• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 140
  • 2
  • 2
  • Tagged with
  • 144
  • 81
  • 35
  • 33
  • 32
  • 30
  • 28
  • 26
  • 23
  • 23
  • 19
  • 16
  • 15
  • 15
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
81

Software para planejamento operacional de lavra, simulação e despacho de caminhões visando ao atendimento das metas de produção e qualidade da mistura de minérios.

Destro, Elton January 2015 (has links)
Programa de Pós-Graduação em Engenharia de Materiais. Departamento de Engenharia Metalúrgica, Escola de Minas, Universidade Federal de Ouro Preto. / Submitted by Oliveira Flávia (flavia@sisbin.ufop.br) on 2015-12-21T16:31:39Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) TESE_SoftwarePlanejamentoOperacional .pdf: 3676365 bytes, checksum: ec22bb453959267c90170cf9a8c8911e (MD5) / Approved for entry into archive by Gracilene Carvalho (gracilene@sisbin.ufop.br) on 2016-01-13T15:53:25Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) TESE_SoftwarePlanejamentoOperacional .pdf: 3676365 bytes, checksum: ec22bb453959267c90170cf9a8c8911e (MD5) / Made available in DSpace on 2016-01-13T15:53:25Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) TESE_SoftwarePlanejamentoOperacional .pdf: 3676365 bytes, checksum: ec22bb453959267c90170cf9a8c8911e (MD5) Previous issue date: 2015 / O minério proveniente de uma única frente de lavra dificilmente possui as especificações exigidas pela Usina de Beneficiamento, mas, se for misturado ao minério de outras frentes, os parâmetros exigidos poderão ser atendidos. Esses parâmetros normalmente são estabelecidos pela indústria metalúrgica, que necessita de matérias-primas adequadas para que seus produtos tenham qualidade elevada. Para que a mistura, após o beneficiamento, atenda às exigências e especificações definidas pelos processos metalúrgicos, algoritmos utilizados para Planejamento Operacional de Lavra, Simulação e Despacho de caminhões em minas a céu aberto foram implementados em um único aplicativo computacional de forma integrada, resultando nos três módulos do software TSMine (Truck-Shovel System for Surface Mine). O primeiro módulo é responsável pela otimização e visa fornecer as soluções (ou cenários) resultantes do Planejamento Operacional de Lavra. Cada cenário é caracterizado pela alocação dos equipamentos de carga, definição do ritmo de lavra e do número de viagens que cada caminhão deverá realizar para transportar o minério e o estéril. As metaheurísticas Iterated Local Search e Variable Neighborhood Descent foram implementadas de forma combinada nesta fase de otimização. A avaliação e validação da solução metaheurística são feitas pelo segundo módulo (Simulação pelo Método de Monte Carlo), que apresenta um relatório com as medidas de desempenho do sistema simulado (resultados da simulação). Técnicas estatísticas são utilizadas para validar ou não o cenário simulado. O terceiro módulo é um Sistema de Despacho que, em um cenário real, é responsável pela alocação dos caminhões às frentes de lavra buscando reproduzir as operações do cenário validado na simulação. A utilização do TSMine busca viabilizar misturas de minérios para que possam ser utilizadas nos processos metalúrgicos, reduzir custos operacionais, aumentar a produção da mina devido a maior eficiência na alocação dos equipamentos de carga e transporte, e manter as especificações da mistura dentro dos limites estabelecidos pelos clientes. ______________________________________________________________________________________ / ABSTRACT: It is barely expected that the ore from a single work bench possess the required specifications by the Beneficiation Plant, but, if it be blended to the ore from different work benches, the demanded parameters can be met. These parameters are usually established by the metallurgical industry, which needs appropriate raw materials so that their products have high quality. In order that the blend, after mineral processing, matches the demands and specifications defined by the metallurgical processes, algorithms used for Operational Planning, Simulation and Truck Dispatching in open-pit mines were implemented in an integrated manner (a single computer program), resulting in the three modules of the optimizing software for truck dispatching TSMine (Truck-Shovel System for Surface Mine). The Operational Planning is performed by using the first module and sets the scenario that will be reproduced by the truck dispatching module. Each scenario is characterized by the loading units allocation and their production rate besides defining the number of trips that each haulage unit will accomplish to each shovel. The Iterated Local Search and Variable Neighborhood Descent Metaheuristics are used in this optimization phase. The evaluation and validation of the metaheuristic scenario is done by using the second module (Monte Carlo Stochastic Simulation), which displays a report with the measures of system performance (simulation output). Next, statistical techniques were used for validating (or not) the operational plan. The third module is a Truck Dispatching System that, in the real life, it will assign the truck to a shovel reproducing as nigh as possible the operations of the validated scenario. With the use of the TSMine, it is intended to reduce the operating costs, to increase the mine production through the improvement in the truck and shovel assignment efficiency and to maintain the mixture specifications within the limits established by the Beneficiation Plant so that it can be used in the metallurgical processes.
82

