Spelling suggestions: "subject:"cuture roofing"" "subject:"cuture waterproofing""
1 |
From design to operations: a process management life-cycle performance measurement system for Public-Private PartnershipsLiu, H.J., Love, P.E.D., Smith, J., Irani, Zahir, Hajli, N., Sing, M.C.P. 10 April 2017 (has links)
Yes / Public–Private Partnerships (PPPs) have become a critical vehicle for delivering infrastructure worldwide. Yet, the use of such a procurement strategy has received considerable criticism, as they have been prone to experiencing time/cost overruns and during their operation poorly managed. A key issue contributing to the poor performance of PPPs is the paucity of an effective and comprehensive performance measurement system. There has been a tendency for the performance of PPPs to be measured based on their ex-post criteria of time, cost and quality. Such criteria do not accommodate the complexities and lifecycle of an asset. In addressing this problem, the methodology of sequential triangulation is used to develop and examine the effectiveness of a ‘Process Management Life Cycle Performance Measurement System’. The research provides public authorities and private-sector entities embarking on PPPs with a robust mechanism to effectively measure, control and manage their projects’ life cycle performances, ensuring the assets are ‘future proofed’.
|
2 |
Identity - Orientation - Interface. The adaptive re-use of the NZASM Building in Pretoria, South Africa. Working towards an architecture which aids the orientation of the user and serves to further define the identity of the cityMartin, Conrad 29 November 2010 (has links)
This thesis seeks to explore the potential of existing built fabric to change in order to meet the needs of its users. Central to this is the realisation that cities are highly dynamic environments. Momentarily appropriate, static solutions are not acceptable.This means not only adapting an existing building to fit a particular need at a particular time, but to ensure that it lends itself to future change. The building chosen for this study is the NZASM building, currently owned by Transnet, on the corner of Paul Kruger and Minnaar Streets. It was completed in 1963 on the property of the old NZASM headquarters and now serves mainly to house offices for Transnet. The building was between sixty and seventy percent occupied at the time of writing this thesis. The client is a fictional coalition of NGOs. The desired program is what will be referred to as an NGO Hub. The NGO Hub is a shared office and public interface facility. The intent is that these NGOs share resources and act within their specialties to support one another on collaborative projects. They must also be free to pursue their own projects and retain individual identity. At the same time, members of the public have a central location to visit where they can find information and the NGO best capable of serving their needs. This will lead to a far more efficient operational model for these organisations. The thesis also assumes that a scheme by Mary-Anne Da Costa, Surfaces and Services - A Public Space for Communication, Information + Discussion (2007), for Pretorius Square is feasible and that the two projects will occur simultaneously. The programmatic aim is to create a true civic square in Pretoria that will also serve as an example to other cities. This thesis will also work towards generating and reinforcing identity within the city. The reason for doing so is that we orientate ourselves by our environment. The clearer our idea of what a building/district/city is, the clearer our perception of what our relationship to it is and the better oriented we feel. / Dissertation (MArch(Prof))--University of Pretoria, 2010. / Architecture / unrestricted
|
Page generated in 0.0709 seconds