Spelling suggestions: "subject:"entegrated project delivery system"" "subject:"antegrated project delivery system""
1 |
Guidelines for scope of work in corporate office building design. / Diretrizes para escopo de serviços de projetos de arquitetura corporativa.Mariana Lopes Julião 27 November 2018 (has links)
Project process\' hindrances over office architectural design production are common at civil construction sector, implying on schedule loss, reworks and higher costs. Many academic literature approaches to that hindrance resulted from failure in project process. Predominantly failures concern translating customer needs and expectations into design conditions. This research objectives to propose scope of work guidelines, securing customer satisfaction and avoiding unforeseen additional costs, reworks, schedule and project benefit loss. Additionally, for each guideline proposed, it is suggested an accountable for it (project manager, architect or client). The adopted methodology was the research and analysis of project methodologies from academic literatures, contenting responsibilities definitions and design criteria that should be considered on the approved scope of work. Furthermore, the creation and implementation of an interview plan with one Brazilian high concept corporative architecture firm and its three clients, in a way that it is possible to measure client\'s point of view over contracted project process. Results from the interviews identified scope definition and project process planning hindrances. Then, in comparison with academic literatures, main project and scope of work issues were identified and used as base to the scope of work development guidelines. / A produção de projetos de arquitetura e engenharia no setor de construção civil apresenta entraves em seus processos de projeto, que implicam em perda de prazo, aumento de custos de projeto e retrabalhos. Diversos autores abordam falhas na gestão do processo de projeto, principalmente na interpretação das necessidades dos clientes e na definição dos critérios que o projeto deve seguir, alguns não previstos no escopo de contratação entre a empresa de arquitetura e o cliente. Esta pesquisa propõe diretrizes para que as empresas de arquitetura possam, junto ao gerente de projetos dos clientes, definir um escopo de serviços em que retrabalho, custos adicionais, atrasos e a insatisfação do cliente com o processo sejam reduzidos ou evitados. Para cada diretriz, há também a definição de quem é o responsável por executá-la (se o arquiteto ou o cliente). A metodologia utilizada para obtenção desse objetivo foi o levantamento e revisão de bibliografia sobre metodologias de projeto e de contratos de projetos, que auxiliem na definição de responsabilidades, atividades e critérios de projeto. Em acréscimo, foi formulado um roteiro de entrevista e eleita uma empresa de arquitetura corporativa com experiência de mercado no Brasil, assim como três clientes da mesma, de forma a mapear o ponto de vista do cliente sobre o processo empregado pela contratada. Com os resultados das entrevistas, fez-se uma análise comparativa entre os métodos de projeto empregados pela empresa de arquitetura e o encontrado em bibliografia, identificando os principais entraves no desenvolvimento e definição do escopo de serviços. Por fim, tais resultados foram utilizados como base para propor diretrizes para que o escopo de serviços entre arquitetos e clientes prevejam revisões de projeto, traduzam efetivamente as necessidades do cliente e atendam prazos e custos esperados.
|
2 |
Guidelines for scope of work in corporate office building design. / Diretrizes para escopo de serviços de projetos de arquitetura corporativa.Julião, Mariana Lopes 27 November 2018 (has links)
Project process\' hindrances over office architectural design production are common at civil construction sector, implying on schedule loss, reworks and higher costs. Many academic literature approaches to that hindrance resulted from failure in project process. Predominantly failures concern translating customer needs and expectations into design conditions. This research objectives to propose scope of work guidelines, securing customer satisfaction and avoiding unforeseen additional costs, reworks, schedule and project benefit loss. Additionally, for each guideline proposed, it is suggested an accountable for it (project manager, architect or client). The adopted methodology was the research and analysis of project methodologies from academic literatures, contenting responsibilities definitions and design criteria that should be considered on the approved scope of work. Furthermore, the creation and implementation of an interview plan with one Brazilian high concept corporative architecture firm and its three clients, in a way that it is possible to measure client\'s point of view over contracted project process. Results from the interviews identified scope definition and project process planning hindrances. Then, in comparison with academic literatures, main project and scope of work issues were identified and used as base to the scope of work development guidelines. / A produção de projetos de arquitetura e engenharia no setor de construção civil apresenta entraves em seus processos de projeto, que implicam em perda de prazo, aumento de custos de projeto e retrabalhos. Diversos autores abordam falhas na gestão do processo de projeto, principalmente na interpretação das necessidades dos clientes e na definição dos critérios que o projeto deve seguir, alguns não previstos no escopo de contratação entre a empresa de arquitetura e o cliente. Esta pesquisa propõe diretrizes para que as empresas de arquitetura possam, junto ao gerente de projetos dos clientes, definir um escopo de serviços em que retrabalho, custos adicionais, atrasos e a insatisfação do cliente com o processo sejam reduzidos ou evitados. Para cada diretriz, há também a definição de quem é o responsável por executá-la (se o arquiteto ou o cliente). A metodologia utilizada para obtenção desse objetivo foi o levantamento e revisão de bibliografia sobre metodologias de projeto e de contratos de projetos, que auxiliem na definição de responsabilidades, atividades e critérios de projeto. Em acréscimo, foi formulado um roteiro de entrevista e eleita uma empresa de arquitetura corporativa com experiência de mercado no Brasil, assim como três clientes da mesma, de forma a mapear o ponto de vista do cliente sobre o processo empregado pela contratada. Com os resultados das entrevistas, fez-se uma análise comparativa entre os métodos de projeto empregados pela empresa de arquitetura e o encontrado em bibliografia, identificando os principais entraves no desenvolvimento e definição do escopo de serviços. Por fim, tais resultados foram utilizados como base para propor diretrizes para que o escopo de serviços entre arquitetos e clientes prevejam revisões de projeto, traduzam efetivamente as necessidades do cliente e atendam prazos e custos esperados.
|
Page generated in 0.1187 seconds