Estudos para o aumento da vida útil das minas de minério de ferro do Quadrilátero Ferrífero, MG.

Omachi, Geraldo Yasujiro January 2015 (has links)
Programa de Pós-Graduação em Engenharia Mineral. Departamento de Engenharia de Minas. Escola de Minas, Universidade Federal de Ouro Preto. / Submitted by Oliveira Flávia (flavia@sisbin.ufop.br) on 2016-01-27T16:54:41Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) DISSERTAÇÃO_EstudosAumentoVida.pdf: 3824253 bytes, checksum: c1f680d3bc47011f5af8b486e2e990df (MD5) / Approved for entry into archive by Oliveira Flávia (flavia@sisbin.ufop.br) on 2016-01-27T18:28:01Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) DISSERTAÇÃO_EstudosAumentoVida.pdf: 3824253 bytes, checksum: c1f680d3bc47011f5af8b486e2e990df (MD5) / Made available in DSpace on 2016-01-27T18:28:01Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) DISSERTAÇÃO_EstudosAumentoVida.pdf: 3824253 bytes, checksum: c1f680d3bc47011f5af8b486e2e990df (MD5) Previous issue date: 2015 / O Quadrilátero Ferrífero (Q.F.) sempre foi a principal província mineral produtora de minério de ferro no Brasil. Em função da necessidade de matéria prima mineral para a indústria siderúrgica nacional e internacional, principalmente os mercados asiático e europeu, a exploração de minérios hematíticos (material de baixo custo de lavra, alto teor de ferro e baixo teor de contaminantes) foi o grande diferencial para atender a crescente demanda. Porém, com o processo de exaustão do minério de alto teor de ferro e a necessidade em atender o mercado transoceânico do minério de ferro, tornou-se imprescindível a lavra de materiais itabiríticos (baixo teor de ferro) para a continuidade das minas em operação. Este trabalho foi proposto visando analisar as possibilidades de aumento da vida útil das minas de minério de ferro do Q.F. em Minas Gerais. Estado este em que a mineração contribuiu e continua contribuindo significativamente para o desenvolvimento das regiões impactadas direta (áreas de cava e beneficiamento) e indiretamente (municípios em torno, áreas de ferrovias e portos). Para ilustrar a argumentação proposta foi realizado um estudo comparativo real entre um Plano Diretor de Lavra (PDL) de material hematítico e o PDL de material itabirítico para uma mesma mina em diferentes épocas, com base em seus respectivos Planos de Aproveitamento Econômico (PAE´s). Ainda, foi realizado o levantamento do IDHM (Índice de Desenvolvimento Humano Municipal), dos principais municípios produtores de minério de ferro e o impacto da CFEM (Compensação Financeira pela Exploração de Recursos Minerais) nos atuais orçamentos municipais para comprovar a importância desse empreendimento econômico nos municípios produtores. A partir desse estudo procura-se demonstrar a viabilidade do aumento da vida útil das minas de minério de ferro, estendendo os benefícios da continuação da atividade mineradora para toda a sociedade de uma forma sustentável. É o que se pretende demonstrar nessa dissertação. Palavras chaves: minério de ferro, vida útil da mina, sustentabilidade na mineração, Índice de Desenvolvimento Humano Municipal. ______________________________________________________________________________________________ / ABSTRACT: The Quadrilátero Ferrífero (Q.F.) has always been the principal iron ore producer for Brazil. In function of the need for this raw material for the national and international metallurgies, mainly in the European and Asiatic markets, the exploitation of hematitic ore (low-cost mining material with high iron/low contaminant ratio) has been a great differential for attending this growing demand. However, with the increasing exhaustion of high-content iron ore, in order to attend the needs of the transoceanic market for iron ore, the mining of itabiritic ore (low iron content ore) has become inevitable for mining operations to continue. The objective of this study was to analyze the possibility of increasing the useful life of the iron ore mines in the Quadrilátero Ferrífero in Minas Gerais, state, Brazil, where mining operations significantly contribute to the development of regions that are directly impacted (pit and processing areas) and indirectly impacted (surrounding municipalities, railroads and ports). To achieve this objective, a comparative study between actual Directional Mining Plans for hematite and itabirite material was performed for the same mine at different periods, based on its respective Economic Exploitation Plans (EEP). Furthermore, a Municipal Human Development Index (MHDI) survey was done in the main iron ore producing municipalities and another survey was done for the impact of Financial Compensation for Mineral Reserve Exploration (FCMRE) on the current municipal budgets in order to demonstrate the importance of the economic endeaver to the producing municipalities. With the results of this study, the goal is to demonstrate the feasibility of increasing the useful life of the iron ore mines, extending the benefits for all of society with the continuation of the mining activities in a sustainable manner. It is this that I pretend to demonstrate in this dissertation.
83

