• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 30
  • 4
  • Tagged with
  • 34
  • 14
  • 11
  • 11
  • 7
  • 7
  • 7
  • 7
  • 7
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Undersökning av elkvalitet hos tre industrikunder till ABB Building Systems AB

Pettersson, Marthin January 2002 (has links)
No description available.
12

Reservmatningsberäkningar : Birka Nät AB

Mohammed, Randa January 2002 (has links)
No description available.
13

Elkvalitet : undersökning av spänningsgodhet i Götene EDF:s distributionsområde

Olsson, Fredrik January 2003 (has links)
No description available.
14

Undersökning av elkvalitet hos tre industrikunder till ABB Building Systems AB

Pettersson, Marthin January 2002 (has links)
No description available.
15

Reservmatningsberäkningar : Birka Nät AB

Mohammed, Randa January 2002 (has links)
No description available.
16

Elkvalitet : undersökning av spänningsgodhet i Götene EDF:s distributionsområde

Olsson, Fredrik January 2003 (has links)
No description available.
17

Modelling bidding behaviour in electricity auctions : supply function equilibria with uncertain demand and capacity constraints /

Holmberg, Pär, January 2005 (has links)
Diss. (sammanfattning) Uppsala : Uppsala universitet, 2005. / Härtill 5 uppsatser.
18

Three essays on electricity spot and financial derivative prices at the Nordic power exchange /

Deng, Daniel, January 2006 (has links) (PDF)
Diss. (sammanfattning) Göteborg : Göteborgs universitet, 2006. / Härtill 3 uppsatser.
19

Planerade arbetens påverkan på SAIDI : analys baserad på Vattenfall Eldistribution AB:s nät / Planned work’s affect to SAIDI : analysis based on Vattenfall Eldistribution AB’s grid

Hendberg, Jessica, Lundgren, Emma January 2019 (has links)
Det här examensarbetet är utfört på uppdrag av Vattenfall Eldistribution AB och utfördes på deras kontor i Trollhättan. Syftet med projektet var initialt att påvisa att den idag planerade vägen till SAIDI-målet år 2025, troligen kommer att te sig annorlunda jämfört med de ursprungliga målen. Detta på grund av alla investeringar som görs i elnätet. Med dessa investeringar följer många driftorder, vilket ofta innebär planerade avbrott för kunderna. Det som undersöks är de eventuella störningar som kan kopplas till ett planerat avbrott. Det vill säga, om det har blivit ett följdfel på grund av ett planerat arbete, vilket orsakat ett kundavbrott som varade i minst tre minuter utöver den planerade avbrottstiden. Enligt Energimarknadsinspektionen delas begreppet elkvalitet upp i två olika parametrar; leveranssäkerhet och spänningskvalitet. Detta arbete fokuserar endast på leveranssäkerhet, närmare bestämt de långa avbrotten, vilket innebär avbrott som varar längre än tre minuter. För att elnätsbolag ska kunna jämföras finns det ett antal olika avbrottsindikatorer som exempelvis SAIDI och SAIFI. SAIDI är ett mätetal som fås fram genom kvoten mellan antalet kundavbrottsminuter och det totala kundantalet. Det resultat som framkommit går inte att rättvist jämföra med de historiska SAIDI-resultat som Vattenfall Eldistribution AB presenterar, då olika varianter av SAIDI används. Resultatet visar dock att en betydelsefull påverkan på SAIDI fås på grund av att det uppstår följdfel vid vissa kopplingar som görs i nätet, i samband med planerade arbeten. Dessa följdfel kan exempelvis bero på att en frånskiljare går sönder, fel i dokumentationen vilket leder till att fel apparat manövreras eller på grund av den mänskliga faktorn. / This thesis is made on behalf of Vattenfall Eldistribution AB and was conducted at their office in Trollhättan. The purpose of the project was initially to reveal that the way to the 2025‘s SAIDI-goal, probably will deviate from the original goal. This because of the many investments that are made in the power grid. These investments often lead to many switching schedules which often, for the customers, mean a planned interruption of the power supply. What is to be investigated is if there are any disturbances which are related to a planned interruption. Namely, if there was a secondary fault caused by the planned work, that caused a customer interruption that lasted longer than three minutes aside from the planned interruption time. According to Swedish Energy Markets Inspectorate, the concept of power quality divides into two different parameters; continuity of supply and voltage quality. This work will only focus on the continuity of supply, more particularly the interruptions which last more than three minutes. To enable comparison between electrical companies there are a few interruption indicators which for example are SAIDI and SAIFI. SAIDI is the quota of the total customer interruption time and the total customer quantity. The result that has been shown is not comparable to the historical SAIDI-results which Vattenfall Eldistribution AB presents, since different variations of SAIDI is being used. The result shows that a meaningful impact is to be received because of secondary faults occurring with some of the switching done in the grid, due to planned work. These faults could for example be rooted in a disconnector failing, flaws in the documentation that lead to manoeuvres of the wrong device, or simply because of the human factor.
20

