Estudo do desempenho de aços inoxidáveis modificados para aplicação em meios corrosivos do processamento primário do petróleo

Oikawa, Pedro Masato Venancio January 2009 (has links)
Diante do aumento na demanda por combustíveis fósseis e a descoberta de novos campos de exploração e produção de petróleo cada vez mais remotos e com condições de operação de maior agressividade torna-se evidente a necessidade de desenvolvimento de materiais capazes de resistir a estes novos ambientes. Este trabalho engloba a revisão bibliográfica de três famílias de aços inoxidáveis modificados desenvolvidas nas últimas décadas, os supermartensíticos, os superferríticos e os superausteníticos. A avaliação dos materiais foi realizada quanto à resistência aos mecanismos de deterioração esperados no processamento primário de petróleo com teores elevados de CO2 e presença de H2S, considerando variáveis de processamento comumente utilizadas. Com os resultados encontrados na literatura a luz dos mecanismos de deterioração e considerando as características de processamento, fez-se uma seleção de materiais via matriz de decisão qualitativa para os equipamentos de uma planta de processo de modo a obter a melhor relação de compromisso considerando resistência a corrosão, custo e resistência mecânica. / The increasing demand for fossil fuels and the discovery of new oil fields in remote locations with aggressive operation conditions enlighten the need for development of materials able to resist to this new environments. This work includes a review of three families of modified stainless steels developed in recent decades, the supermartensitic, the superferritic and superaustenitic. The materials were evaluated through the criteria of resistance to the damage mechanisms expected in the primary processing of oil with high levels of CO2 and the presence of H2S, considering variables of the processing plant. With the literature results in the light of the damage mechanisms and considering the characteristics of processing, it was developed a material selection using a qualitative decision matrix for the equipments of a process plant to obtain the best compromise considering resistance to corrosion, cost and strength.
12

Estudo do desempenho de aços inoxidáveis modificados para aplicação em meios corrosivos do processamento primário do petróleo

Oikawa, Pedro Masato Venancio January 2009 (has links)
Diante do aumento na demanda por combustíveis fósseis e a descoberta de novos campos de exploração e produção de petróleo cada vez mais remotos e com condições de operação de maior agressividade torna-se evidente a necessidade de desenvolvimento de materiais capazes de resistir a estes novos ambientes. Este trabalho engloba a revisão bibliográfica de três famílias de aços inoxidáveis modificados desenvolvidas nas últimas décadas, os supermartensíticos, os superferríticos e os superausteníticos. A avaliação dos materiais foi realizada quanto à resistência aos mecanismos de deterioração esperados no processamento primário de petróleo com teores elevados de CO2 e presença de H2S, considerando variáveis de processamento comumente utilizadas. Com os resultados encontrados na literatura a luz dos mecanismos de deterioração e considerando as características de processamento, fez-se uma seleção de materiais via matriz de decisão qualitativa para os equipamentos de uma planta de processo de modo a obter a melhor relação de compromisso considerando resistência a corrosão, custo e resistência mecânica. / The increasing demand for fossil fuels and the discovery of new oil fields in remote locations with aggressive operation conditions enlighten the need for development of materials able to resist to this new environments. This work includes a review of three families of modified stainless steels developed in recent decades, the supermartensitic, the superferritic and superaustenitic. The materials were evaluated through the criteria of resistance to the damage mechanisms expected in the primary processing of oil with high levels of CO2 and the presence of H2S, considering variables of the processing plant. With the literature results in the light of the damage mechanisms and considering the characteristics of processing, it was developed a material selection using a qualitative decision matrix for the equipments of a process plant to obtain the best compromise considering resistance to corrosion, cost and strength.
13

Avaliação da inspeção não intrusiva realizada em vaso separador e suas implicações no programa de inspeção do equipamento