Estudo da efetividade de barreiras de amortecimento no controle de vibrações geradas pelo desmonte com explosivos em mina de carvão à céu aberto

Silva, Luís Antonio Abadi e January 2005 (has links)
Este trabalho apresenta o estudo da efetividade de barreiras de amortecimento para atenuar a vibração causada pela propagação de ondas sísmicas oriundas de detonações. A barreira consta de uma porção do terreno cujas características de propagação são modificadas artificialmente pela detonação de uma linha de furos com parâmetros idênticos aos dos furos de produção. Os resultados obtidos demonstram a efetividade deste recurso, evidenciado pelo coeficiente de redução entre os valores de vibração gerados em situações com e sem o uso de barreira (0,41) e também através da mudança dos coeficientes da equação de previsão via Distância Escalonada, possibilitando em escala de produção o aumento na carga máxima por tempo de retardo ( 4,9 % à 118,9% ), com redução de custos devido ao menor consumo de retardos por furo ( -5,7 % à - 40,7 % ). / This work shows a study of damping screens effectiveness to attenuate the vibration caused by blast seismic waves. The screen is a portion of the ground which propagation characteristics are artificially changed by one row of blasted holes with the same parameters of the production holes. The achieved results schow the effectiveness, evidenced for the reduction coeficcients between vibration levels generated in situations with and without screens (-41 %) and also by the change of the scaled distance equation coefficients, allowing in production activity the maximum charge per delay increase (4,9 % à 118,9%), with cost reduction due the lower delay per hole consume (-5,7 % à -40,7 %).
84

