Spelling suggestions: "subject:"most benefit analysis"" "subject:"most enefit analysis""
211 |
Applying usability cost-benefit analysis — explorations in commercial and open source software development contextsRajanen, M. (Mikko) 21 November 2011 (has links)
Abstract
This thesis explores whether usability cost-benefit analysis is helpful when applied to commercial and open source software (OSS) development contexts. First, the thesis examines the differences and commonalities among the existing usability cost-benefit analysis models. The results indicate that there are considerable variations in the usability cost-benefit analysis literature in how the different categories of usability costs and benefits are identified and documented. Second, the thesis examines how well the existing usability cost-benefit considerations fit into practice in closed source software development. The results indicate that there are considerable risks of failure when using usability cost-benefit considerations in the commercial development context, when the inherent costs of usability activities become apparent, concrete, and measurable. Conversely, the potential benefits of better usability remain vague, uncertain, and unconvincing to the management. In order to build better usability cost-benefit models and minimize the potential that the models have unforeseen inherent risks, as outlined in this thesis, researchers should focus strongly on bringing forward the possible benefits of usability instead of focusing on the costs of designing and implementing user interfaces that would be realized in any case, regardless of the usability activities. Third, the thesis identifies the parallels and differences between open source software development and closed source software development in order to identify how usability costs and benefits fit into OSS development. The usability costs and benefits specific to OSS development are reflected in the experiences of bringing usability into the OSS development context. The results indicate that it is possible to fit usability cost-benefit considerations into the OSS development context, even though there are no apparent financial or resource factors to be considered. Furthermore, to fit usability cost-benefit considerations into the OSS development context, the philosophy, principles, hierarchical structure, community structure, and characteristics of OSS development must be considered. Usability cost-benefit considerations that fit into the OSS development context might help convince core developers that usability activities are important and should be integrated into the project roadmap. / Tiivistelmä
Väitöskirjassa tutkitaan käytettävyyden kustannus-hyöty -analyysin soveltamista kaupalliseen ja avoimen lähdekoodin ohjelmistojen (OSS) ohjelmistokehitykseen. Tutkimuksessa tarkastellaan ensin käytettävyyden kustannus-hyöty -analyysimallien eroja ja yhteisiä piirteitä. Tulokset osoittavat käytettävyyden kustannus-hyöty -analyysimalleissa olevan huomattavia eroja siinä, miten eri käytettävyyden kustannuksia ja hyötyjä on tunnistettu. Toiseksi tutkimuksessa tarkastellaan miten hyvin nykyiset käytettävyyden kustannus-hyöty -analyysimallit sopivat käytännössä kaupallisten ohjelmistojen kehittämisessä. Tulokset osoittavat, että on olemassa huomattavia epäonnistumisen riskejä käytettäessä käytettävyyden kustannus-hyötynäkökohtia käytettävyystoimien oikeuttamiseen. Käytettävyyden kustannukset voivat tulla yrityksen johdon näkökulmasta konkreettisiksi ja mitattaviksi, kun taas mahdolliset paremman käytettävyyden hyödyt voivat jäädä epämääräisiksi, epävarmoiksi ja epäuskottaviksi. Parempien käytettävyyden kustannus-hyöty –mallien kehittämiseksi ja odottamattomien riskien minimoimiseksi mallien suunnittelussa tulisi keskittyä erityisesti paremman käytettävyyden tuomiin mahdollisiin etuihin, koska osa kustannuksista toteutuisi joka tapauksessa käytettävyystoimista riippumatta. Kolmanneksi tutkimuksessa tarkastellaan eroja ja yhtäläisyyksiä avoimen lähdekoodin ohjelmistojen kehittämisessä ja kaupallisessa suljetun lähdekoodin ohjelmistojen kehittämisessä, sekä miten käytettävyyden kustannukset ja hyödyt soveltuvat OSS kehityksessä käytettävyystoimien oikeuttamiseen. Käytettävyyden kustannuksia ja hyötyjä OSS -kehityksessä heijastetaan suhteessa kokemuksiin käytettävyystoimista OSS -projekteissa. Tulokset osoittavat, että on mahdollista soveltaa käytettävyyden kustannus-hyöty -näkökulmia OSS kehityksessä, vaikka OSS kehityksessä ei olekaan ilmeisiä huomioitavia taloudellisia tai resurssitekijöitä. Käytettävyyden kustannus-hyöty -näkökulmien soveltaminen OSS kehityksessä edellyttää OSS kehityksen filosofian, periaatteiden, hierarkkisen rakenteen, yhteisön rakenteen sekä OSS kehityksen ominaispiirteiden ottamista huomioon. OSS -kehitykseen paremmin soveltuvien käytettävyyden kustannus-hyöty –näkökulmien avulla voidaan vakuuttaa OSS -projektin pääkehittäjiä ja yhteisöä käytettävyystoimien tärkeydestä ja nämä toimet voidaan saada osaksi projektin ohjelmistokehitystä.
