The impact of non-compliance with Eskom procurement policiesMvelase, Thokozile Olivia January 2015 (has links)
Supply Chain Management (SCM) has an overwhelming impact on firms as it directly impacts on sales and costs. Therefore, it must be a core competency for any organization and thus SCM expertise is highly valued in organisations. Procurement of goods and services has a major impact on the successful execution of the project. Procurement can help the business, ensuring that all the goods and services they buy will be of the right quality, quantity and price, and they will be delivered ‘just in time’. The application of procurement policies and practices, using fair and open procedures, is crucial not only for attracting efficient contractors and suppliers, but also to safeguard the principle of accountability and the cost-effective use of funds. Before awarding a tender, there is a substantial amount of work to be undertaken by the project manager, contracts manager, end user, buyer, and authorising committees. Commitment from personnel involved in contract awarding is not adequate. Furthermore, the Eskom governance process sometimes contributes to delays in awarding a contract. before the enquiry and tender documentation is sent out to the suppliers on the tender list, the core team involved in the procurement process verifies that the enquiry is complete and correct. Should there be contractual or legal issues during the execution of the project in the form of say a contract that has been issued with unsuitable clauses, solving the problem becomes difficult. Contractors will sometimes use contract clauses to suit themselves, and take advantage of the employer, causing cost overruns due to the difficulties in managing the contract. Eskom’s commercial activities are governed by the Public Finance Management Act (PFMA) and Constitution of South Africa, which states that an organisation such as Eskom should have in place “an appropriate procurement and provisioning system which is fair, equitable, transparent, competitive, and cost-effective.” This can eliminate irregularities in contracts, since they can have a serious economic impact, interfere with fair competition, and destroy confidence in the integrity and functioning of public administration Such irregularities may lead to costs overruns on projects where incompetent contractors are awarded a contract. Incorrect financial forecasting is a very serious issue, and needs to be addressed in order to help strengthen the cash flow and forecasting within Eskom. This research strategy is intended for quantifying observations of human behaviour, with the emphasis on exact measurements. The primary data for this study was generated through the administration of a structured questionnaire survey conducted among engineers, project managers, contract managers, and forensics personnel. The secondary data for the present study was gathered from literature in the form of open ended questionnaire from the same personnel. Poor commitment of buyers and chain approval meetings being shifted affect the delays in awarding of contracts. Lack of training of contract managers, absence of legal representative’s advice and squad checking meetings not being represented properly contributes to contracts being awarded with unsuitable clauses. Managers specifically forcing contracts to be awarded to a specific contractor, nepotism or favoritism, politics and contractor greediness, relate to irregularities in contracts. Lack of experience, revision of scope (unclarified scope), project delays, less effort being made when forecasting and unforeseen circumstances, such as strikes, and forces of nature, relate to incorrect financial forecasting. Continuous training and commitment of all personnel involved in the project environment is important, therefore Eskom personnel in the project environment should work as a team in an integrated way. Adequate time should be spent, and thorough checks made, to ensure that documents sent out for tendering conform to requirements. Involvement of all the supporting functions must be maximised. Code of ethics training and application is very crucial in the project environment, and the current governance policies should be adhered to by all stakeholders in the project.
|
2 |
Pricing models for two-stage supply chainsErtek, Gurdal 12 1900 (has links)
No description available.
|
3 |
Feasibility of changing from manual to an electronic procurement system at UTI Domestic.Govender, Vinoden. January 2006 (has links)
Procurement is the acquisition of goods or services at the best possible total cost of
ownership, in the correct quantity, at the correct time, in the correct place for the direct
benefit or use of corporations, governments or individuals (Procurement 2005).
Electronic procurement is the fulfillment of the procurement function by use of the
Internet and new technologies to facilitate a seamless, end-to-end stream of strategic
procurement activities enabling improved responsiveness and analysis within the
procurement organisation (Wheatley 2003).
The aim of the study was to identify the effectiveness and efficiency of the current
procurement processes in place at UTi Domestic and to investigate the feasibility of using
Electronic Procurement as a possible mechanism for Business Process Re-Engineering
within UTi Domestic, to streamline and add value to the overall procurement function.