Longwall : estado da arte, geomecânica, planejamento e aplicação

Cardozo, Fernando Alves Cantini January 2015 (has links)
Devido ao esgotamento de jazidas economicamente lavráveis a céu aberto, migrou-se para a lavra subterrânea. Porém, como isso é uma prática antiga, alguns métodos de lavra subterrânea deixaram de ser economicamente viáveis devido ao aprofundamento da lavra. Um exemplo disso é a lavra de carvão no sul do Brasil, onde jazidas exploradas a céu aberto ou mesmo pelo método de Câmaras e Pilares, começam a vislumbrar seu exaurimento técnico de lavra, por altos custos e baixa produtividade, o que norteia a busca por alternativas econômicas mais lucrativas. Uma destas alternativas é o método Longwall, praticamente desconhecido no Brasil, porém com crescente e não nova intenção de implementação no país. Isso já se refletiu em tentativas de operações e em novos estudos conceituais de viabilidade para o estado do Rio Grande do Sul. Estes fatores justificaram este estudo que teve por objetivo lançar luz sobre a lavra de carvão pelo método de Longwall, de modo a respaldar a sua implementação no Brasil. Sendo assim, o método foi descrito com enfoque em seus principais pontos, tais como, geomecânica e planejamento; além de apresentar estudos conceituais de lavra em dois cenários. O primeiro projeto conceitual apresenta um cenário tradicional objetivando implementação no Rio Grande do Sul; o segundo, tem por objetivo apresentar relativa flexibilidade do método, adaptando-o a um cenário não tradicional. Concluiu-se com este trabalho que fatores como geomecânica e correto planejamento de lavra são imprescindíveis para o sucesso da implementação do método. A partir dos resultados do estudo conceitual I e da versatilidade proposta no estudo II se justifica o aprofundamento nos estudos de operações por Longwall no país. / Due to the exhaustion of economically mining deposits, migrated to the underground mining. However, as this is an ancient practice, some underground mining methods are no longer economically viable due to the deepening of the mining. An example of this is the mining of coal in southern Brazil, where deposits exploited opencast or even by the Room and Pillars, begin to envision your fatigue, mining technical high costs and low productivity, which guides the search for more profitable economic alternatives. One of these alternatives is the Longwall method, virtually unknown in Brazil, but with growing and not new intention of implementation in the country. It already was reflected in attempts to operations and on new conceptual studies of feasibility for the state of Rio Grande do Sul. These factors justify this study that aimed to shed light on the mining of coal by Longwall method, in order to support its implementation in Brazil. Therefore, the method has been described with focus on its key points, such as, geomechanics and planning; In addition to presenting conceptual studies of raging in two scenarios. The first conceptual design features a traditional setting with the objective of implementation in the Rio Grande do Sul; the second aims to introduce on the flexibility method, adapting it to a non-traditional setting. This work concluded that factors like geomechanics and correct planning of mining are indispensable for the successful implementation of the method. From the results of the study and conceptual versatility proposal in study II justification the deepening in the studies of Longwall operations in the country.
85

Influência do nível freático no sequenciamento de lavra aplicado ao planejamento estratégico de lavra

Fontes, Marcélio Prado January 2016 (has links)
Desenvolver o sequenciamento de mina envolve muitos fatores e uma grande quantidade de informações, consequentemente, a rentabilidade do projeto dependerá fortemente do cronograma de produção. Um projeto de mineração pode estar condicionado ao sequenciamento não ideal, o que afeta os resultados econômicos do projeto e também leva a uma utilização inadequada dos recursos minerais. Durante o sequenciamento da mina é necessário tomar decisões para cada bloco durante a extração, tais como: 1) Se um determinado bloco deve ou não ser minerado; 2) Se minerado, quando deveria ser extraído; 3) Uma vez extraído, como e quando deve ser processado. Essas decisões são fatores variáveis do fluxo de caixa que afetam um dado projeto. Via de regra, o limite da cava final é otimizado para um conjunto fixo de parâmetros (preço, custos, modelos de recursos etc.), sabendo que mudanças nesses parâmetros terão impactos sobre a vida do projeto. Incertezas são avaliadas apenas em analises de sensibilidade posteriores. O método convencional de sequenciar uma mina é dividido em três etapas principais: primeiro, delinear a cava final; segundo, dividir a cava final em pushbacks (avanços de lavra) e terceiro, definir os blocos do sequenciamento em cada um desses pushbacks levando em consideração a mina, a planta de processamento e as capacidades de mercado. Contudo, existem aspectos que não são geralmente incorporados no sequenciamento de produção como inclusão de minério abaixo do nível freático. Esse aspecto, por exemplo, impõe algumas limitações de avanços verticais que devem ser consideradas. O objetivo deste estudo é demonstrar a relevância e o impacto do lençol freático como restrição adicional no resultado do VPL (Valor Presente Líquido). Inclui-se como uma condição de contorno relacionada com a necessidade de rebaixamento do nível freático, considerando as variáveis: teor e relação estéril/minério no sequenciamento de uma mina de fosfato. A metodologia adotada consiste em fazer ajustes na determinação dos pushbacks dentro da cava final, respeitando as condições de contorno e perseguindo a rentabilidade global como objetivo principal do processo de otimização. / Developing mine sequencing involves many factors and a large amount of information, consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of mineral resources. During the mine sequencing it is necessary to make decisions for each block during extraction, such as: 1) If a particular block should or should not be mined; 2) If mined, when it should be extracted; 3) Once extracted, how and when it should be processed. These decisions are variable factors of cash flow that affect a given project. Normally, the final pit limit is optimized for a fixed set of parameters (price, costs, resource model, etc.), knowing that changes in these parameters will have impact on the life of mine plan. Uncertainties are held only in subsequent sensitivity analyzes. The conventional method of sequencing a mine is divided into three main steps: First the delineation of the final pit; second, subdividing the final pit in operational pushbacks (mining advances) and third, sequencing blocks in each of these pushbacks, taking into consideration the mine, processing plant and market capacities. However, there are aspects that are not usually incorporated into the production scheduling, including mining ore below the water table, this aspect imposes some vertical mining advancement constraints that must be considered. The objective of this study is to demonstrate the relevance and impact on the NPV result from the water level as a constraint related to the need for water table drawdown, also considering grades and stripping ratio variability during the mining sequence for a phosphate mine. The methodology adopted considers adjustments when determining each pushback within the limit of the final pit, trying to respect the constraints and pursuing global profitability as the main goal of the optimization process.
86

