• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 5
  • 5
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

INTERNATIONAL DIVERSIFICATION: EFFECTS ON COST RIGIDITY AND INVESTMENT CHARACTERISTICS

Kangogo, Nancy 04 May 2022 (has links)
No description available.
2

LIVSCYKELKOSTNAD (LCC) : En jämförelse mellan en tvärspänd plattbro i limträ och en samverkansbro / LIFE CYCLE COST (LCC) : A comparison between a prestressed glulam deck bridge and a composite bridge

El Ladki, Inaya, Gümüs, Leylafer January 2018 (has links)
This essay is a bachelor thesis written for the Degree Program in Constructional Engineering and Design at The Royal Institute of Technology (KTH). This thesis was an assignment given by WSP Sweden and their bridge and water department. The purpose of this report is to conduct an examination on the Life Cycle Cost (LCC) on a prestressed glulam deck bridge and a composite bridge in the early stages of the design phase. This report illuminates the factors that are most crucial in a LCC-calculation for the selected overpasses, and provides an overview regarding which overpass is most efficient from an economic standpoint. The LCC has been calculated based on an 80-year lifespan for the prestressed glulam deck bridge and a 120-year lifespan for the composite bridge. The cost of investment, operating, maintaining and finally the demolition cost was all considered as well. The bridge works that were examined are real life projects in an early stage of the design phase with plans to be built. In the results, the LCC-analysis shows a clear difference in life cycle costs between the prestressed glulam deck bridge and the composite bridge and show that the cost of investment is the most decisive cost during the bridges’ lifespans. The LCC-calculations show that the total life cycle cost for a prestressed glulam deck bridge is higher than the composite bridges’ total life cycle cost.
3

Unapređenje efikasnosti proizvodnih procesa razvojem proširenog modela toka vrednosti / Improving manufacturing efficiency by developing expanded value stream model

Gračanin Danijela 24 October 2014 (has links)
<p>U okviru disertacije se ispituje uticaj akumulacije troškova u vremenu na izbor odgovarajućih mera za unapređenje i povećanje efikasnosti proizvodnih procesa. Ovaj uticaj je stavljen u kontekst lin proizvodnje i procesa mapiranja toka vrednosti, ali je ispitivan i uticaj izbora pravila raspoređivanja radnih naloga, odnosno terminskog planiranja na vremensko-troškovno ulaganje. Kao rezultat istraživanja i originalan naučni doprinos ove disertacije predloženi su koeficijenti ulaganja i efikasnosti mera unapređenja koji se koriste, na prvom mestu za izbor odgovarajuće mere unapređenja, a zatim i za definisanje prioriteta sprovođenja mera.</p> / <p>This dissertation examines the impact of the cost accumulation over the time on the selection of appropriate measures to improve and increase the efficiency of production processes. This effect has been put into the context of lean production and value stream mapping, but there is also examines the impact of job shop schenduling on cost-time investment. As a result of research and original scientific contribution of this thesis two coefficients are proposed: coefficient of investment and coefficient of measure efficiency that can be used in the first place for the selection of appropriate measure for the improvement, and then to define the priorities for implementing the improvement measures.</p>
4

Investiční doporučení pro fond kvalifikovaných investorů v oblasti investic do drahých kovů / Investment Recommendation for a Fund of Qualified Investors in the Field of Investments in Precious Metals.

Rozsypal, Tomáš January 2021 (has links)
Precious metal - gold, is perceived as a safety and is used to secure investment at the time of nervousness in the global market. However, the only small part is usually inset into world funds. Qualified (hedge) funds can be managed completely differently. Diploma thesis solves which way and how the qualified investor funds can include the gold into portfolio. The work takes all instruments on gold suitable for investing and analyzes their basic characteristics and differences.
5

Hodnocení investičního záměru výstavby mateřské školy / Evaluation of Investment Plan of Kindergarten Construction

Janusová, Barbora Unknown Date (has links)
The diploma thesis focuses on the evaluation of investment plan for the kindergarten construction, what is a public investment project. The first part of the thesis is the theoretical part, which discusses the theoretical basis of investments, investment plan, investment and public projects, investment decision - making and strategic planning. The theory part also describes the feasibility study and methods of project evaluation. Within the methods of project evaluation, the thesis deals with the Cost – Benefit analysis. The practical part of the thesis evaluates the investment plan named “Nástavba a přístavba mateřské školy Elišky Krásnohorské 15, Brno “, where is also performed the sensitivity analysis and qualitative risk analysis. The evaluation of investment plan for the kindergarten construction is performed in the eCBA application.

Page generated in 0.0793 seconds