• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • 1
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Disputes Settlement For Contract Execution of Public Construction

Chen, Kuo-Shu 16 July 2003 (has links)
Disputes Settlement For Contract Execution of Public Construction Abstract Disputes Settlement for Contract Execution of Public Construction is a contemporary course recently; it includes cost management, construction management, contract management, risk management and knowledge of negotiation etc. The characteristics of public construction are huge amount contract, long period of construction, higher technology level, complicate of contract, Contract of adhesion ¡]Standard Form Contract¡^attribution etc. So that, the risk and uncertainly of public construction are more than generally construction, and it have great impact on the exit contract execution since the foreign construction company bring in professional attorney and claims expert be in the Disputes Settlement for Contract Execution of Public Constructions. It will bring forth disputes between project planning, design, tend, construction, inspection and acceptance, but it is more complicate and significant influence on the construction period. Therefore, the field of research is Disputes Settlement For Contract Execution of Public Construction, and the focus are risk management and strategic, Disputes prevent and action, and establish a best dispute settlement model of Contract Execution. Firstly of the research describes the characteristics and subtext of negotiation, conciliation, arbitration, suit, the Complaint Review Board for Government Procurement (CRBGP) for mediation and DRB from the literature, and then we instantiate disputes case of Contract Execution according the article 85-1 of the Government Procurement Law, and analysis the risk and strategic, built up the dispute model of Contract Execution, and make approaches to disputes prevent and action of Contract Execution, for example, fair contract and fare risk share between the entity and the supplier, endue with the efficacy of negotiation, and established the system of DRB. Finally, the research generalizes in management subtext, useful management at Contract Execution, decrease the uncontrolled factor of risk, and avoid the dispute of Contract Execution effectually.
2

The Sanctioning Power of the Administration in the Public Procurement Scope: The Cases of Peru and Colombia / La Potestad Sancionadora de la Administración en el Ámbito Contractual: Los Casos de Perú y Colombia

Quintero Múnera, Andrés, Páez Ibáñez, María Alejandra 10 April 2018 (has links)
Initially the exercise of sanctioning powers is contextualized in the field of government procurement in Colombia, regulatory and jurisprudential development of this power and the procedure envisaged by the legislature for the imposition of sanctions is exposed when a violation or breach of it becomes apparent the contractor’s obligations, specifying the scope and gaps that the process involves. Then the consecration of the sanctioning power of the administration is presented in the Peruvian law, marking the differences with the model adopted by the Colombian law, to conclude with some perspectives on the subject. / Inicialmente se contextualiza el ejercicio de la potestad sancionadora en el ámbito de la contratación estatal en Colombia. Se expone el desarrollo normativo y jurisprudencial de esta facultad y el procedimiento que ha previsto el legislador para la imposición de sanciones cuando se evidencie una infracción o incumplimiento de las obligaciones del contratista, precisándose el alcance y los vacíos que el procedimiento comporta. En seguida, se presenta la consagración de la potestad sancionadora de la administración en el derecho peruano, marcando las diferencias con el modelo adoptado por la legislación colombiana, para concluir con algunas perspectivas sobre el tema.
3

Os efeitos da modalidade pregão na execução dos contratos continuados: um estudo de caso