Uso de informação secundária imprecisa e inacurada no planejamento de curto prazo

Araújo, Cristina da Paixão January 2015 (has links)
No setor de mineração, a amostragem está presente no empreendimento mineral desde a fase da exploração até a lavra. Para diminuir a incerteza na previsão de teores, o planejamento de lavra requer adensamento da amostragem para garantir previsões acuradas e precisas. Acredita-se, que quanto maior a quantidade de amostras, maior a confiabilidade nas estimativa de teores. Na fase exploração, geralmente, a amostragem é realizada por furos de sondagem com coroas diamantadas, que é uma técnica com alto custo de execução e produz amostras com acuracidade e precisão. Nesta fase, existem poucos dados com alta qualidade. Já na fase operacional, a amostragem é realizada por outras técnicas devido a restrições orçamentárias e ao alto custo de execução da sondagem diamantada. Em geral, estas amostras possuem baixa qualidade (imprecisas e inacuradas) e não são submetidas a protocolos de controle que qualidade. Logo, nesta fase existem muitos dados com baixa qualidade com erro de vies e precisao. Esta dissertação avalia o impacto do uso de dados imprecisos no planejamento de curto prazo. Para isto, foram analisados dois bancos de dados distintos. O primeiro estudo utiliza o banco de dados exaustivo Walker Lake, que foi usado e considerado como o teor real do depósito. Inicialmente, as amostras foram obtidas a partir do conjunto de dados com espaçamento regular de 20×20 m e 5×5 m, a partir do banco de dados exaustivo. Um erro relativo de ±25% (imprecisão) e 10% de viés foram adicionados aos dados espaçados a 5×5 m (dados geológicos curto prazo) em diferentes cenários. Depois foram estudadas diferentes metodologias para incorporar a informação imprecisa nas estimativas. O segundo estudo é realizado em uma mina de ouro, com dois tipos de dados diferentes, a furos de sondagem (dados primários) e circulação reversa (dados secundários). Nestes estudos foram investigadas duas metodologias: cokrigagem e krigagem ordinária, e os dados foram utilizados para estimar blocos. As curvas teor tonelagem, análise de deriva e a classificação errônea dos blocos foram avaliadas para cada estudo. Para o banco de dados, Walker Lake, os resultados mostraram que o uso da cokrigagem ordinária estandardizada é a melhor metodologia em situações que existem dados imprecisos e enviesados, com boa correlação entre as variáveis primárias e secundárias. As estimativas produzidas são mais próximas da distribuição real dos blocos, reduzindo o erro de classificação dos blocos. Já para o banco de dados de Ouro, as amostras possuem moderada correlaçao e continuidade espacial curta para pequenas distâncias do depósito. Nesta situação, a correção da imprecisão da variável secundária utilizando a krigagem ordinária produziram melhores resultados com estimativas menos enviesadas e melhor classificação dos blocos como minério e estéril. / Decisions starting at mineral exploration through mining are based on grade block models obtained from samples. To decrease the uncertainty in the estimates, the short term mining planning requires additional sampling to ensure accurate and precise predictions. As more samples are made available, there is trend towards more reliable estimates. In the exploration stage, usually, sampling is performed by diamond drill holes (DDH), which are expensive but produces accurate and precise samples. In this stage there are few data with high quality. In the production stage, sampling is obtained by other techniques due to the high costs of DDHs. In general, these samples have low quality and are not controlled by QA / QC protocols. This study evaluates the impact of using imprecise data in short-term mineplanning. For this, it was analyzed two different data sets. The first case used the exhaustive Walker Lake dataset as the source to obtain the true and sampled grades. Initially, samples were obtained from the exhaustive dataset at regularly spaced grids at 20 × 20 m and 5 × 5 meters. A relative error (imprecision) of ± 25% and a 10% bias were added to the data spaced at 5 × 5 m (short-term geological data) in different scenarios. The second study is in a gold mine with two different types of data obtained from diamond drilling holes (DDH_Hard data) and reverse circulation (RC_Soft data).To combine these different types of data, two methodologies were investigated: cokriging and ordinary kriging. Both types of data were used to estimate a block model using the two methodologies. The grade tonnage curves and swath plots were used to compare the results against the true block grades at the same block support. In addition, the block misclassification was evaluated. In the Walker Lake the results show that standardized ordinary cokriging is a better methodology for imprecise and biased data and produces estimates closer to the true grade block distribution, reducing block misclassification. For the data set at the underground mine gold, the samples had moderate correlation and short spatial continuity for small distances at this deposit. In this situation, the estimates using ordinary kriging with hard and soft data (standardized and re-escaled) produced better results with less bias and better blocks classification of ore and waste.
87