|
212 |
Deep brain stimulation of the subthalamic nucleus in Parkinson's disease:a clinical studyErola, T. (Tuomo) 02 May 2006 (has links)
Abstract
Deep brain stimulation (DBS) of the subthalamic nucleus (STN) has been gaining importance in the treatment of advanced Parkinson's disease. This study was undertaken to evaluate the beneficial effects of bilateral STN stimulation on patient's clinical symptoms and quality of life related to the potential risks and side effects of the treatment.
A consecutive series of 42 patients operated on for Parkinson's disease with STN DBS in Oulu University Hospital were included. A subgroup of these patients was evaluated using the Unified Parkinson's Disease Rating Scale (UPDRS), neuropsychological tests, and Health Related Quality of Life (HRQoL) instruments i.e. the Parkinson's Disease Questionnaire (PDQ-39) and the Finnish version of the Nottingham Health Profile (NHP). The costs of the treatment were calculated from the perspective of the health care provider. The possible effects of bilateral STN-operation on cardiovascular autonomic function were analyzed by measuring various time- and frequency domain indexes as well as non-linear indexes of heart rate variability (HRV) from 24-hour EKG recording before and 12 months after the operation.
This study showed that STN DBS significantly improves the clinical symptoms and HRQoL of parkinsonian patients. The dyskinesia and clinical fluctuation scores were reduced very significantly in the UPDRS IV subscale. The clinical fluctuations were reduced by 53 %. After DBS best motor response (UPDRS III) scores also improved significantly. The HRQoL measured with both instruments improved significantly. Improvement was seen in the PDQ-39 summary index and the subscales of activities of daily living, emotional well-being, stigma and bodily discomfort. Only communication became worse during the follow-up. There was a statistically significant improvement in the score of the subscales of NHP measuring problems with energy, sleep, emotional reactions and social isolation. One patient died from pulmonary embolism and another contracted a late postoperative intracerebral hemorrhage leading to a permanent deterioration of her neurological condition to the bedridden stage. Other complications were much milder.
Clinical improvement and improvement in HRQoL were positively correlated. STN DBS does not influence tonic autonomic cardiovascular regulation. The incremental costs of performing bilateral STN DBS in Finland compared to preoperative medical treatment amounted to an average of 25 591 EUR per patient during the first postoperative year.
The majority of parkinsonian patients experienced significant and long lasting relief in their motor symptoms and an improvement in HRQoL following STN stimulation.
|
213 |
Hodnocení efektivity implementace systému reportingu / Effectivity assessment of the implementation of the reporting systemŘežábek, Martin January 2017 (has links)
Thesis is focused on effectivity assessment of the reporting system of the selected company and the comparison of the former and current reporting solution. This is achieved by the appropriate literature research, creation of the individual assessment model based on the methodology of the analogy from the information systems assessment and based on the experience of the selected company's employees and the experience of the experts in the field of corporate financial management with the focus on the reporting systems. Model is defined by the set of criteria structured into the groups and by the weights assigned to criteria along with the value for each of them. The last phase consists of stepping out of the individual assessment and defines the generally applicable model, usable on the wide range of different reporting systems.