This study was undertaken at UTi domestic in Johannesburg. Questionnaires were used to
collect data. In total, twenty-eight procurement staff members and six management
members completed separate questionnaires. One hundred percent response rate was
achieved for both groups. The procurement staff completed a structured questionnaire
while management were asked unstructured questions. Data obtained from the
questionnaires were analysed using the Statistical Package for the Social Sciences
(SPSS).
The findings of the study indicated that the procurement process at UTi Domestic was
inefficient and ineffective. The procurement process was in need of redesign.
Controversy existed between management and procurement staff over whether e-procurement
would be the solution to the procurement problem. The researcher
recommended the implementation of an e-procurement solution as a resolution to the
procurement problem, based on the value potential of the solution and the ability of the
solution to positively satisfy all of the aims of the study. As supported by the literature, e-procurement
can make a significant difference to UTi Domestic. / Thesis (MBA)-University of KwaZulu-Natal, Westville, 2006.
|
4 |
Value of information in a closed loop supply chain in presence of unreliable suppliers for new product /Vasavada, Amit. January 2009 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Thomas J. Watson School of Engineering and Applied Science, Department of Systems Science and Industrial Engineering, 2009. / Includes bibliographical references.
|
5 |
Strategic high performance business development : sustainable procurementAucamp, Abram Carel 03 1900 (has links)
Thesis (MComm)--Stellenbosch University, 2008. / ENGLISH ABSTRACT: The role of the traditional purchasing department has evolved significantly over the last
decade into a competitive value adding procurement function within an organisation’s lean
supply chain model. It has become a necessity to work with the suppliers to provide flexible,
accurate, effective and cost effective goods and/or services (Barla, 2003; Ellram, 2002).
In addition organisations are developing and utilising new business models geared towards
improving both the balance sheet and the income statement to respond to external forces
and new market opportunities. The change in business model places additional emphasis on
leveraging increased innovation from suppliers, thus having a vast impact on supply
management to such an extent that organisations are creating strategic relationships (Carter
et al., 2007).
In this paper, the supplier relationship management model will be studied under lean
philosophy as to address the focal point – sustainable procurement. The paper will consist of
three main areas:
Supplier relationship management – Literature study
Supplier relationship management – Case study
Supplier relationship management – Operational tool
Supplier relationship management – Literature study will address the theoretical
methodologies, best practices, benefits and advantages, etc.
Supplier relationship management – Case study will showcase a South African multi-national
FMCG1 manufacturer’s methodology as well as the benefits of utilising a supplier relationship
management approach to procurement.
Supplier relationship management – Operational tool will be a practical tool developed for
evaluating and facilitating supplier relationship management in an African context.
The end result of the paper should be a feasible solution to prolonging the impact of
procurement, thus increasing sustainability in the maturity stage of procurement’s life span in
the typical product life cycle model (Canny Buyer, 2007). 1 Fast Moving Consumer Goods (“FMCG”) are products that have a quick turnover and relatively low cost
(Wikipedia, 2007a). / AFRIKAANSE OPSOMMING: Die tradisionele rol van die aankope department binne ‘n organisasie het oor die laaste
dekade merkwaardig verander en word nou bedryf as ‘n kompeterende waardetoevoegende
skakel binne die organisasie se voorsieningsketting. Terselfdetyd het dit noodsaaklik vir
leweransiers en organisasies geword om op ’n geïntegreerde wyse te werk te gaan om meer
akkurate en koste-effektiewe goedere en/of dienste te lewer (Barla, 2003; Ellram, 2002).
Organsisasies is ook genoodsaak om nuwe innoverende besigheidsmodelle te ontwikkel om
ten beste eksterne besigheidsfaktore en nuwe markgeleenthede aan te spreek ten einde
beide die balanstaat sowel as die inkomste staat positief te impakteer. Hierdie kardinale
veranderinge in die besigheidsmodel van organisasies lei daar toe dat addisionele druk op
leweransiers geplaas word om met innovasie navore te kom. Op sy beurt plaas dit verdere
druk op die voorsieningsketting, selfs tot so ’n mate dat dit die organisasie noop om na die
moontlikhede van strategiese vennootskappe te ondersoek (Carter et al., 2007).
