Spelling suggestions: "subject:"gauging absence off prerequisites"" "subject:"gauging absence off prerrequisites""
1 |
Knowledge based system implementation for lean process in low volume automotive manufacturing (LVAM) with reference to process manufacturingMohamed, N.M.Z.Nik, Khan, M. Khurshid 04 August 2011 (has links)
Yes / Global manufacturing industry mostly depends on new product development and processes to
become competitive. The product development process for automotive industry is normally
complicated, lengthy, expensive, and risky. Hence, a study of lean manufacturing processes for
low volume manufacturing in automotive industry is proposed to overcome this issue by
eliminating all wastes in the lengthy process. This paper presents a conceptual design approach to
the development of a hybrid Knowledge Based (KB) system for lean process in Low Volume
Automotive Manufacturing (LVAM). The research concentrates on the low volume processes by
using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites
(GAP). The hybrid KB/GAP system identifies all potential waste elements of low volume process
manufacturing. The KB system analyses the difference between the existing and the benchmark
standards for lean process for an effective implementation through the GAP analysis technique.
The proposed model explores three major lean process components, namely Employee
Involvement, Waste Elimination, and Kaizen (continuous improvement). These three components
provide valuable information in order for decision makers to design and implement an optimised
low volume manufacturing process, but which can be applied in all process manufacturing,
including chemical processing.
|
2 |
The development of a hybrid knowledge-based Collaborative Lean Manufacturing Management (CLMM) system for an automotive manufacturing environment: The development of a hybrid Knowledge-Based (KB)/ Analytic Hierarchy Process (AHP)/ Gauging Absences of Pre-Requisites (GAP) Approach to the design of a Collaborative Lean Manufacturing Management (CLMM) system for an automotive manufacturing environment.Moud Nawawi, Mohd Kamal January 2009 (has links)
The automotive manufacturing facility is extremely complex and expensive system. Managing and understanding the dynamics of automotive manufacturing is a challenging endeavour. In the current era of dynamic global competition, a new concept such as Collaborative Lean Manufacturing Management (CLMM) can be implemented as an alternative for organisations to improve their Lean Manufacturing Management (LMM) processes. All members in the CLMM value chain must work together towards common objectives in order to make the LMM achievable in the collaborative environment.
The novel research approach emphasises the use of Knowledge-Based (KB) approach in such activities as planning, designing, assessing and providing recommendations of CLMM implementation, through: a) developing the conceptual CLMM model; b) designing the KBCLMM System structure based on the conceptual model; and c) implementing Gauging Absences of Pre-requisites (GAP) analysis and Analytic Hierarchy Process (AHP) approach in the hybrid KBCLMM.
The development of KBCLMM Model is the most detailed part in the research process and consists of five major components in two stages. Stage 1 (Planning stage) consists of Organisation Environment, Collaborative Business and Lean Manufacturing components. Stage 2 (Design stage) consists of Organisation CLMM Capability and Organisation CLMM Alignment components. Each of these components consists of sub-components and activities that represent particular issues in the CLMM development. From the conceptual model, all components were transformed into the KBCLMM System structure, which is embedded with the GAP and AHP techniques, and thus, key areas of potential improvement in the LMM are identified for each activity along with the identification of both qualitative and quantitative aspects for CLMM implementation.
In order to address the real situation of CLMM operation, the research validation was conducted for an automotive manufacturer¿s Lean Manufacturing Chain in Malaysia. Published case studies were also used to test several modules for their validity and reliability. This research concludes that the developed KBCLMM System is an appropriate Decision Support System tool to provide the opportunity for academics and industrialists from the fields of industrial engineering, information technology, and operation management to plan, design and implement LMM for a collaborative environment. / Universiti Utara Malaysia and Ministry of Higher Education of Malaysia
|
3 |
The development of a hybrid knowledge-based Collaborative Lean Manufacturing Management (CLMM) system for an automotive manufacturing environment : the development of a hybrid Knowledge-Based (KB)/ Analytic Hierarchy Process (AHP)/ Gauging Absences of Pre-Requisites (GAP) Approach to the design of a Collaborative Lean Manufacturing Management (CLMM) system for an automotive manufacturing environmentMoud Nawawi, Mohd Kamal January 2009 (has links)
The automotive manufacturing facility is extremely complex and expensive system. Managing and understanding the dynamics of automotive manufacturing is a challenging endeavour. In the current era of dynamic global competition, a new concept such as Collaborative Lean Manufacturing Management (CLMM) can be implemented as an alternative for organisations to improve their Lean Manufacturing Management (LMM) processes. All members in the CLMM value chain must work together towards common objectives in order to make the LMM achievable in the collaborative environment. The novel research approach emphasises the use of Knowledge-Based (KB) approach in such activities as planning, designing, assessing and providing recommendations of CLMM implementation, through: a) developing the conceptual CLMM model; b) designing the KBCLMM System structure based on the conceptual model; and c) implementing Gauging Absences of Pre-requisites (GAP) analysis and Analytic Hierarchy Process (AHP) approach in the hybrid KBCLMM. The development of KBCLMM Model is the most detailed part in the research process and consists of five major components in two stages. Stage 1 (Planning stage) consists of Organisation Environment, Collaborative Business and Lean Manufacturing components. Stage 2 (Design stage) consists of Organisation CLMM Capability and Organisation CLMM Alignment components. Each of these components consists of sub-components and activities that represent particular issues in the CLMM development. From the conceptual model, all components were transformed into the KBCLMM System structure, which is embedded with the GAP and AHP techniques, and thus, key areas of potential improvement in the LMM are identified for each activity along with the identification of both qualitative and quantitative aspects for CLMM implementation. In order to address the real situation of CLMM operation, the research validation was conducted for an automotive manufacturer's Lean Manufacturing Chain in Malaysia. Published case studies were also used to test several modules for their validity and reliability. This research concludes that the developed KBCLMM System is an appropriate Decision Support System tool to provide the opportunity for academics and industrialists from the fields of industrial engineering, information technology, and operation management to plan, design and implement LMM for a collaborative environment.