Resende, Arthur Tomas de January 2009 (has links)
O presente trabalho avalia a viabilidade de execução de técnicas não intrusivas de inspeção em dois vasos separadores de produção. Para tanto a guia de inspeção não intrusiva DNV-RP-G103 foi seguida para a realização do planejamento de inspeção dos equipamentos. Foi realizado um estudo dos mecanismos de deterioração atuantes a partir dos relatórios de inspeção visual interna. A efetividade do plano de inspeção é avaliada pelo uso de um modelo matemático que utiliza a Simulação de Monte Carlo para a avaliação da probabilidade de detecção das descontinuidades e determinação da probabilidade de falha do equipamento antes e após a realização da inspeção. Estudos de probabilidade de detecção de trincas de fadiga por técnicas de inspeção não intrusiva realizados são abordados na revisão bibliográfica. Esses dados são de relevância para a obtenção dos parâmetros necessários para avaliar a efetividade das técnicas de inspeção proposta. / The present work evaluates the viability of non invasive inspection technique of two production pressure vessel. The non invasive inspection guide DNV-RP-G103 was applied for equipment inspection plan realization. The equipment aging process study was done according to the inspections reports of internal visual inspection previously done. The plan inspection affectivity is evaluated with a mathematic model that applies The Monte Carlo Simulation for calculate the discontinuity probability detection and determine the equipment failure probability before and after inspection realization. Detection probability study of fatigue cracks by non invasive techniques is revised in bibliographic review. This data are pertinent for obtain the needed parameters to reach the required effectiveness of inspection technique planned.
14

Aplicação de métodos estatísticos para a estimativa da menor espessura presente em tubos de feixes tubulares de permutadores de calor

Lima, Fábio Moreira January 2009 (has links)
O aumento da confiabilidade operacional é responsável pela elevação da segurança em plantas industriais assim como, pela redução de custos com manutenção. Engenheiros de inspeção, em muitos casos, utilizam métodos estatísticos que possibilitam a execução de inspeção por amostragem, nestes casos extrapolações dos resultados obtidos nos ensaios devem ser feitas para a partir daí estimar as condições físicas do equipamento como um todo. Propomos neste estudo dois métodos de cálculo que quando aplicados nos resultados de ensaio IRIS se possa estimar a menor espessura presente no feixe tubular. O primeiro método, designado como método de cálculo I, utiliza os conceitos de arranjo simples em conjunto com a delimitação do grupo de tubos de interesse na obtenção da estimativa da menor espessura presente no feixe tubular. O segundo método de cálculo, método de cálculo II, consiste em uma adaptação do método de cálculo proposto pela JSCE para a estimação da profundidade de pite no feixe, este método utiliza a distribuição dos valores de espessuras obtidos no ensaio, para através do conceito de período de retorno realizar cálculos que proporcionem obter uma estimativa da menor medida de espessura presente no feixe. Os métodos de cálculo estatísticos existentes utilizados na estimativa de menores espessuras em vasos e tubulações se baseia no ajuste dos valores de espessura obtidos por ensaios à curvas de distribuição previamente estabelecidas, verifica-se que este ajuste em geral não é encontrado para os dados utilizados no método de cálculo II, esta falta de aderência pode ser explicada quando são analisados vários aspectos no que se refere a operação e a atuação de mecanismos de corrosão em feixes tubulares de permutadores de calor: Intensidades diferenciadas de