• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 1
  • 1
  • Tagged with
  • 6
  • 6
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A Rule-Based Predictive Model for Estimating Human Impact Data in Natural Onset Disasters - The Case of PRED Model

Rye, Sara, Aktas, E. 17 May 2023 (has links)
Yes / This paper proposes a framework to cope with the lack of data at the time of a disaster by em-ploying predictive models. The framework can be used for disaster human impact assessment based on the socio-economic characteristics of the affected countries. A panel data of 4252 natural onset disasters between 1980 to 2020 is processed through concept drift phenomenon and rule-based classifiers, namely Moving Average (MA). A Predictive model for Estimating Data (PRED) is developed as a decision-making platform based on the Disaster Severity Analysis (DSA) Technique. A comparison with the real data shows that the platform can predict the human impact of a disaster (fatality, injured, homeless) up to 3% errors; thus, it is able to inform the selection of disaster relief partners for various disaster scenarios.
2

Influência da incerteza no processo de decisão: priorização de projetos de melhoria. / Influence of uncertaities in the decision process: priorization of improvement projects.

Coitinho, Marcos 18 December 2006 (has links)
Este trabalho descreve um experimento sobre o processo de decisão para priorização de projetos de melhoria em uma indústria de bens de capital. Apenas dois critérios eram aplicados na tarefa de priorizar projetos; exigências legais e complexidade técnica, então, foi proposto avaliar os projetos através de um conjunto mais amplo de critérios, incluindo imagem da marca, participação de mercado, alinhamento estratégico, tempo de lançamento de um novo produto. Para lidar com um número maior de critérios qualitativos e quantitativos, foi introduzido desde então, dois métodos multicritérios, a saber: o uso do AHP (analytical hierarchic process) e o DS-AHP (Dempster-Shafer /AHP). Os fundamentos teóricos dos dois métodos são apresentados. O primeiro método é usado para determinar as importâncias relativas das alternativas, por meio de ponderações em cada nível da estrutura hierárquica; a qualidade dos julgamentos é avaliada por um \"índice de consistência\". O segundo método também utiliza a plataforma de análise do AHP acrescentado mensuração da ignorância no processo de julgamentos por meio de probabilidades subjetivas. São comentadas as aplicações dos métodos em uma específica indústria. Foram observadas objeções dos decisores à aplicação do processo AHP, decorrentes da necessidade de numerosas re-avaliações dos julgamentos, quando o \"índice de consistência\" apresentava-se maior que os valores recomendados. Como ponto positivo foi destacada a simplicidade do método para aplicações no ambiente empresarial. Quanto ao método DS-AHP, o uso do conceito de crença nos julgamentos dos decisores, permitiu melhores aproximações às situações reais; neste caso, a alternativa eleita pôde ser claramente compreendida como a mais provável, e não classificada como provavelmente ou certamente a melhor. O DS-AHP quandocomparado ao AHP apresenta-se como um ferramental de condução mais direta para a obtenção dos resultados principalmente no que se refere ao menor número de comparações exigidas, também ajuda o decisor a identificar e corrigir as possíveis fontes de ignorância, que podem afetar a qualidade da decisão. / This study describes an experiment about the definition of portfolio of improvement projects in an industry of capital goods, which had until recently been prioritized based mainly on legislation demand and technical complexity. It was proposed to increase the criteria numbers including: market image, market share, strategic alignment, launch time to new products. To handle several criteria with focus quantitative and qualitative aspects was necessary introduced two multcriterial methods, namely, analytical hierarchic process (AHP) and Dempster-Shafer AHP process (DS-AHP). The first referred method is used to manage the relative importance of alternatives regarding the fore mentioned criteria based on weights attributed to structure hierarchical levels. The second referred method also uses AHP platform to enable ignorance measurement based on subjective probabilities. Results from direct application of the methods in this specific industry are commented. It was observed that the decision makers have some objections with respect to the AHP process, in the sense that there were judgment inconsistencies which required additional evaluation of the candidate solutions, what was seen as somewhat tiresome. The main advantages which was emphasize by decision makers refers to the ease of application in corporate environmental . As for the DS - AHP process, the possibility of considering believes in a structured way was felt as more appropriated to the real decision process, which effectively involves uncertainties. In this way, the elected alternative can be clearly understood as most probably - and not certainly - the best. Also the DS-AHP process was seen as more directly conducive to the final results in comparison with the AHP process.
3

Influência da incerteza no processo de decisão: priorização de projetos de melhoria. / Influence of uncertaities in the decision process: priorization of improvement projects.