Estudo da efetividade de barreiras de amortecimento no controle de vibrações geradas pelo desmonte com explosivos em mina de carvão à céu aberto

Silva, Luís Antonio Abadi e January 2005 (has links)
Este trabalho apresenta o estudo da efetividade de barreiras de amortecimento para atenuar a vibração causada pela propagação de ondas sísmicas oriundas de detonações. A barreira consta de uma porção do terreno cujas características de propagação são modificadas artificialmente pela detonação de uma linha de furos com parâmetros idênticos aos dos furos de produção. Os resultados obtidos demonstram a efetividade deste recurso, evidenciado pelo coeficiente de redução entre os valores de vibração gerados em situações com e sem o uso de barreira (0,41) e também através da mudança dos coeficientes da equação de previsão via Distância Escalonada, possibilitando em escala de produção o aumento na carga máxima por tempo de retardo ( 4,9 % à 118,9% ), com redução de custos devido ao menor consumo de retardos por furo ( -5,7 % à - 40,7 % ). / This work shows a study of damping screens effectiveness to attenuate the vibration caused by blast seismic waves. The screen is a portion of the ground which propagation characteristics are artificially changed by one row of blasted holes with the same parameters of the production holes. The achieved results schow the effectiveness, evidenced for the reduction coeficcients between vibration levels generated in situations with and without screens (-41 %) and also by the change of the scaled distance equation coefficients, allowing in production activity the maximum charge per delay increase (4,9 % à 118,9%), with cost reduction due the lower delay per hole consume (-5,7 % à -40,7 %).
88

Uso de informação secundária imprecisa e inacurada no planejamento de curto prazo

