Spelling suggestions: "subject:"5construction system"" "subject:"constructuction system""
41 |
Hotel "Na vyhlídce" / The Hotel "On the View"Brandýská, Veronika Unknown Date (has links)
The content of this bachelor work is the project documentation of the hotel On the View in Nový Hradec Králové. The build has three ground floors, without partial basement and it is roofed by flat roof with pea gravel. A build has 2 parts. First part si for guests and second part is for employees. The build has 2 entrance. In the first floor is reception with facility, toilet, restaurant with kitchen, food warehouses, untility room and background for employees. From a restaurant is access to the terrace. In the second and third floor are rooms for 34 guests (of which 2 for handicapped) and background for cleaning women. A Hotel has car park for guests with 13 places ( of which 2 fort handicapped) and car park for employees with 4 places. The construction system is mostly made of polished ceramic blocks Porotherm. Horizontal construction is made up as Porotherm ceiling with brick inserts MIAKO and ceramic-concrete ceiling beams. Part of the proposal is thermal engineering assessment, fire safety solutions and assessments in terms of acoustic and daylight.
|
42 |
Administrativní budova / Office BuildingSzabo, Daniel January 2017 (has links)
The aim of the thesis is recently erected administration building situated in Brno, urban area Slatina. he bulidong consits of three storeys and one underground storey. Architectural composition is temperate and rational with regard on functional use of building and considerates demnads of the investor. Building is created mainly for administration purposes.First storey conists form more parts, there is administrative part, space for shops,stores, relax zones,and the part for stores and utility room. Second and third storey is also for administration , relax zones and social background.Undergorund is the space for garage compound, utility rooms, the spare source for heating, ventilating and air conditioning (HVAC)and store.Load-bearing structure is system S1.2 - reinforced concret skeleton system. The foundation construction is developed from foundation pad, foundation strips and foundation slab. The single- shell roof of this buildng is proposed as the flat roof above the first and second storey and as the roof with growing layer and mound of river stones above the third storey. Our aim was to propose the commercial space for offices with variation usage and also the space for shops, work out compact bulding with spacy and functional disposition.We worked out design documentation in accordance to valid legislation, laws,and technical norms. Drawings are made in AutCAD and visualisations in SketchUp program.
|
Page generated in 0.0776 seconds