VALIDATION OF THE PSS/E MODEL FOR THE GOTLAND NETWORKRHrag, Margossian January 2010 (has links)
The aim of the project is to revise the load flow and dynamic PSS/E models of the Gotland network and validate them against a set of measurements collected during a major disturbance, a three phase short circuit in the 70 kV system. The main task in revising the model is to convert the induction machine models of the wind turbines into user and manufacturer wind turbine models. The validation of the model is divided into two phases. The first is to use the measurements as well as some assumptions on the wind power generation and load distribution from the time of the fault to validate the dynamic behaviour of the system. The second is to use new measurements during a normal operation day. The latter would not be very helpful to illustrate the dynamic behaviour of the system, because of the lack of a major fault that would drastically affect the system, but it would nevertheless be useful to validate the load flow with greater accuracy.
|
Page generated in 0.1361 seconds