Araújo, Cristina da Paixão January 2015 (has links)
No setor de mineração, a amostragem está presente no empreendimento mineral desde a fase da exploração até a lavra. Para diminuir a incerteza na previsão de teores, o planejamento de lavra requer adensamento da amostragem para garantir previsões acuradas e precisas. Acredita-se, que quanto maior a quantidade de amostras, maior a confiabilidade nas estimativa de teores. Na fase exploração, geralmente, a amostragem é realizada por furos de sondagem com coroas diamantadas, que é uma técnica com alto custo de execução e produz amostras com acuracidade e precisão. Nesta fase, existem poucos dados com alta qualidade. Já na fase operacional, a amostragem é realizada por outras técnicas devido a restrições orçamentárias e ao alto custo de execução da sondagem diamantada. Em geral, estas amostras possuem baixa qualidade (imprecisas e inacuradas) e não são submetidas a protocolos de controle que qualidade. Logo, nesta fase existem muitos dados com baixa qualidade com erro de vies e precisao. Esta dissertação avalia o impacto do uso de dados imprecisos no planejamento de curto prazo. Para isto, foram analisados dois bancos de dados distintos. O primeiro estudo utiliza o banco de dados exaustivo Walker Lake, que foi usado e considerado como o teor real do depósito. Inicialmente, as amostras foram obtidas a partir do conjunto de dados com espaçamento regular de 20×20 m e 5×5 m, a partir do banco de dados exaustivo. Um erro relativo de ±25% (imprecisão) e 10% de viés foram adicionados aos dados espaçados a 5×5 m (dados geológicos curto prazo) em diferentes cenários. Depois foram estudadas diferentes metodologias para incorporar a informação imprecisa nas estimativas. O segundo estudo é realizado em uma mina de ouro, com dois tipos de dados diferentes, a furos de sondagem (dados primários) e circulação reversa (dados secundários). Nestes estudos foram investigadas duas metodologias: cokrigagem e krigagem ordinária, e os dados foram utilizados para estimar blocos. As curvas teor tonelagem, análise de deriva e a classificação errônea dos blocos foram avaliadas para cada estudo. Para o banco de dados, Walker Lake, os resultados mostraram que o uso da cokrigagem ordinária estandardizada é a melhor metodologia em situações que existem dados imprecisos e enviesados, com boa correlação entre as variáveis primárias e secundárias. As estimativas produzidas são mais próximas da distribuição real dos blocos, reduzindo o erro de classificação dos blocos. Já para o banco de dados de Ouro, as amostras possuem moderada correlaçao e continuidade espacial curta para pequenas distâncias do depósito. Nesta situação, a correção da imprecisão da variável secundária utilizando a krigagem ordinária produziram melhores resultados com estimativas menos enviesadas e melhor classificação dos blocos como minério e estéril. / Decisions starting at mineral exploration through mining are based on grade block models obtained from samples. To decrease the uncertainty in the estimates, the short term mining planning requires additional sampling to ensure accurate and precise predictions. As more samples are made available, there is trend towards more reliable estimates. In the exploration stage, usually, sampling is performed by diamond drill holes (DDH), which are expensive but produces accurate and precise samples. In this stage there are few data with high quality. In the production stage, sampling is obtained by other techniques due to the high costs of DDHs. In general, these samples have low quality and are not controlled by QA / QC protocols. This study evaluates the impact of using imprecise data in short-term mineplanning. For this, it was analyzed two different data sets. The first case used the exhaustive Walker Lake dataset as the source to obtain the true and sampled grades. Initially, samples were obtained from the exhaustive dataset at regularly spaced grids at 20 × 20 m and 5 × 5 meters. A relative error (imprecision) of ± 25% and a 10% bias were added to the data spaced at 5 × 5 m (short-term geological data) in different scenarios. The second study is in a gold mine with two different types of data obtained from diamond drilling holes (DDH_Hard data) and reverse circulation (RC_Soft data).To combine these different types of data, two methodologies were investigated: cokriging and ordinary kriging. Both types of data were used to estimate a block model using the two methodologies. The grade tonnage curves and swath plots were used to compare the results against the true block grades at the same block support. In addition, the block misclassification was evaluated. In the Walker Lake the results show that standardized ordinary cokriging is a better methodology for imprecise and biased data and produces estimates closer to the true grade block distribution, reducing block misclassification. For the data set at the underground mine gold, the samples had moderate correlation and short spatial continuity for small distances at this deposit. In this situation, the estimates using ordinary kriging with hard and soft data (standardized and re-escaled) produced better results with less bias and better blocks classification of ore and waste.
89

Influência da incerteza dos teores no planejamento de lavra aplicado ao sequenciamento de longo prazo

