Spelling suggestions: "subject:"alectric machinery industry"" "subject:"delectric machinery industry""
1 |
Feasibility study of developing China trade for the technical product: small size electric generator : research report.January 1981 (has links)
by Lee Yin-sum. / Thesis (M.B.A.)--Chinese University of Hong Kong, 1981. / Bibliography: leaves 55-56.
|
2 |
Power and mutualism in Japanese supply networksAhmadjian, Christina Linn. January 1995 (has links)
Thesis (Ph. D.)--University of California at Berkeley, 1995.
|
3 |
A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-OrderMoshtaghi Moghaddam, Jahanguir 12 1900 (has links)
This study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO).
|
Page generated in 0.097 seconds