Die skryfstuk gaan leweransiers verhoudingsbestuurmodelle evalueer en bestudeer binne ‘n
voorsieningsketting om sodoende die vraag na volhoubare verkryging te beantwoord. Die
skryfstuk sal uit drie fokusareas bestaan, naamlik:
Leweransiers Verhoudingsbestuur – Literatuurstudie
Leweransiers Verhoudingsbestuur – Gevallestudie
Leweransiers Verhoudingsbestuur – Bedrysmodel
Leweransiers Verhoudingsbestuur – Literatuurstudie sal die teoretiese metodologie, die vooren
nadele van leweransiers verhoudingsbestuur aanspreek.
Leweransiers Verhoudingsbestuur – Gevallestudie sal ‘n studie loots binne die
verhoudingswerkinge binne ‘n Suid-Afrikaanse multi-nationale maatskapy wat in die vinnige
verbruikersgoederemark betrokke is.
Leweransiers Verhoudingsbestuur – Bedrysmodel sal ’n praktiese voorstel vorendag bring
om ’n leweransiersverhouding meer doeltreffende te bestuur in Afrika.
Die eindresultaat van die skryfstuk sal dus ’n lewens vatbare oplossing wees om die
volhoubare impak van verkrying te verleng in die volwasse stadium van ‘n produk se
lewensiklus (Canny Buyer, 2007).
|
6 |
Key factors required by purchasing and supply departments in the automotive manufacturing industryHowell, Jean Karin January 2015 (has links)
The main research problem addressed in this study was to determine the key factors required by purchasing and supply departments in the automotive manufacturing industry to be efficient and effective. To achieve this objective, it was necessary to identify five sub-objectives which were, firstly, to determine the extent to which the purchasing and supply departments in the automotive industry believe that certain key factors in pricing, quality and supplier management are required to achieve excellence. Secondly, to identify if the purchasing and supply departments in the automotive industry actually implement the key factors on pricing, quality and supplier management in practice. Thirdly, to determine if there are any additional factors other than these key factors that business firms regard as key factors to be classified as worldclass purchasing and supply departments. Fourthly, to analyse why purchasing and supply departments in the automotive manufacturing industry do not always implement these key factors. Lastly, to identify any other factors that could have a significant negative impact on the performance of purchasing and supply departments. The study commenced with an analysis and review of relevant literature from various text books, journals, publications and internet sources. The literature study covered issues such as price determination, cost management, basic negotiation strategies, managing supplier quality and the supplier base, as well as a general overview of the latest developments in purchasing and supply management in business. The purpose of the literature analysis was to establish a theoretical basis for the design of the questionnaire which was used as a research instrument in this study. A survey was conducted among selected automotive assemblers and their first and second tier manufacturing suppliers in the automotive industry. The main areas of focus in the questionnaire were pricing, quality, and supplier management. As the questions in the questionnaire related to the purchasing and supply department of a business firm, a qualified and experienced buyer in the purchasing and supply department was identified in each firm to complete the questionnaire. The empirical results from the study conducted indicated that the respondents were in strong agreement with the proposed importance of the factors of pricing, quality, and supplier management required to achieve xcellence. However, the respondents also indicated that there were various obstacles which prevented the firms from implementing these key factors. Some of the obstacles mentioned were long lead times, late deliveries from suppliers, too few competitors in the market place, supplier capacity constraints and the sustainability of suppliers. Additional obstacles that the study identified were the high workload of buyers in general, incompetent staff and insufficient manpower that affected the performance of a purchasing and supply department. The buyers were not only performing buying activities, but were also involved in logistics related activities, which increased their workload and negatively affected their performance. Lack of specialised purchasing and supply chain knowledge was identified as another obstacle to achieving excellence. The empirical study highlighted some recommendations to assist purchasing and supply departments in the automotive industry to achieve excellence and become world-class departments. Examples of these recommendations are that suppliers need to be educated on how to understand their costing models and to check their own sustainability; local purchasing and supply departments require training in the purchasing skills such as incoterms, delivery times, minimum and maximum order quantity; as well as the payment terms. Buyers should be trained to become experts in their products and packaging, as well as the manufacturing process of the product they are purchasing The business firm should only employ qualified buyers who have financial and administrative skills, as well as the ability to adapt to change and work in teams. Buyers also need to master the in-house systems and work procedures involved in purchasing a product. The empirical study also identified that the majority of buyers in the automotive manufacturing industry are senior buyers, male in gender and between the ages of 40-49. The implementation of the recommendations based on the study’s empirical findings will assist in improved pricing, quality and supply management in the automotive manufacturing industry.