processos corrosivos em passes distintos, mecanismos de corrosão distintos que produzam taxas de desgaste semelhante externa e internamente aos tubos, variações no processo que proporcionem alterações nos fenômenos corrosivos. Para avaliar o ajuste dos valores medidos à curva de distribuição empregamos os métodos gráficos PP-Plot e QQ-plot e para determinar os parâmetros necessários a curva de distribuição utilizamos a estimação de máxima verossimilhança. No método de cálculo I o tamanho da amostragem necessária para a probabilidade de obtenção desejada varia de forma não linear com o número de tubos do feixe e com o percentual de tubos de interesse, em geral não há um aumento significativo na probabilidade de obtenção de uma medida em percentuais de interesse acima de 4% dos tubos presentes no feixe. O método de cálculo II possui aplicabilidade apenas em feixe com no mínimo 600 tubos e pode apresenta erro na estimativa de até ± 0,2mm, para feixes com 1500 tubos o erro máximo varia com o período de retorno utilizado e pode alcançar valores entre ±0,3. / Increased operational reliability is responsible for security in lifting industrial plants as well as the reduction of costs with maintenance, inspection engineers, in many cases, using techniques of inspection and sampling by complementing these tests employ statistical methods to make extrapolations of the results from tests for the equipment as a whole. We propose in this study two methods of calculation that can be applied in the test results for IRIS that it is possible to estimate the maximum depth of pite in the tubular beam, the first method ,designated as of calculation method I, use the concepts of permutation in together with the delineation of sets of tubes of interest in obtaining the estimate of the lower thickness in the bundles. The second calculation method, calculation method II, is an adaptation of the method of calculating proposed by JSCE to estimate the depth of pite in the bundles, this method uses the distribution of values of thickness obtained in the test for using the concept of time return to perform more calculations to provide an estimate of the lowest measure of thickness in the bundles. The existing statistical methods of calculation used to estimate the thickness in smaller vessels and pipes is based on the adjustment of the values of thickness obtained by testing the distribution curves of previously established, it appears that this adjustment generally is not found for the data used in Calculation Method II, this lack of adherence may be explained when they are examined several aspects as regards the operation and performance of mechanisms of corrosion of bundles in heat exchangers: corrosion processes with different intensities in different passes, different mechanisms of corrosion that produce similar wear rates of the external and internal tubes, which provide variations in changes in corrosive phenomena. To assess the fit of the measured values of the distribution curve of the methods employed graphic Plot and PP-and QQ-plot, to determine the parameters needed to use the curve of distribution of maximum likelihood estimation. In the method of calculating the size of the sample I needed for the likelihood of achieving desired changes in a non-linear with the number of tubes of the bundle and the percentage of tubes of interest, in general there is a significant increase in the probability of obtaining a measured in percentage of interest above 4% of the tubes in the bundle. The calculation method II has applicability only to bundles with at least 600 tubes and may make the estimation error of up to ± 0.2 mm for bundles with 1,500 pipes the maximum error varies with the period of return used and can reach values between ± 0 3.
15