|
4 |
The development of a hybrid knowledge-based system for designing a low volume automotive manufacturing environment : the development of a hybrid knowledge-based (KB)/gauging absences of pre-requisites (GAP)/analytic hierarchy process (AHP) system for the design and implementation of a low volume automotive manufacturing (LVAM) environmentMohamed, N. M. Z. Nik January 2012 (has links)
The product development process for the automotive industry is normally complicated, lengthy, expensive, and risky. Hence, a study on a new concept for Low Volume Automotive Manufacturing (LVAM), used for niche car models manufacturing, is proposed to overcome this issue. The development of a hybrid Knowledge Based (KB) System, which is a blend of KB System, Gauging Absences of Pre-requisites (GAP), and Analytic Hierarchy Process (AHP) is proposed for LVAM research. The hybrid KB/GAP/AHP System identifies all potential elements of LVAM issues throughout the development of this system. The KB System used in the LVAM analyses the gap between the existing and the benchmark organisations for an effective implementation. The novelty and differences in the current research approach emphasises the use of Knowledge Based (KB) System in the planning and designing stages by suggesting recommendations of LVAM implementation, through: a) developing the conceptual LVAM model; b) designing the KBLVAM System structure based on the conceptual LVAM model; and c) embedding Gauging Absences of Pre-requisites (GAP) analysis and Analytic Hierarchy Process (AHP) approach in the hybrid KBLVAM System. The KBLVAM Model explores five major perspectives in two stages. Planning Stage (Stage 1) consists of Manufacturer Environment Perspective (Level 0), LVAM Manufacturer Business Perspective (Level 1), and LVAM Manufacturer Resource Perspective (Level 2). Design Stage (Stage 2) consists of LVAM Manufacturer Capability - Car Body Part Manufacturing Perspective (Level 3), LVAM Manufacturer Capability - Competitive Priorities Perspective (Level 4), and LVAM Manufacturer Capability - Lean Process Optimisation Perspective (Level 5). Each of these perspectives consists of modules and sub-modules that represent specific subjects in the LVAM development. Based on the conceptual LVAM model, all perspectives were transformed into the KBLVAM System structure, which is embedded with the GAP and AHP techniques, hence, key areas of potential improvement are recommended for each activity for LVAM implementation. In order to be able to address the real situation of LVAM environment, the research verification was conducted for two automotive manufacturers in Malaysia. Some published case studies were also used to check several modules for their validity and reliability. This research concludes that the developed KBLVAM System provides valuable decision making information and knowledge to assist LVAM practitioners to plan, design and implement LVAM in terms of business organisation, manufacturing aspects and practices.
|
5 |
The Development of a Hybrid Knowledge-Based System for Designing a Low Volume Automotive Manufacturing Environment. The Development of A Hybrid Knowledge-Based (KB)/Gauging Absences of Pre-Requisites (GAP)/Analytic Hierarchy Process (AHP) System for the Design and Implementation of a Low Volume Automotive Manufacturing (LVAM) Environment.Mohamed, N.M.Z.Nik January 2012 (has links)
The product development process for the automotive industry is normally complicated, lengthy, expensive, and risky. Hence, a study on a new concept for Low Volume Automotive Manufacturing (LVAM), used for niche car models manufacturing, is proposed to overcome this issue. The development of a hybrid Knowledge Based (KB) System, which is a blend of KB System, Gauging Absences of Pre-requisites (GAP), and Analytic Hierarchy Process (AHP) is proposed for LVAM research. The hybrid KB/GAP/AHP System identifies all potential elements of LVAM issues throughout the development of this system. The KB System used in the LVAM analyses the gap between the existing and the benchmark organisations for an effective implementation.