|
7 |
The effective use of partnering for empowerment in the construction industry.Mbatha, Qinisani Nhlanhla. January 2004 (has links)
Abstract not available. / Thesis (M.Com.)-University of Natal, 2004.
|
8 |
An assessment of the effectiveness of administrative interventions in supply chain management in the Limpopo Department of Basic Education, South AfricaNgobeni, Harley January 2016 (has links)
Thesis (MPA.) -- University of Limpopo, 2016 / The purpose of this study was to determine the effectiveness of administrative intervention in Supply Chain Management in the Department of Education in Limpopo. This was done with the aim of looking into the strategies that were put in place during the intervention process and to examine whether the strategies have yielded the desired results of stabilising the department’s finances and averting the possible collapse of essential services.
Qualitative data were collected, primarily in the form of semi-structured interviews using an interview schedule consisting of both closed and open-ended questions with the Chief Financial Officer, General Manager (SCM), Senior Manager (SCM), Manager Demand and Acquisition, six Supply Chain Management Practitioners, and two members of the Intervention Task Team. All these officials provided sufficient information related to the effect of the administrative intervention in the SCM of the Limpopo Department of Education.
The study found that there were a number of strategies that were put in place by the members of the Intervention Task Team during the intervention process, such as : • Catering not exceeding R50.00 per person has to be provided only for meetings with external stakeholders and this provision only applied to meetings that take longer than five hours; • Promotional items such as t-shirts, caps, bags, etc., were not to be purchased by the department; • Engagement of consultants was also reduced to the minimal and it was only allowed where the department does not have the requisite skills or resources in its full time employ to perform the assignment in question; and • Trips by vehicles were to be optimised to reduce costs. However, the strategies that were put in place by the Intervention Task Team in the Supply chain management did not yield the desired results of stabilising the department’s finances and averting the possible collapse of essential services. Limpopo Department of Education continued to get an undesirable disclaimer audit
iii
opinion for the fourth consecutive year and the findings depicted poor administration and inability to comply with the treasury regulations.
|
9 |
Improving indirect purchasing competitiveness in manufacturing firms through strategic purchasingMakubalo, Gcobisa January 2011 (has links)
The advent of the global financial recession, its impact on the economy with respect to market turbulence and the increase in customer demands have put organisations under intense pressure to increase the efficiency and effectiveness of their operations. By virtue of it not being business as usual in the business arena, organisations are forced to constantly devise strategies that are geared towards growth, transformation and continuous improvement. This cuts across all spheres of organisational structures, which means that every division has a role to play.
|
10 |
A formative evaluation of the implementation process of the supply chain management policy framework in Eastern Cape Provincial AdministrationSandler, Jeanette Louise January 2011 (has links)
The Eastern Cape Provincial Administration has, since the promulgation of the Supply Chain Management Policy Framework in 2003, been challenged with the implementation of the said Policy.Some departments have progressed better than others, but all of the provincial departments have been challenged in one way or another.It was therefore, necessary to research the reasons for the erratic implementation process by the different departments. An analysis, based on answers provided by senior officials of the Eastern Cape Provincial Administration in an interviewing process, was needed to get an understanding of the challenges the departments are faced within the implementation process. In order to provide quality goods and services, this dissertation aims to evaluate the implementation process, provide insight to the challenges that the departments are faced with and offer recommendations on how to remedy these challenges. The lessons learned from this research study will assist the provincial departments to re-engineer their implementation processes and move forward to greater success and embracement of the Supply Chain Management policy Framework.
|