|
214 |
An economic impact assessment of toll roads, with specific reference to the impact on alternative roads between the Pumulani and Hammanskraal toll gatesKekana, R.D. (Robert Dipitseng) 17 April 2007 (has links)
The erection of tollgates along the N1 freeway has triggered a great deal of interest. As a result of the toll fees, traffic has been diverted to alternative roads. This study investigates how traffic diverted from the toll road affect the welfare of users of the alternative road. The literature review provides a theoretical framework of economic impact assessment and road pricing. Furthermore, the literature study reviews previous studies of a similar nature and compare them with the findings of this study. There is no conclusive evidence that diversion of traffic from the N1 causes congestion on the R101 and has a negative impact on the economy of the region. On the contrary, evidence suggests that there was an initial diversion of traffic when the toll came into operation but that is slowly filtered back after six months. In the application of the RED model, economic benefits are derived from user benefits, which is a function of savings in VOC’s and time of normal and generated traffic on a road or saving due to an improvement in road safety, resulting from improved roads. A decrease in traffic has a measurable effect on vehicle travel speeds and travel time only when the roads are significantly congested. In the case of scenario 1 (including diversion), frequent maintenance needs to be performed under increased traffic. Increased traffic due to “diverted traffic” causes congestion in accidents and travelling time, which is a cost to the economy. Under scenario 2 (excluding diversion), it is assumed that ADT will return to normal. Due to lower levels of congestion and travelling times would be faster, while maintenance costs and accident rates would decrease. Scenario 2 is selected as being economically the most feasible option. It is clear that the R101 cannot cope with the current levels of traffic and congestion. One can speculate about the causes of the congestion but in order to derive at a solution to the problem more research needs to be done on the cause of the congestion in order to resolve the problem. / Dissertation (Magister Commercii)--University of Pretoria, 2007. / Economics / unrestricted
|
215 |
Metody ocenění a hodnocení IT investic / Methods for IT investment evaluation and decision makingMizera, Jiří January 2009 (has links)
The aim of the final thesis Methods for IT investment evaluation and decision making is to verify relationship between strategy of the company its Enterprise Architecture and IT investments evaluation. To achieve the aim of the thesis is necessary to define the term of Enterprise Architecture and its relationship with IT Project Portfolio Management. The literature retrieval which follows after is focused on calculation of IT investment profitability and return. The calculation is very difficult due to intangible benefits which are one of the common goals of IT investments. The customer satisfaction, improve of the current business process or employees satisfaction are one of the examples of the intangible benefits. Cost/Benefit analysis is one of the methods depicted for calculation of the intangible benefits. Methods for decision support as Analytic Hierarchy Process are highlighted as the significant instrument. The risk analysis and simulation of the risk in IT investments decision making are also mentioned but according to the scope of thesis just very briefly. Major methods are used on the model example of the evaluation and decision making process to demonstrate the whole theoretical part of the thesis. The biggest added value of the final thesis is the deep analysis of the relationship between strategy of the company its Enterprise Architecture and IT investment evaluation. Entire final thesis should be used as the fundament for IT investment evaluation and decision making framework.
|
216 |
Cost - benefit analýza mistrovství světa v biatlonu 2013 / Cost - benefit analysis of Biathlon World Championships 2013Pavouková, Adéla January 2013 (has links)
This thesis covers the implementation of ex post cost-benefit analysis (CBA) applied to specific sport event in the Czech Republic, specifically Biathlon World Championships, which was held in Nové Město na Moravě in 2013. The results of determinative criterion indicators reliably exceeded the required values, investment project can be considered as economically feasible. Concurrently the event has generated positive cash flow therefore we can talk about the feasibility of the project. Overall, the project can be recommended for realization, because brings more benefits than costs to interested parties.
|
217 |
Analýza dopadů nedostatku míst v mateřských školách na daňové příjmy ČR / Impacts of shortage of places in kindergarten in the Czech Republic´s tax revenuesKrejsová, Kateřina January 2011 (has links)
The thesis focuses on impacts of shortage of places in kindergarten in the Czech Republic's tax revenues due to reduced participation of women in labor market. Within the work is described the situation on imaginary kindergarten market. The supply side is made of kindergartens and the demand side is made of children between age 3 and 6 and their parents. Comparasion of cost expended on establishing new positions in kinderkarten with tax revenue is illustrated by cost benefit analysis. The goal of cost benefit analysis in this work is to prove or disprove expediency hypothesis of establishing new positions in kindergartens in comparison with total lost tax revenue.