Aplicação de métodos estatísticos para a estimativa da menor espessura presente em tubos de feixes tubulares de permutadores de calor

Lima, Fábio Moreira January 2009 (has links)
O aumento da confiabilidade operacional é responsável pela elevação da segurança em plantas industriais assim como, pela redução de custos com manutenção. Engenheiros de inspeção, em muitos casos, utilizam métodos estatísticos que possibilitam a execução de inspeção por amostragem, nestes casos extrapolações dos resultados obtidos nos ensaios devem ser feitas para a partir daí estimar as condições físicas do equipamento como um todo. Propomos neste estudo dois métodos de cálculo que quando aplicados nos resultados de ensaio IRIS se possa estimar a menor espessura presente no feixe tubular. O primeiro método, designado como método de cálculo I, utiliza os conceitos de arranjo simples em conjunto com a delimitação do grupo de tubos de interesse na obtenção da estimativa da menor espessura presente no feixe tubular. O segundo método de cálculo, método de cálculo II, consiste em uma adaptação do método de cálculo proposto pela JSCE para a estimação da profundidade de pite no feixe, este método utiliza a distribuição dos valores de espessuras obtidos no ensaio, para através do conceito de período de retorno realizar cálculos que proporcionem obter uma estimativa da menor medida de espessura presente no feixe. Os métodos de cálculo estatísticos existentes utilizados na estimativa de menores espessuras em vasos e tubulações se baseia no ajuste dos valores de espessura obtidos por ensaios à curvas de distribuição previamente estabelecidas, verifica-se que este ajuste em geral não é encontrado para os dados utilizados no método de cálculo II, esta falta de aderência pode ser explicada quando são analisados vários aspectos no que se refere a operação e a atuação de mecanismos de corrosão em feixes tubulares de permutadores de calor: Intensidades diferenciadas de processos corrosivos em passes distintos, mecanismos de corrosão distintos que produzam taxas de desgaste semelhante externa e internamente aos tubos, variações no processo que proporcionem alterações nos fenômenos corrosivos. Para avaliar o ajuste dos valores medidos à curva de distribuição empregamos os métodos gráficos PP-Plot e QQ-plot e para determinar os parâmetros necessários a curva de distribuição utilizamos a estimação de máxima verossimilhança. No método de cálculo I o tamanho da amostragem necessária para a probabilidade de obtenção desejada varia de forma não linear com o número de tubos do feixe e com o percentual de tubos de interesse, em geral não há um aumento significativo na probabilidade de obtenção de uma medida em percentuais de interesse acima de 4% dos tubos presentes no feixe. O método de cálculo II possui aplicabilidade apenas em feixe com no mínimo 600 tubos e pode apresenta erro na estimativa de até ± 0,2mm, para feixes com 1500 tubos o erro máximo varia com o período de retorno utilizado e pode alcançar valores entre ±0,3. / Increased operational reliability is responsible for security in lifting industrial plants as well as the reduction of costs with maintenance, inspection engineers, in many cases, using techniques of inspection and sampling by complementing these tests employ statistical methods to make extrapolations of the results from tests for the equipment as a whole. We propose in this study two methods of calculation that can be applied in the test results for IRIS that it is possible to estimate the maximum depth of pite in the tubular beam, the first method ,designated as of calculation method I, use the concepts of permutation in together with the delineation of sets of tubes of interest in obtaining the estimate of the lower thickness in the bundles. The second calculation method, calculation method II, is an adaptation of the method of calculating proposed by JSCE to estimate the depth of pite in the bundles, this method uses the distribution of values of thickness obtained in the test for using the concept of time return to perform more calculations to provide an estimate of the lowest measure of thickness in the bundles. The existing statistical methods of calculation used to estimate the thickness in smaller vessels and pipes is based on the adjustment of the values of thickness obtained by testing the distribution curves of previously established, it appears that this adjustment generally is not found for the data used in Calculation Method II, this lack of adherence may be explained when they are examined several aspects as regards the operation and performance of mechanisms of corrosion of bundles in heat exchangers: corrosion processes with different intensities in different passes, different mechanisms of corrosion that produce similar wear rates of the external and internal tubes, which provide variations in changes in corrosive phenomena. To assess the fit of the measured values of the distribution curve of the methods employed graphic Plot and PP-and QQ-plot, to determine the parameters needed to use the curve of distribution of maximum likelihood estimation. In the method of calculating the size of the sample I needed for the likelihood of achieving desired changes in a non-linear with the number of tubes of the bundle and the percentage of tubes of interest, in general there is a significant increase in the probability of obtaining a measured in percentage of interest above 4% of the tubes in the bundle. The calculation method II has applicability only to bundles with at least 600 tubes and may make the estimation error of up to ± 0.2 mm for bundles with 1,500 pipes the maximum error varies with the period of return used and can reach values between ± 0 3.
16

Avaliação da inspeção não intrusiva realizada em vaso separador e suas implicações no programa de inspeção do equipamento

