Spelling suggestions: "subject:"despacho dde AGVs"" "subject:"despacho dee AGVs""
1 |
Modelo fuzzy cascata multiatributos e preditivo para despacho de AGVs em FMSCaridá, Vinicius Fernandes 02 May 2016 (has links)
Submitted by Izabel Franco (izabel-franco@ufscar.br) on 2016-10-05T12:59:30Z
No. of bitstreams: 1
TeseVFC.pdf: 9165002 bytes, checksum: bb98f82058344c51fda9b34979b8a524 (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-10-20T18:15:16Z (GMT) No. of bitstreams: 1
TeseVFC.pdf: 9165002 bytes, checksum: bb98f82058344c51fda9b34979b8a524 (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-10-20T18:15:22Z (GMT) No. of bitstreams: 1
TeseVFC.pdf: 9165002 bytes, checksum: bb98f82058344c51fda9b34979b8a524 (MD5) / Made available in DSpace on 2016-10-20T18:15:28Z (GMT). No. of bitstreams: 1
TeseVFC.pdf: 9165002 bytes, checksum: bb98f82058344c51fda9b34979b8a524 (MD5)
Previous issue date: 2016-05-02 / In recent years, manufacturers are increasingly applying automation techniques with the aim of
increase their efficiency to remain competitive. The material handling is an essential activity in any process of production and its effectiveness has severe impacts on production costs. Systems of automated guided vehicles (AGVs) have become an important strategic tool for factories and automated warehouses. In a very competitive business scenario, they can increase productivity and reduce costs. The management of these AGVs is the key to a transport system that ensures the improvements envisioned by the industry. One of the main problems encountered in the management of AGVs is the dispatch decision. This paper proposes a vehicles dispatch model based on a fuzzy cascade system for consideration of multiple attributes of the factory and a structure based on state space that enables the extraction of information of future states of the industrial production system.
The objective is to reduce makespan and tardiness values of the production system. Two factory scenarios are simulated and tests are performed of the model and five other methods of dispatch. A statistical validation is realized of the results in which corroborates with 97% confidence the hypotheses of the work. / Nos últimos anos, as indústrias vêm cada vez mais aplicando técnicas de automação com o objetivo de aumentar sua eficiência para manterem-se competitivas. O manuseio de materiais é uma atividade essencial em qualquer processo de produção e sua eficácia tem impactos severos sobre os custos de produção. Sistemas de veículos autoguiados (AGVs) tornaram-se uma ferramenta estratégica
importante para fábricas e armazéns automatizados. Em um cenário de negócio muito competitivo, eles podem aumentar a produtividade e reduzir os custos. O gerenciamento desses AGVs é a chave
para um sistema de transporte que garanta as melhorias vislumbradas pelas indústrias. Um dos
principais problemas encontrados no gerenciamento dos AGVs é a decisão de despacho. Esse trabalho propõe um modelo de despacho de veículos baseado em um sistema fuzzy cascata para ponderação de múltiplos atributos da fábrica e em uma estrutura baseada em espaço de estados que permita a extração de informações de estados futuros do sistema de produção fabril. O objetivo é reduzir valores de makespan e tardiness do sistema de produção. Dois cenários de fábrica são simulados e são realizados testes do modelo proposto e cinco outros métodos de despachos. É realizada uma validação estatística dos resultados em que se corrobora com 97% de confiança as hipóteses do trabalho
|
2 |
Modelo adaptativo fuzzy genético, preditivo e multiobjetivo para despacho de AGVsCaridá, Vinicius Fernandes 14 June 2011 (has links)
Made available in DSpace on 2016-06-02T19:05:50Z (GMT). No. of bitstreams: 1
3678.pdf: 5394148 bytes, checksum: 4abd3e7ce4acac9d5890eae3620c06d3 (MD5)
Previous issue date: 2011-06-14 / Financiadora de Estudos e Projetos / In recent years, most companies apply techniques of industrial automation with the goal of increasing its efficiency. Increasingly Automated Guided Vehicles (AGVs) are used to transport work in factories and warehouses. The management of these AGV is the key to an efficient transport system. One of the main problems encountered in the management of AGV is the dispatching decision. This work proposes a method of dispatching of AGV with the ability to optimize the performance of flexible manufacturing systems (FMS) in real time. In the dispatching deciding can be chosen to optimize two objectives: makespan or tardiness. When the goal is to optimize the makespan are evaluated variables: distance, number of nodes, the input buffer and output buffer of the workstation. When the goal is to optimize the tardiness are evaluated variables: distance, number of nodes, task chaining, date of delivery. In both cases are also considered the time of the AGVs and the processing times of the workstations, so you can anticipate some decision-making. To perform the tests we used the softwares: Matlab, CPNtools and Automod, which allow simulations of how the method works dispatching AGVs before the method is implemented in factories. Based on the tests, we analyzed the improvement in makespan and tardiness compared to other studies, but also the flexibility of the method in which it is possible to exchange goals in operating time. / Nos últimos anos, mais empresas aplicam técnicas de automação industrial com o objetivo de aumentar sua eficiência. Cada vez mais Veículos Auto Guiados (AGVs) são usados para tarefa de transporte em indústrias e armazéns. O gerenciamento desses AGVs é a chave para um sistema de transporte eficiente. Um dos principais problemas encontrados no gerenciamento dos AGVs é a decisão de despacho. Esse trabalho propõe um método de despacho de AGV com capacidade de otimizar o desempenho de Sistemas Flexíveis de Manufatura (FMS) em tempo real. Na tomada de decisão do despacho podem ser escolhidos dois objetivos para otimização: makespan ou tardiness. Quando o objetivo é otimizar o makespan são avaliadas as variáveis: distância, número de nós, buffer de entrada e buffer de saída das estações de trabalho. Quando o objetivo é otimizar o tardiness são avaliadas as variáveis: distância, número de nós, encadeamento de tarefas, data de entrega do produto. Em ambos os casos também são considerados os tempos dos AGVs e os tempos de processamento das estações de trabalho, para que seja possível adiantar algumas tomadas de decisões. Para realizar os testes foram usados os softwares MatLab, CPNtools e Automod, os quais permitem que simulações do funcionamento do método de despacho de AGVs antes que o método seja implementado em fábricas. Com base nos testes realizados, analisou-se as melhoras no makespan e tardiness em comparação com outros trabalhos, como também a flexibilidade do método no qual é possível a troca de objetivos em tempo de operação.
|
Page generated in 0.0716 seconds