|
218 |
Kostnad-/nyttoanalys av bergtekniska förundersökningar med statistisk datavärdesanalysLiljekvist, Markus, Andersson, Daniel January 2020 (has links)
Många infrastrukturprojekt involverar byggnation i berg där det alltid finns osäkerheter att hantera, dessa kan minskas genom att utföra fler undersökningar. Eftersom förundersökningar i berg är relativt dyra gäller det att hitta en balans där fältprogrammet är ekonomiskt försvarbart. Ett området som studerats det senaste åren är att utreda kostnadsnyttan som förundersökningarna tillför. Metoden som har utvecklats kallas datavärdesanalys och används för att kunna bedöma kostnadsnyttan av att utföra ytterligare förundersökningar innan de är utförda. Syfte med studien är att utvärdera kostnadsnyttan av ytterligare förundersökningar för en injekterings- och bergförstärkningsdesign i ett riktigt bergbyggnadsprojekt. Detta kommer att göras med en utvecklad statistisk metod av datavärdesanalysen. Förväntade resultat från studien var: Undersöka hur insamlad data från tidigare förundersökningar i projektet kan användas för att bedöma sannolikheterna i datavärdesanalysen. Utveckla datavärdesanalysen för att vara tillämpbar i ett bergbyggnadsprojekt. Testa metoden i ett byggprojekt med riktig data och kostnader. Utvärdera om den framtagna metoden är tillämpbar i ett bergbyggnadsprojekt. I studien upprättades först två olika typdesigner för injekteringen och bergförstärkningen, baserat på en begränsad mängd data som fanns tillgänglig för en utvald sektion (fall 1). Mängden data som var tillgänglig i fall 1 är liknande som i en förstudie. Sedan upprättades två nya typdesigner för vardera område där kompletterande information från högkvalitativ data från kärnborrhål, hammarborrhål och vattenförlustmätning adderades (fall 2). Sannolikheterna i datavärdesanalysen bedömdes genom att använda en statistik metod. Den statistiska metoden baserades på en monte carlo simulering där stupningen på brottet antogs variera för bergförstärkningen och konduktiviteten antogs variera för injekteringen. Studien påvisade goda resultat för att datavärdesanalyser skulle kunna implementeras i projekt som ett beslutsunderlag. Problematiken som kan uppstå i projekt där man har olika åsikter om hur mycket förundersökningar som behövs skulle kunna elimineras genom att använda datavärdesanalyser på den tillgängliga informationen samt nyttan av mer information. Detta är viktigt ur ett samhällsekonomiskt perspektiv. Det är dock viktigt att personen som använder verktyget förstår hur metoden är uppbyggd och dess antaganden. Gör man inte det finns det stor risk att beslut fattas på grund av felaktigheter som kan finnas i både indata och misstolkad utdata. Vidare rekommenderas att metoden utvecklas innan den används i ett riktigt projekt. Exempel på detta kan vara att göra mindre antaganden. Det kan också vara att försöka koppla datavärdesanalysen till var man har utfört undersökningen på sträckan man studerar. Man skulle även kunna inkludera fler parametrar i sin monte carlo simulering. Slutligen kan man, för att göra metoden mer användarvänlig, skapa en bättre plattform som den kan användas på. / Many infrastructure projects involve construction in rock, where there are a lot of uncertainties to deal with. These uncertainties can be reduced by performing preliminary investigations. Since preliminary investigations are expensive, it is necessary to find a balance where the field program is financially justifiable. In recent years cost-benefit analysis has been studied to investigate the benefits that preliminary investigations add. The method that has been developed is called value of information analysis and it assesses the cost-benefit of doing more investigations before they are performed. The purpose of this report is to evaluate the benefits of additional preliminary investigations in a real project that could improve the grouting and rock support designs. The studied method is VOIA (Value of Information Analysis) based on statistical probabilities. The expected result of the study was: Investigate how collected data from preliminary investigations can be used to determine the probabilities used in the VOIA concept based on statistics. Develop a VOIA concept that is based on statistics and can be applied in a real project. Test the concept in a real project with real data and costs. Evaluate however the statistical approach was suitable to be applied in a real project. First part of the study consists of establishing two basic designs for grouting and rock support, that is based on a limited amount of information for a certain section of the project (case 1). The data available in case 1 is similar to a desk study. For the second part of the study the previous designs were updated and adjusted according to the additional information, from high quality investigations such as core drilling and water pressure test (case 2). The probabilities in the value of information analysis were evaluated using a statistical approach. The method was based on a monte carlo simulation where the dip of the plane was assumed to vary for the reinforcement design. For the grouting design the conductivity was assumed to vary. Conclusions from this report proves that a statistical approach for the VOIA concept has great possibilities of being applied in projects as a tool before making decisions regarding preliminary investigations. The problem that often occur in projects today concerning different opinions about the amount of investigations needed, could be eliminated if a well constructed statistical model can be used that has the possibility of adjusting to the amount of available data. This would be beneficial from a socioeconomic perspective. However it's important that the user of this approach understand the purpose of every assumption and understands how to interpret the output data. Otherwise, decisions can be based on errors made by assumptions or bad input data. Furthermore, recommendations is presented in this report regarding some areas that need to be developed before it is suitable to apply the method in a real project. One is to construct the VOIA concept based on fewer assumptions. Another is to connect the VOIA method to the geographical point of where the investigations have been made. There is also a possibility to include more parameters in the monte carlo simulation. Finally, to construct a more applicable tool in a project, a user friendly platform to conduct the analysis from is a great area to develop.
