartment Building "Za Pivovarem" Lázně Bohdaneč

Volf, Miroslav January 2018 (has links)
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.