The novelty and differences in the current research approach emphasises the use of Knowledge Based (KB) System in the planning and designing stages by suggesting recommendations of LVAM implementation, through: a) developing the conceptual LVAM model; b) designing the KBLVAM System structure based on the conceptual LVAM model; and c) embedding Gauging Absences of Pre-requisites (GAP) analysis and Analytic Hierarchy Process (AHP) approach in the hybrid KBLVAM System.
The KBLVAM Model explores five major perspectives in two stages. Planning Stage (Stage 1) consists of Manufacturer Environment Perspective (Level 0), LVAM Manufacturer Business Perspective (Level 1), and LVAM Manufacturer Resource Perspective (Level 2). Design Stage (Stage 2) consists of LVAM Manufacturer Capability ¿ Car Body Part Manufacturing Perspective (Level 3), LVAM Manufacturer Capability ¿ Competitive Priorities Perspective (Level 4), and LVAM Manufacturer Capability ¿ Lean Process Optimisation Perspective (Level 5). Each of these perspectives consists of modules and sub-modules that represent specific subjects in the LVAM development. Based on the conceptual LVAM model, all perspectives were transformed into the KBLVAM System structure, which is embedded with the GAP and AHP techniques, hence, key areas of potential improvement are recommended for each activity for LVAM implementation.
In order to be able to address the real situation of LVAM environment, the research verification was conducted for two automotive manufacturers in Malaysia. Some published case studies were also used to check several modules for their validity and reliability. This research concludes that the developed KBLVAM System provides valuable decision making information and knowledge to assist LVAM practitioners to plan, design and implement LVAM in terms of business organisation, manufacturing aspects and practices. / Universiti Malaysia Pahang and Ministry of Higher Education
Malaysia
|
6 |
The Development of a Hybrid Knowledge-Based System for Integrated Maintenance Strategy and Operations in an Automotive Industry Environment: The Development of a Hybrid Knowledge-Based (KB) System/ Gauging Absences of Pre-Requisites (GAP)/Analytic Hierarchy Process (AHP) Methodology for Integrated Maintenance Strategy and Operations in an Automotive Industry EnvironmentMilana, Milana January 2018 (has links)
The dependency of maintenance as a manufacturing logistic function has made
the considerations of maintenance decisions complex in nature. The importance
of maintenance has escalated significantly by the increasing of automation in
manufacturing processes. This condition switches the traditional maintenance
perspective of “fire-fighter” into the business competitive driver. As a
consequence, maintenance needs to consider other related aspects of decision
making to achieve competitive advantage.
This research aims to develop a hybrid Knowledge-Based (KB)
System/GAP/AHP methodology to support the integration of maintenance
decision with business and manufacturing perspectives. It constructs over 2000
KB rules on Strategic Stage (business and manufacturing aspects) and
Maintenance Operations Stage (maintenance aspects). Each aspect contains
KB rules attached with GAP analysis to assess the gap between current and
prerequisite condition. AHP analysis is then deployed to compare those aspects
structurally in a pair-wise manner to identify the critical ones to be rectified. This
hybrid KB system is useful in reviewing the existing maintenance system
performance and provides reasonable recommendations to improve
maintenance performance with respect to business and manufacturing
perspectives. Eventually, it indicates the roadmap from the current state to the
benchmark goals for the maintenance system.
This novel methodology of KBS/GAP/AHP to support maintenance decision is
developed for a particular application in the automotive environment. The
validation is conducted in two automotive companies in Indonesia and one
published case study in an automotive company. The result confirms that the
developed KB system can provide the valid, reasonable and consistent result to
propose structured recommendation for maintenance improvement priority.
|
7 |
The development of a hybrid knowledge-based system for the design of a Low Volume Automotive Manufacturing (LVAM) systemMohamed, N.M.Z.Nik, Khan, M. Khurshid January 2012 (has links)
No / A conceptual design approach is an important stage for the development of a hybrid Knowledge-Based System (KBS) for Low Volume Automotive Manufacturing (LVAM). The development of a hybrid KBS, which is a blend of KBS and Gauging Absences of Pre-requisites (GAP), is proposed for LVAM research. The hybrid KB/GAP system identifies all potential elements of LVAM issues throughout the development of this system. The KBS used in the system design stage of the LVAM system analyses the gap between the existing and the benchmark organisations for an effective implementation through the GAP analysis technique. The proposed KBLVAM model at the design stage explores three major components, namely LVAM car body parts manufacturing perspective, LVAM competitive priorities perspective and LVAM lean environment perspective. Initial results reveal that the KBLVAM system has identified, for each perspective modules and sub-modules, the Problem Categories (PC) in a prioritised manner. / The financial support by the Malaysian Government, Universiti Malaysia Pahang and University of Bradford for this research is grateful acknowledged.
|
Page generated in 0.0955 seconds