Amorim, Patricia Carneiro Leão 30 November 2012 (has links)
Submitted by Patricia Carneiro Leão de Amorim (pclamorim@hotmail.com) on 2013-12-13T19:23:49Z No. of bitstreams: 1 Versão final encaminhada a biblioteca para submissão.com o doc. de aprovação corrigido.em word.docx: 3188647 bytes, checksum: ad3a8970b862902ac8ad0cca609e0fd4 (MD5) / Rejected by ÁUREA CORRÊA DA FONSECA CORRÊA DA FONSECA (aurea.fonseca@fgv.br), reason: Prezada Patrícia, O arquivo tem que ser em PDF e não em Word. Favor submeter novamente com o PDF. Aurea SRA on 2013-12-16T12:22:37Z (GMT) / Submitted by Patricia Carneiro Leão de Amorim (pclamorim@hotmail.com) on 2013-12-18T04:00:24Z No. of bitstreams: 1 Versão final encaminhada a biblioteca para submissão.com o doc. de aprovação corrigido.em PDF.pdf: 3304592 bytes, checksum: 02d98b0262d97422f18c65d06144ca4d (MD5) / Approved for entry into archive by ÁUREA CORRÊA DA FONSECA CORRÊA DA FONSECA (aurea.fonseca@fgv.br) on 2014-01-28T17:52:56Z (GMT) No. of bitstreams: 1 Versão final encaminhada a biblioteca para submissão.com o doc. de aprovação corrigido.em PDF.pdf: 3304592 bytes, checksum: 02d98b0262d97422f18c65d06144ca4d (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2014-02-03T16:13:42Z (GMT) No. of bitstreams: 1 Versão final encaminhada a biblioteca para submissão.com o doc. de aprovação corrigido.em PDF.pdf: 3304592 bytes, checksum: 02d98b0262d97422f18c65d06144ca4d (MD5) / Made available in DSpace on 2014-02-03T16:13:56Z (GMT). No. of bitstreams: 1 Versão final encaminhada a biblioteca para submissão.com o doc. de aprovação corrigido.em PDF.pdf: 3304592 bytes, checksum: 02d98b0262d97422f18c65d06144ca4d (MD5) Previous issue date: 2012-11-30 / This work investigates the impact of lowest price bids made through the system of electronic reverse auctions, as seen in the performance and execution of continuous contracts negotiated by the Superintendency of Adminstration for the Advocacia Geral da União (AGU) in Pernambuco, Brazil, during the period between 2006 and 2010. The research was based on the premise that contracting lowest price bidders can stimulate a dip in prices offered by other bidders, leading to contracts with extremely low values that negatively affect the performance of services. Such contracts may be rife with problems and reduce the overall life span of continuous contracts. These apparent savings, a result of intense competition characteristic to the bidding manner of reverse auctions, should be questioned. The results of this study confirm this premise, showing that 55% of contracts generated through the electronic bidding system have serious issues, and 31% of these contracts resulted in a unilateral termination for breach of contractual terms. An inverse relationship between the initial savings generated in the bidding and contract expiration time was identified - the greater the difference between the estimated value and that which was negotiated during the bidding process, the shorter the duration of the contract. Therefore, hiring well below the market price generates contracts with short lifespans and many problems. Data analyses indicate a need to relativize the adoption of the reverse auction bidding system and reconsider its implications for continuous, effective services. / O presente trabalho investiga os impactos das licitações do tipo menor preço, realizadas por meio de Pregão eletrônico, no desempenho das execuções dos contratos contínuos, efetivados pela Superintendência de Administração da AGU em Pernambuco - SAD/PE -, no período de 2006 a 2010. Teve como proposição a premissa de que a contratação do tipo menor preço pode, em função de suas próprias características, estimular uma redução excessiva nos preços ofertados pelos licitantes e originar contratações com valores muito baixos que interferem de forma negativa no desempenho da prestação dos serviços, gerando infrações contratuais e diminuindo a vida útil dos contratos contínuos. A aparente economia, consequência da acirrada competição nos leilões invertidos, que caracterizam a modalidade licitatória Pregão, em médio e longo prazo, pode ser questionada. Os resultados confirmaram a proposição, evidenciando um percentual de 55% dos contratos, oriundos de Pregão eletrônico, com infrações e 31%, rescindidos unilateralmente por descumprimento de cláusulas contratuais. Foi identificada uma relação, de força moderada, inversamente proporcional entre a economia inicial gerada na licitação e o tempo de execução dos contratos, sugerindo uma tendência no sentido de que - quanto maior a diferença entre o valor referencia e o contratado na licitação, menor o tempo de execução do contrato, pois, parte das contratações muito abaixo do preço de mercado, geraram contratos com pequena vida útil e com muitas infrações. As análises dos dados apontam para a necessidade de se relativizar a adoção da modalidade licitatória Pregão, repensando-se a sua indicação para serviços continuados

Page generated in 0.1102 seconds