Resende, Arthur Tomas de January 2009 (has links)
O presente trabalho avalia a viabilidade de execução de técnicas não intrusivas de inspeção em dois vasos separadores de produção. Para tanto a guia de inspeção não intrusiva DNV-RP-G103 foi seguida para a realização do planejamento de inspeção dos equipamentos. Foi realizado um estudo dos mecanismos de deterioração atuantes a partir dos relatórios de inspeção visual interna. A efetividade do plano de inspeção é avaliada pelo uso de um modelo matemático que utiliza a Simulação de Monte Carlo para a avaliação da probabilidade de detecção das descontinuidades e determinação da probabilidade de falha do equipamento antes e após a realização da inspeção. Estudos de probabilidade de detecção de trincas de fadiga por técnicas de inspeção não intrusiva realizados são abordados na revisão bibliográfica. Esses dados são de relevância para a obtenção dos parâmetros necessários para avaliar a efetividade das técnicas de inspeção proposta. / The present work evaluates the viability of non invasive inspection technique of two production pressure vessel. The non invasive inspection guide DNV-RP-G103 was applied for equipment inspection plan realization. The equipment aging process study was done according to the inspections reports of internal visual inspection previously done. The plan inspection affectivity is evaluated with a mathematic model that applies The Monte Carlo Simulation for calculate the discontinuity probability detection and determine the equipment failure probability before and after inspection realization. Detection probability study of fatigue cracks by non invasive techniques is revised in bibliographic review. This data are pertinent for obtain the needed parameters to reach the required effectiveness of inspection technique planned.
17

Avaliação da inspeção não intrusiva realizada em vaso separador e suas implicações no programa de inspeção do equipamento

Resende, Arthur Tomas de January 2009 (has links)
O presente trabalho avalia a viabilidade de execução de técnicas não intrusivas de inspeção em dois vasos separadores de produção. Para tanto a guia de inspeção não intrusiva DNV-RP-G103 foi seguida para a realização do planejamento de inspeção dos equipamentos. Foi realizado um estudo dos mecanismos de deterioração atuantes a partir dos relatórios de inspeção visual interna. A efetividade do plano de inspeção é avaliada pelo uso de um modelo matemático que utiliza a Simulação de Monte Carlo para a avaliação da probabilidade de detecção das descontinuidades e determinação da probabilidade de falha do equipamento antes e após a realização da inspeção. Estudos de probabilidade de detecção de trincas de fadiga por técnicas de inspeção não intrusiva realizados são abordados na revisão bibliográfica. Esses dados são de relevância para a obtenção dos parâmetros necessários para avaliar a efetividade das técnicas de inspeção proposta. / The present work evaluates the viability of non invasive inspection technique of two production pressure vessel. The non invasive inspection guide DNV-RP-G103 was applied for equipment inspection plan realization. The equipment aging process study was done according to the inspections reports of internal visual inspection previously done. The plan inspection affectivity is evaluated with a mathematic model that applies The Monte Carlo Simulation for calculate the discontinuity probability detection and determine the equipment failure probability before and after inspection realization. Detection probability study of fatigue cracks by non invasive techniques is revised in bibliographic review. This data are pertinent for obtain the needed parameters to reach the required effectiveness of inspection technique planned.
18

Aplicação de métodos estatísticos para a estimativa da menor espessura presente em tubos de feixes tubulares de permutadores de calor

