• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Avvikelsehantering en isolerad händelse eller en del av ständiga förbättringar : En studie av avvikelsehanteringen i en kommuns egenregi verksamheter inom LSS 9:9

Stapf Ekström, Heidi January 2020 (has links)
Enligt SOFS 2011: 9 ska kommuner ha ett kvalitetsledningssystem, detta ska generera kunskap och utveckling inom organisationen och respektive förvaltning. En del av denna utveckling, och således kvalitetssäkringen, är arbetet med avvikelsehantering inom de verksamheterna som bedrivs, både inom kommunen och i de av kommunen upphandlade verksamheter. Om arbetet med avvikelser inte återspeglas i organisationens samtliga nivåer kan brister inte åtgärdas långsiktigt och organisationen och verksamheternas utvecklingspotential uppmärksammas inte. Att låta medarbetare få återkoppling och bekräftelse samt att skapa förutsättning för kunskapsutveckling i verksamheter är nödvändigt för att hela organisationen ska kunna utvecklas. För att detta ska kunna realiseras måste kvalitetsperspektivet löpa som en röd tråd genom förvaltningar, ledarskapet, de digitala systemen och styrdokument måste sammanfogas till en helhet. Det krävs en sammanhållen bild av vad organisationen och förvaltningen står för och vad som är det primära målet. En bild, inte löst liggande pusselbitar utan eget syfte. Denna studie påvisar ett behov av att sammanfoga dessa pusselbitar till en bild som alla kan se tolka och vara med att lägga. / According to SOFS 2011: 9, municipalities must have a quality management system, this should generate knowledge and development within the organization and the respective administration. Part of this development and thus quality assurance is the work with deviation control within the different care facilities both run by municipality but also care facilities procured by the municipality. If the work with deviations is not reflected in all levels of the organization, deficiencies cannot be remedied in the long term, and the organization and the development potential of the businesses are not noticed. To allow employees to receive feedback and confirmation and to create the prerequisite for knowledge development in operations is necessary for the entire organization to develop. For this to be realized, the quality perspective must be the main thread through administrations, leadership, digital systems and governance documents must be joined together as a whole. A clear picture of what the organization and management stand for and what is the primary goal. A cohensive image, not single pieces of a jigsaw puzzle, pieces without their own purpose. This study demonstrates a need to join these jigsaw puzzle pieces into an image that everyone can see, interpret and contribute to. / <p>2020-06-26</p>
2

Chefers förutsättningar för att lyckas med avvikelsehantering inom äldreomsorgen : En jämförande fallstudie av två kommuner

Hild, Clara January 2021 (has links)
Syftet med denna studie var att undersöka förutsättningarna för första linjens chefer att bedriva ett effektivt arbete med avvikelsehantering med avsikt att utveckla verksamhetens kvalitet och skapa lärande – både inom den egna verksamheten och på organisationsnivå. Två kommunala organisationer som driver särskilda boenden för äldre var föremål för undersökningen. Fokus låg på att undersöka i vilken utsträckning förutsättningarna fanns samt hur viktiga de ansågs vara.   Studien utformades som en fallstudie i två delar: en kvalitativ del där fyra intervjuer genomfördes för att identifiera förutsättningar och en kvantitativ del som utgjordes av en enkätundersökning för att studera förutsättningarnas förekomst och viktighet. Resultatet från enkäten jämfördes inom och mellan de två kommunerna och faktorerna förekomst och viktighet vägdes samman i en modell inspirerad av Importance–Performance Analysis, här kallad förekomst–viktighets-analys.   Resultatet visade att de förutsättningar som skapar en gynnsam organisationskultur var starka i de studerade kommunerna medan förutsättningar av typen arbetssätt, stödjande resurser och forum för erfarenhetsutbyte förekom i mindre utsträckning. Vidare visade resultatet att medarbetarnas delaktighet och förutsättningar som fokuserar på den egna verksamheten bedömdes som viktigast. Det fanns en markant skillnad mellan kommunerna i hur många av de viktigaste förutsättningarna som förekom i lägre utsträckning. / The purpose of this study was to examine the prerequisites for first-line managers to manage deviation control in an effective way to develop the quality of the organisation and create learning – both within their own unit and in the organisation as a whole. The cases for this study were two municipalities and their departments of nursing home facilities for senior citizens. The main focus was to examine to what extent the prerequisites appeared and how important they were perceived to be.   The study was designed as a case study in two parts: firstly, a qualitative interview study to identify the prerequisites and secondly, a quantitative survey study to examine to what extent the prerequisites appeared in the studied organisations, and how important they were perceived to be. The result was compared within as well as between the two organisations and displayed in a model inspired by Importance–Performance Analysis, called FVA (förekomst–viktighets-analys).   The result showed that the prerequisites that create a favourable organisational culture were strong in the studied organisations, while prerequisites linked to work procedures, supporting resources and arenas for exchanging experiences appeared to a lesser extent. The result also showed that prerequisites connected to the participation of the co-workers and the managers’ own facility were regarded as more important. The difference between the two organisations was considerable in how many of the most important prerequisites that appeared to a lesser extent. / <p>2021-06-06</p>
3