Implementering av översiktsbild för att hjälpa driftoperatörer bistå anvisningar från Starta Sverige / Implement a schematic overview to help control room operators follow instructions from Starta Sverige

Emami, Iman, Pilqvist, Martin January 2018 (has links)
Vattenfall Eldistribution arbetar med att förbereda organisationen för projektet "Starta Sverige" vilket är skapat av Svenska kraftnät. Målet är att genom gemensam samverkan mellan olika driftcentraler minimera problem vid driftuppbyggnad efter ett större komplexts tamnätsavbrott. Detta arbete syftar till att hjälpa Vattenfall Eldistributions driftoperatörer att på enklast, snabbast och säkrast möjliga sätt bistå strategin framtagen i Starta Sverige vid lasttillkoppling efter en större nätkollaps. Det görs genom att skapa en översiktsbild till Vattenfall Eldistributions driftsystem som innehåller all relevant information. Ovanstående mål uppnås genom att utföra intervjuer med driftoperatörer och driftsystemspecialister i syfte att förstå önskemål och förväntningar till översiktsbilden men också för att hålla översiktsbilden inom driftsystemets tekniska begränsningar. Flera iterationer har genomförts där ändringar av översiktsbilden skett utifrån de uppföljningsintervjuer som utförts. Resultatet är en översiktsbild ungefär i storlek av ett A4-papper. Tekniska begräsningar hindrar en del av driftoperatörernas önskemål från att bli verklighet, exempelvis diagrammed kvarstående aktiv effekt att koppla in efter ett större avbrott. Resultatet av arbetet blir en översiktsbild för varje av Starta Sveriges åtta zoner. Översiktsbilden innehåller information om relevanta stationer, reaktiva komponenter, lindningskopplare samt spänning och frekvens i stamnätspunkten. Fokus läggs också på att uppvisa den tillkopplade och tilldelade aktiva effekten inom varje stamnätspunkt eftersom det enligt Starta Sveriges anvisningar är av prioritet vid nätåteruppbyggnad. Översiktsbilden kommer att implementeras i driftsystemet samma år som publiceringen avdenna rapport, men en exempelbild i Vattenfall Eldistributions driftsystem finns redan tillgänglig. Eftersom bilden enbart är tänkt att nyttjas vid ett större stamnätsavbrott råder osäkerhet kring när den faktiska användningen kommer ske. / Vattenfall is currently working to meet the instructions of the project "Starta Sverige" that is created by the Swedish transmission system operators in which a cooperation between different control rooms and control centers will minimize problems during power system restoration after a major disturbance. This work aims to aid the completion of the strategy in Starta Sverige for the control-room operators at Vattenfall to reconnect load after a system failure in the simplest, fastest and safest way possible. This will be done through development of a schematic overview to Vattenfall's operating system. The way to achieve this is to conduct interviews with control-room operators and operating system specialists with the purpose of understanding their needs and expectations but also to understand the technical limitations of the operating system. The development has been performed in an iterative way where follow-up interviews weremade to persistently improve the schematic overview. The result is a schematic overview roughly the size of an A4-papersheet. Technical limitations prevent some of the control-room operator's wishes to become reality, such asto use graphs to show the remaining active power to reconnect. There is one schematic overview to each of the eight zones of Starta Sverige in Sweden which will contain information about relevant stations, reactive components and transformer taps in addition to showing the voltage and frequency for the connection point to the national transmission grid. According to the instructions of Starta Sverige there is a priority to present the available and used active power since this information is important for system restoration. The schematic overview is planned to be implemented in the operating system the same year as the publication of this report, although currently an example is accessible in Vattenfall's operating system. Since the schematic overview is planned to be used after amajor system breakdown there's an uncertainty when the actual use will be.

Page generated in 0.08 seconds