Lima, Fábio Moreira January 2009 (has links)
O aumento da confiabilidade operacional é responsável pela elevação da segurança em plantas industriais assim como, pela redução de custos com manutenção. Engenheiros de inspeção, em muitos casos, utilizam métodos estatísticos que possibilitam a execução de inspeção por amostragem, nestes casos extrapolações dos resultados obtidos nos ensaios devem ser feitas para a partir daí estimar as condições físicas do equipamento como um todo. Propomos neste estudo dois métodos de cálculo que quando aplicados nos resultados de ensaio IRIS se possa estimar a menor espessura presente no feixe tubular. O primeiro método, designado como método de cálculo I, utiliza os conceitos de arranjo simples em conjunto com a delimitação do grupo de tubos de interesse na obtenção da estimativa da menor espessura presente no feixe tubular. O segundo método de cálculo, método de cálculo II, consiste em uma adaptação do método de cálculo proposto pela JSCE para a estimação da profundidade de pite no feixe, este método utiliza a distribuição dos valores de espessuras obtidos no ensaio, para através do conceito de período de retorno realizar cálculos que proporcionem obter uma estimativa da menor medida de espessura presente no feixe. Os métodos de cálculo estatísticos existentes utilizados na estimativa de menores espessuras em vasos e tubulações se baseia no ajuste dos valores de espessura obtidos por ensaios à curvas de distribuição previamente estabelecidas, verifica-se que este ajuste em geral não é encontrado para os dados utilizados no método de cálculo II, esta falta de aderência pode ser explicada quando são analisados vários aspectos no que se refere a operação e a atuação de mecanismos de corrosão em feixes tubulares de permutadores de calor: Intensidades diferenciadas de processos corrosivos em passes distintos, mecanismos de corrosão distintos que produzam taxas de desgaste semelhante externa e internamente aos tubos, variações no processo que proporcionem alterações nos fenômenos corrosivos. Para avaliar o ajuste dos valores medidos à curva de distribuição empregamos os métodos gráficos PP-Plot e QQ-plot e para determinar os parâmetros necessários a curva de distribuição utilizamos a estimação de máxima verossimilhança. No método de cálculo I o tamanho da amostragem necessária para a probabilidade de obtenção desejada varia de forma não linear com o número de tubos do feixe e com o percentual de tubos de interesse, em geral não há um aumento significativo na probabilidade de obtenção de uma medida em percentuais de interesse acima de 4% dos tubos presentes no feixe. O método de cálculo II possui aplicabilidade apenas em feixe com no mínimo 600 tubos e pode apresenta erro na estimativa de até ± 0,2mm, para feixes com 1500 tubos o erro máximo varia com o período de retorno utilizado e pode alcançar valores entre ±0,3. / Increased operational reliability is responsible for security in lifting industrial plants as well as the reduction of costs with maintenance, inspection engineers, in many cases, using techniques of inspection and sampling by complementing these tests employ statistical methods to make extrapolations of the results from tests for the equipment as a whole. We propose in this study two methods of calculation that can be applied in the test results for IRIS that it is possible to estimate the maximum depth of pite in the tubular beam, the first method ,designated as of calculation method I, use the concepts of permutation in together with the delineation of sets of tubes of interest in obtaining the estimate of the lower thickness in the bundles. The second calculation method, calculation method II, is an adaptation of the method of calculating proposed by JSCE to estimate the depth of pite in the bundles, this method uses the distribution of values of thickness obtained in the test for using the concept of time return to perform more calculations to provide an estimate of the lowest measure of thickness in the bundles. The existing statistical methods of calculation used to estimate the thickness in smaller vessels and pipes is based on the adjustment of the values of thickness obtained by testing the distribution curves of previously established, it appears that this adjustment generally is not found for the data used in Calculation Method II, this lack of adherence may be explained when they are examined several aspects as regards the operation and performance of mechanisms of corrosion of bundles in heat exchangers: corrosion processes with different intensities in different passes, different mechanisms of corrosion that produce similar wear rates of the external and internal tubes, which provide variations in changes in corrosive phenomena. To assess the fit of the measured values of the distribution curve of the methods employed graphic Plot and PP-and QQ-plot, to determine the parameters needed to use the curve of distribution of maximum likelihood estimation. In the method of calculating the size of the sample I needed for the likelihood of achieving desired changes in a non-linear with the number of tubes of the bundle and the percentage of tubes of interest, in general there is a significant increase in the probability of obtaining a measured in percentage of interest above 4% of the tubes in the bundle. The calculation method II has applicability only to bundles with at least 600 tubes and may make the estimation error of up to ± 0.2 mm for bundles with 1,500 pipes the maximum error varies with the period of return used and can reach values between ± 0 3.
19

Aplicação da inspeção não intrusiva em equipamentos do sistema de dessulfurização de gás natural da plataforma de Pampo