[pt] EFEITO DA ESTIMAÇÃO DOS PARÂMETROS SOBRE O DESEMPENHO CONJUNTO DOS GRÁFICOS DE CONTROLE DE X-BARRA E S / [en] EFFECT OF PARAMETER ESTIMATION ON THE JOINT PERFORMANCE OF THE X-BAR AND S CHARTS

LORENA DRUMOND LOUREIRO VIEIRA 09 July 2020 (has links)
[pt] A probabilidade de alarme falso, alfa, dos gráficos de controle de processos depende dos seus limites de controle, que, por sua vez, dependem de estimativas dos parâmetros do processo. Esta tese apresenta inicialmente uma revisão dos principais trabalhos sobre o efeito dos erros de estimação dos parâmetros do processo sobre alfa quando se utiliza o gráfico de X e S individualmente e em conjunto. O desempenho dos gráficos é medido através de medidas de desempenho (número médio de amostras até o sinal, taxa de alarme falso, distribuição do número de amostras até o sinal, que, em geral, são variáveis aleatórias, função dos erros de estimação. Pesquisas recentes têm focado nas propriedades da distribuição condicional do número de amostras até o sinal, ou ainda, nas propriedades da distribuição da taxa de alarme-falso condicional. Esta tese adota esta abordagem condicional e analisa o efeito da estimação dos parâmetros do processo no desempenho conjunto dos gráficos de X e S em dois casos: Caso KU (Média conhecida – Variância desconhecida) e Caso UU (Média desconhecida – Variância desconhecida). A quase totalidade dos trabalhos anteriores considerou apenas um gráfico, isoladamente; sobre efeito da estimação dos parâmetros sobre o desempenho conjunto conhecemos apenas um trabalho, sobre gráficos de X e R, mas nenhum sobre gráficos de X e S. Os resultados da análise mostram que o desempenho dos gráficos pode ser muito afetado pela estimação de parâmetros e que o número de amostras iniciais requerido para garantir um desempenho desejado é muito maior que os números tradicionalmente recomendados na literatura normativa de controle estatístico de processo (livros texto e manuais). Esse número é, porém, menor que o máximo entre os números requeridos para os gráficos de X e de S individualmente. Questões a serem investigadas como desdobramento dessa pesquisa são também indicadas nas Considerações Finais e Recomendações. / [en] The false-alarm rate of control charts, alpha, depends on the control limits calculated, which depend, in turn, on the estimated process parameters. This dissertation initially presents a review of the main research articles about the effect of the estimation errors of the process parameters upon alpha when X and S charts are used separately and together. The charts performance is evaluated through performance measures (average run-length, false-alarm rate, run-length distribution, etc), which are, in general, random variables, function of the estimation errors. Recent researches focused on the properties of the conditional run-length, or still (in the case of Shewhart charts) on the properties of the conditional false-alarm rate distribution. This dissertation adopts this conditional approach and investigates the effect of parameter estimation on the joint behavior of X and S charts in two cases: KU Case (Known mean – Unknown variance) and UU Case (Unknown mean - Unknown variance). Almost all previous works considered just only one chart separately – just only one joint performance work is known by the author, one about the effect of the estimation errors of the process parameters upon X e R joint performance. The results show that the charts performance can be severely affected by the parameter estimation and the number of initial samples required to ensure the desirable performance is greater than the numbers of initial samples recommended by traditional statistical process control reference texts (books and manuals). This number is, however, smaller than the maximum between the numbers of samples required by the X and the S charts separately. Additional issues for follow-up research are recommended in the concluding section.

Page generated in 0.1021 seconds