Cherchenevski, Pablo Koury January 2015 (has links)
O mapeamento da incerteza dos teores através de métodos de simulação geoestatística é uma metodologia que está começando a ser amplamente utilizada na indústria mineira. No entanto, o uso correto desse intervalo de incerteza para os processos subsequentes à avaliação de recursos ainda carece de entendimento e aplicação no setor industrial, onde o modelo de krigagem é empregado para o planejamento de mina. O sequenciamento da produção de longo prazo, com o objetivo de maximizar o Valor Presente Líquido (VPL), é uma das etapas mais importantes no planejamento de lavra e, portanto, o acesso à informação da variabilidade dos teores torna-se de grande importância permitindo a maximização dos lucros e da extração dos recursos. O objetivo deste estudo é avaliar o impacto da incerteza geológica no planejamento de lavra de modo a definir um sequenciamento a partir das simulações. Para isso ser alcançado, propõe-se uma análise probabilística incorporando as incertezas dos teores no sequenciamento de lavra, e quantificando, através de um índice de classificação proposto no estudo, os potenciais ganhos e riscos de perda associado a cada cenário sequenciado. O método de co-simulação por bandas rotativas é utilizado para gerar cenários equiprováveis. Em seguida, o sequenciamento de lavra é definido para cada cenário de teor simulado utilizando um software de otimização. Então, cada sequência de extração dos blocos obtida foi reavaliada para cada simulação de teor. Além disso, um índice de classificação é utilizado para definir o sequenciamento de lavra que gera o maior VPL. Por fim, é realizada uma comparação entre a opção de planejamento selecionada pela metodologia proposta e o modelo utilizado tradicionalmente na indústria obtido a partir de interpolações lineares (krigagem) dos teores. / Mapping grade uncertainty through geostatistical simulation is becoming widely used in the mining industry. However, the proper use of this uncertainty interval for subsequent decision making processes still lacks of understanding and use, where a grade kriging model is mostly employed for mine planning. The long-term scheduling aiming at maximizing Net Present Value (NPV) is one of the most important stages in mine planning, and therefore the assessment of grade variability is of great importance and allowing maximizing profit and resources extraction. The aim of this study is to evaluate the impact of geological uncertainty in mine planning in order to define the best scheduling given grade uncertainty derived from the simulations. For this to be achieved, it is proposed a probabilistic analysis incorporating grade uncertainties in the mining sequencing and quantifying, through a proposed classification index, the potential gains and risks of loss associated with each sequenced scenario. Turning bands algorithm is used to generate equally probable scenarios. Next, it is defined the mining sequence for each grade simulated scenario using an optimization software. Then, each block extraction sequence obtained is reevaluated for each grade simulation. Furthermore, a classification index is used to select the schedule which leads to the highest NPV. Finally, a comparison is performed with the selected schedule and the one obtained using the model traditionally used based on kriged grades.
90

Aprimoramento do controle de qualidade do minério no planejamento de lavra de curto prazo: estudo de caso. / Improvement of the quality control of mining en the planning of short term - cause study.

Faria Junior, Agenor de 11 December 2009 (has links)
Melhorar o conhecimento sobre o minério lavrado é um desafio enfrentado diariamente pelas empresas de mineração. O presente trabalho trata de um estudo realizado na mina de apatita, localizada na cidade de Cajati, interior do Estado de São Paulo, de propriedade da Bunge Fertilizantes S/A, onde são abordados temas relacionados ao planejamento de lavra de curto prazo, visando o aprimoramento dos procedimentos de coleta de amostras de pó-de-perfuratriz, que são sistematicamente coletadas com o objetivo de controle de qualidade da lavra, contribuindo para uma efetiva melhoria na gestão do planejamento de lavra e na tomada de decisões. Os resultados obtidos mostram que, da forma como as amostras são coletadas, ocorre um enriquecimento do teor de P2O5, podendo levar a tomada de decisões erradas por parte da operação da mina. / Improve knowledge of the ore mined is a challenge faced daily by mining companies. This paper is a study in apatite mine, located in the city of Cajati, within São Paulo,propriety of Bunge Fertilizantes S/A, where are treated issues related to short term planning of the mine to improve procedures for collecting dust samples drilling, which are systematically collected for the purpose of quality control of mining, contributing to an effective improvement in the management of planning of mining and decision making. The results show that the way the sampling is done, there is an enrichment of content in P2O5, which can lead to making wrong decisions by the operation of the mine.

Page generated in 0.04 seconds