Marcos Coitinho 18 December 2006 (has links)
Este trabalho descreve um experimento sobre o processo de decisão para priorização de projetos de melhoria em uma indústria de bens de capital. Apenas dois critérios eram aplicados na tarefa de priorizar projetos; exigências legais e complexidade técnica, então, foi proposto avaliar os projetos através de um conjunto mais amplo de critérios, incluindo imagem da marca, participação de mercado, alinhamento estratégico, tempo de lançamento de um novo produto. Para lidar com um número maior de critérios qualitativos e quantitativos, foi introduzido desde então, dois métodos multicritérios, a saber: o uso do AHP (analytical hierarchic process) e o DS-AHP (Dempster-Shafer /AHP). Os fundamentos teóricos dos dois métodos são apresentados. O primeiro método é usado para determinar as importâncias relativas das alternativas, por meio de ponderações em cada nível da estrutura hierárquica; a qualidade dos julgamentos é avaliada por um \"índice de consistência\". O segundo método também utiliza a plataforma de análise do AHP acrescentado mensuração da ignorância no processo de julgamentos por meio de probabilidades subjetivas. São comentadas as aplicações dos métodos em uma específica indústria. Foram observadas objeções dos decisores à aplicação do processo AHP, decorrentes da necessidade de numerosas re-avaliações dos julgamentos, quando o \"índice de consistência\" apresentava-se maior que os valores recomendados. Como ponto positivo foi destacada a simplicidade do método para aplicações no ambiente empresarial. Quanto ao método DS-AHP, o uso do conceito de crença nos julgamentos dos decisores, permitiu melhores aproximações às situações reais; neste caso, a alternativa eleita pôde ser claramente compreendida como a mais provável, e não classificada como provavelmente ou certamente a melhor. O DS-AHP quandocomparado ao AHP apresenta-se como um ferramental de condução mais direta para a obtenção dos resultados principalmente no que se refere ao menor número de comparações exigidas, também ajuda o decisor a identificar e corrigir as possíveis fontes de ignorância, que podem afetar a qualidade da decisão. / This study describes an experiment about the definition of portfolio of improvement projects in an industry of capital goods, which had until recently been prioritized based mainly on legislation demand and technical complexity. It was proposed to increase the criteria numbers including: market image, market share, strategic alignment, launch time to new products. To handle several criteria with focus quantitative and qualitative aspects was necessary introduced two multcriterial methods, namely, analytical hierarchic process (AHP) and Dempster-Shafer AHP process (DS-AHP). The first referred method is used to manage the relative importance of alternatives regarding the fore mentioned criteria based on weights attributed to structure hierarchical levels. The second referred method also uses AHP platform to enable ignorance measurement based on subjective probabilities. Results from direct application of the methods in this specific industry are commented. It was observed that the decision makers have some objections with respect to the AHP process, in the sense that there were judgment inconsistencies which required additional evaluation of the candidate solutions, what was seen as somewhat tiresome. The main advantages which was emphasize by decision makers refers to the ease of application in corporate environmental . As for the DS - AHP process, the possibility of considering believes in a structured way was felt as more appropriated to the real decision process, which effectively involves uncertainties. In this way, the elected alternative can be clearly understood as most probably - and not certainly - the best. Also the DS-AHP process was seen as more directly conducive to the final results in comparison with the AHP process.
4

Estruturas flutuantes para a exploração de campos de petróleo no mar(FPSO): apoio à decisão na escolha do sistema. / Decision aid methods applied to the selection of floating production storage and offloading system.

