• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Método de carga para banco de baterias em fontes ininterruptas de energia que busca garantir o estado de carga completa: corrente pulsada modificado / Charge method to bank of batteries for uninterruptible power supplies search to ensure the state of full load: pulsed current modified

Cardoso, Renato Tavares 15 February 2015 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This Master s Dissertation is proposes the development of a charge management system of a bank of 16 lead-acid batteries with 7Ah load capacity, commonly used in Uninterruptible Power Supplies (UPS). This system aims to ensure that these batteries reach a full charge status faster than the conventional way. To this, it was chosen to make the modification of the pulsed current charging method, in order to reduce problems, such as elevation of bus voltage to return the energy to it, or dissipation of that energy in a resistance, resulting in lower system efficiency, inherent in the method taken as a basis when the battery power withdrawal interval occurs. For the development of the suggested charging system the static converter Full-Bridge Isolated with modulation Phase Shift was chosen. To implement the digital control as well as its practical development in the same laboratory the simplified modeling of this converter was made. The results of simulation and experimental to validate the method are presented. / Esta dissertação de mestrado tem como proposta o desenvolvimento de um sistema de gerenciamento de carga de um banco de 16 baterias de chumbo ácido, com capacidade de carga de 7Ah, comumente utilizado em Fontes Ininterruptas de Energia (UPS). Este sistema visa garantir que estas baterias cheguem a um estado de carga completo e de forma mais rápida que a convencional. Para isto, foi escolhido fazer a modificação do método de carga de corrente pulsada, com o objetivo de reduzir problemas inerentes do método tomado como base, quando ocorre o intervalo de retirada de energia da bateria, tais como: elevação da tensão do barramento ao retornar a energia para ele, ou, dissipar esta energia em uma resistência, o que acarreta em baixa eficiência do sistema. Para o desenvolvimento do sistema de carga sugerido foi escolhido o conversor estático Full-Bridge Isolado com modulação Phase Shift. Foi feita a modelagem simplificada deste conversor, para a implementação do controle digital, assim como o desenvolvimento prático do mesmo em laboratório. São apresentados os resultados de simulação e experimentais para validar o método.

Page generated in 0.1136 seconds