Sampaio, Marcus Vinicius Cruz January 2009 (has links)
Este trabalho apresenta os resultados da aplicação da metodologia de inspeção não intrusiva (INI) em equipamentos do sistema de dessulfurização de gás numa plataforma petrolífera, com o auxílio da inspeção baseada em risco utilizando a norma API RP 581. A inspeção não intrusiva é aplicada tendo como fundamentos as guias de inspeção, como a DNV-RP-G103, que reúne informações de como executar e justificar o seu uso, a fim de garantir a segurança das instalações, eliminando a necessidade de uma parada do equipamento para a realização da inspeção. Contudo nem todos os equipamentos puderam ser inspecionados por esta metodologia, devido a limitações operacionais e/ou construtivas. O trabalho conclui que a inspeção não intrusiva pode ser aplicada à inspeção de equipamentos sem prejuízo ao mapa de risco do equipamento ou da unidade, e naqueles onde não é possível à utilização somente da metodologia, a mesma poderá ser aplicada em conjunto com a inspeção convencional fornecendo informações importantes sobre o estado do equipamento, melhorando assim a confiabilidade do planejamento da parada de manutenção e uma redução dos custos envolvidos. / This paper presents the results of applying the methodology of non-intrusive inspection (INI) in electrical system flue gas desulphurization an oil rig, with the help of riskbased inspection using the API RP 581. The non-intrusive inspection is implemented with the guides as the foundations of inspection, such as DNV-RP-G103, which gathers information on how to make and justify its use, to ensure the safety of installations, eliminating the need for a parade equipment to perform the inspection. However not all equipment could be inspected by this method, due to operational limitations and / or constructive. The paper concludes that the non-intrusive inspection can be applied to inspection of equipment subject to the risk map of the equipment or unit, and those where it is not possible to use only the methodology, it may be applied along with conventional inspection providing important information on the status of the equipment, thereby improving the reliability of planning maintenance shutdown and lower costs.
20

Desenvolvimento de um método para o planejamento da inspeção de equipamentos

Teles, Camila Duarte January 2007 (has links)
Este trabalho tem como objetivo desenvolver um método para o planejamento da inspeção de equipamentos instalados em grandes quantidades e em extensas áreas geográficas. Para tanto, a dissertação apresenta inicialmente tópicos referentes a amostragem, que constitui a base do método desenvolvido, e inspeção de produtos e equipamentos. O método proposto é dividido em três fases, as quais são subdivididas em etapas que apresentam as atividades a serem realizadas. A Fase 1 denomina-se elaboração da matriz amostral e visa identificar quais e quantos equipamentos devem ser inspecionados. A Fase 2, intitulada distribuição da matriz amostral no tempo, tem como objetivo determinar quando os equipamentos devem ser inspecionados. A Fase 3, designada alocação dos recursos humanos para execução da matriz amostral, visa estabelecer quem deve inspecionar os equipamentos. Após seu desenvolvimento, o método foi aplicado em uma empresa do setor de distribuição de energia elétrica, para auxiliar no planejamento da inspeção de seus medidores de energia elétrica. Por fim, realizou-se a avaliação do método, através de entrevistas individuais com três especialistas da empresa. De acordo com os mesmos, o método é exeqüível, fácil de ser aplicado e possivelmente será implantado na empresa. Além disso, soluciona, se implantado, o problema referente ao desconhecimento do desempenho dos medidores instalados em seu parque de medição, que têm impacto direto sobre o faturamento da empresa. / The objective of this work is to develop a method for the inspection planning of equipments installed at great quantity and extensive geographical areas. Initially, some topics regarding sampling, which constitutes the base of the developed method, and inspection of products and equipment are presented. The proposed method is divided in three phases, which are subdivided in stages that present the activities to be accomplished. Phase 1 is called elaboration of the sampling matrix, aiming the identification of the equipments to be inspected. Phase 2, named time distribution of the sampling matrix, determines when the equipment must be inspected. Phase 3, designated allocation of the human resources for execution of the sampling matrix, establishes who must inspect the equipments. After development, the method was applied at a company of electric power distribution segment, to assist the inspection planning of its electric energy meters. Finally, the method evaluation was carried out, through individual interviews, considering the opinion of three specialists of the company. According to the specialists, the method is feasible, easy to apply, and possibly it will be implanted by the company. Besides, if implanted, it solves the problem regarding the lack of knowledge concerning the meters installed in its concession area, which have direct impact on companies´ budget.