|
219 |
Engineering and Financial Analysis of a Wastewater Pant UpgradeMeher Rusi Taleyarkhan (8790857) 01 May 2020 (has links)
<p>Municipal wastewater treatment plants treat wastewater such as domestic and industrial sewage and recirculates the clean water back into nature’s waterways. However, the wastewater treatment process is costly and complex. The cost of running a municipal wastewater treatment plant is funded via ratepayer fee dollars from customers and therefore receives a fixed budget for which to run the plant according to environmental standards. A local initiative was established to upgrade a Midwestern municipal wastewater facility to utilize biomass renewable energy to a greater extent than what is used by the wastewater facility. The first phase of the initiative tested the suitability of utilizing organic substrates from local industrial plants with the potential to produce larger amounts of biogas via anaerobic digestion. The analysis evaluated the technical and financial viability of utilizing biomass technologies to help power the facility efficiently and economically. The financial and technical analysis will include a cost-benefit analysis by comparing current and forecasted natural gas demand and costs for running heating the WWTP to biogas produced by the anerobic digesters. The results of the research study found that the industrial waste substrates are suitable for anaerobic digestion and yield a higher biogas potential than what is currently used for anaerobic digestion by the WWTP. The initial financial analysis found it is feasible and economical, for at least certain months of the year, for the WWTP to refrain from purchasing natural gas and instead utilize the produced biogas.</p>
|
220 |
An environmental evaluation methodology for improving resource allocation decisions : a treatise with selected South African case studiesStauth, Roy Bryan January 1989 (has links)
This dissertation addresses the problem of how to manage environmental resources to improve the prospects that resource allocation activities will make the greatest possible contribution to social well-being. The study had two major aims. One aim was to provide a rational philosophical framework for guiding resource evaluation and decisionmaking processes. The second - and principal - aim was to develop a reliable and practical method for evaluating those resource allocation proposals which are particularly controversial. As part of the philosophical framework, a modification of the social welfare function is specified which explicitly addresses the well-being of future generations. This form of the social welfare function is based on certain a priori premises, which are used to define the goal and objectives of resource allocation, and to identify appropriate evaluation criteria. These evaluation criteria are then used to devise a resource management strategy and to develop an environmental evaluation methodology to serve that strategy. The methodology consists of both formal and informal methods of evaluation, but special attention is given to developing a formal method of evaluation that is simple and inexpensive to apply, and therefore particularly suited for Third World conditions. The principal research objective was to develop a useful method for evaluating those resource allocation proposals which are especially controversial. The method that has been developed - the Panel Evaluation Method - utilizes a cost-benefit framework and employs procedures modeled on the Delphi Method. The Panel Evaluation Method features three techniques for accomplishing a formal evaluation of competing proposals: the Impact Identification Technique is used to identify and define all the impacts of concern; the Significance Measurement Technique is used to judge the relative significance of the impacts; and the Criteria Trade-off Technique is used to determine which proposal best satisfies specified evaluation criteria. The Panel Evaluation Method was applied to several case studies with positive results. For example, the central feature of the method - the Significance Measurement Technique - was found to be capable of producing reasonably replicable results, and so is considered to provide an acceptable way to determine whether the costs of a proposal would exceed its benefits. The method thus serves to extend the capabilities of both Environmental Impact Assessment and Cost-benefit Analysis, and to link these two widely-used tools for guiding resource allocation decisions into a more powerful and versatile decisionmaking tool.
|
Page generated in 0.0709 seconds