Garber, Marcos Fernando 17 December 2002 (has links)
Freqüentemente os profissionais da construção naval tomam decisões para selecionar os elementos que devem ser especificados na composição de determinado projeto. Além da experiência e do conhecimento necessários para optar por um caminho adequado, a escolha deve atender eficientemente ao problema proposto e às preferências do projetista. A seleção de componentes do projeto de estruturas flutuantes para exploração de campos de petróleo no mar envolve aspectos objetivos e subjetivos. O trabalho apresenta e aplica alguns métodos de auxílio à tomada de decisão possibilitando ao projetista aprimorar sua sensibilidade. O objetivo da pesquisa é apresentar de forma sumária as duas bases para a decisão sobre o projeto, que são os métodos de apoio e os requisitos que as instalações FPSO devem atender, fornecendo como resultado um procedimento que permitirá aos usuários a melhor escolha dos componentes e aumentar a sensibilidade dos projetistas na seleção entre as possíveis opções (fazer totalmente novo ou aproveitar o existente). O trabalho apresenta uma revisão dos princípios da análise da decisão, informações sobre métodos de apoio à decisão, os dados de entrada do problema proposto, o método de projetos navais, os requisitos básicos para construção de estruturas flutuantes de exploração de petróleo no mar e os requisitos básicos para uma instalação FPSO. Para a solução do problema se aplicaram os métodos de árvore de decisão, para a parte correspondente às decisões sob risco e o método de análise hierárquica AHP para as decisões tomadas sob certeza. / Frequently, naval construction engineers take decisions to select the elements which must specified for the composition of a determined project. Besides the necessary experience and the knowledge to choose a proper way, the option must fulfil efficiently the problem requirements and the preferences of the designer. The choice of components in the design off-shore structures for production in sea oilfields, involves objective and subjective aspects. This work introduces and uses a few methods of decision aids, helping the designer to improve his sensibility. The objective of this research is to present in a simple way two foundations to decide about the project, which are the aid decision methods and the requirements which the FPSO (Floating Production Storage and Offloading System) must fulfil, supplying a procedure that enables the designer to take the best choice of components and to increase his sensibility referring to the selection among the possible options, wich are to make a completely new FPSO or to use an existing one. This work offers a revision of the principles of the decision analysis theory, the data input of the problem, the classic naval design method, the basic requirements to build floating structures to off-shore oil extraction, and the basic requirements for a FPSO installation. To solve the problem the decision tree method, for decision under risk, and the AHP (Analytic Hierarchy Process), for decision under certainty, were applied.
5

Estruturas flutuantes para a exploração de campos de petróleo no mar(FPSO): apoio à decisão na escolha do sistema. / Decision aid methods applied to the selection of floating production storage and offloading system.

Marcos Fernando Garber 17 December 2002 (has links)
Freqüentemente os profissionais da construção naval tomam decisões para selecionar os elementos que devem ser especificados na composição de determinado projeto. Além da experiência e do conhecimento necessários para optar por um caminho adequado, a escolha deve atender eficientemente ao problema proposto e às preferências do projetista. A seleção de componentes do projeto de estruturas flutuantes para exploração de campos de petróleo no mar envolve aspectos objetivos e subjetivos. O trabalho apresenta e aplica alguns métodos de auxílio à tomada de decisão possibilitando ao projetista aprimorar sua sensibilidade. O objetivo da pesquisa é apresentar de forma sumária as duas bases para a decisão sobre o projeto, que são os métodos de apoio e os requisitos que as instalações FPSO devem atender, fornecendo como resultado um procedimento que permitirá aos usuários a melhor escolha dos componentes e aumentar a sensibilidade dos projetistas na seleção entre as possíveis opções (fazer totalmente novo ou aproveitar o existente). O trabalho apresenta uma revisão dos princípios da análise da decisão, informações sobre métodos de apoio à decisão, os dados de entrada do problema proposto, o método de projetos navais, os requisitos básicos para construção de estruturas flutuantes de exploração de petróleo no mar e os requisitos básicos para uma instalação FPSO. Para a solução do problema se aplicaram os métodos de árvore de decisão, para a parte correspondente às decisões sob risco e o método de análise hierárquica AHP para as decisões tomadas sob certeza. / Frequently, naval construction engineers take decisions to select the elements which must specified for the composition of a determined project. Besides the necessary experience and the knowledge to choose a proper way, the option must fulfil efficiently the problem requirements and the preferences of the designer. The choice of components in the design off-shore structures for production in sea oilfields, involves objective and subjective aspects. This work introduces and uses a few methods of decision aids, helping the designer to improve his sensibility. The objective of this research is to present in a simple way two foundations to decide about the project, which are the aid decision methods and the requirements which the FPSO (Floating Production Storage and Offloading System) must fulfil, supplying a procedure that enables the designer to take the best choice of components and to increase his sensibility referring to the selection among the possible options, wich are to make a completely new FPSO or to use an existing one. This work offers a revision of the principles of the decision analysis theory, the data input of the problem, the classic naval design method, the basic requirements to build floating structures to off-shore oil extraction, and the basic requirements for a FPSO installation. To solve the problem the decision tree method, for decision under risk, and the AHP (Analytic Hierarchy Process), for decision under certainty, were applied.
6

Zhodnocení ekonomické efektivnosti investičního záměru podniku / Capital Investment Analysis and Project Assessment

Veselý, Jakub January 2012 (has links)
The main goal of my master thesis is evaluation an investment project of company on the base of dynamic methods of investment evaluation. Methods of evaluation are net present value, payoff period, gross investment, profitability index and internal rate of return.

Page generated in 0.092 seconds