• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 140
  • 2
  • 2
  • Tagged with
  • 144
  • 81
  • 35
  • 33
  • 32
  • 30
  • 28
  • 26
  • 23
  • 23
  • 19
  • 16
  • 15
  • 15
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Análise de estabilidade e deformação de cavidades em evaporitos pelo método dos elementos finitos

SILVA, Inaldo José Minervino da 04 August 2015 (has links)
Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2016-07-04T11:32:21Z No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) TESE_INALDO.pdf: 12292650 bytes, checksum: 47271b94bc4307fa96add30491036a09 (MD5) / Made available in DSpace on 2016-07-04T11:32:21Z (GMT). No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) TESE_INALDO.pdf: 12292650 bytes, checksum: 47271b94bc4307fa96add30491036a09 (MD5) Previous issue date: 2015-08-04 / CAPEs / Este trabalho tem por objetivo simular numericamente via método dos elementos finitos a deformabilidade e estabilidade geomecânica de lavras subterrâneas em evaporitos, considerando cenários de galerias executadas pelo método de câmaras e pilares e de escavação para estocagem de gás natural. Os evaporitos são economicamente importantes por serem fontes de matéria-prima para a fabricação de diversos produtos. A silvita é o mineral mais explorado para a produção de potássio, pois a sua estrutura química de cloreto simples favorece o seu aproveitamento industrial. No Brasil, a produção de potássio é realizada pela CVRD (Companhia Vale do Rio Doce) na mina de Taquari-Vassouras, que está localizada em Sergipe. Foi utilizado o modelo constitutivo mecanismo duplo de deformação com ativação térmica. Para validação do modelo constitutivo foi comparado resultados de simulações com resultados de medições, reais, de convergência de deformação, de câmaras do Painel D1. Foi estudado a possibilidade de influxo de água no Painel I5 e apresentou-se uma modelagem de um pilar 3D. Foi simulado, ainda, queda de blocos laterais e uma câmara para estocagem de gás natural. Para reproduzir os efeitos do processo de formação de fraturas, apresenta-se a técnica de fragmentação, a qual usa os elementos de interface para reproduzi-las. Onde os elementos regulares têm comportamento assumidamente de fluência e o comportamento dos elementos da região de interface é regido por um modelo constitutivo inelástico capaz de simular os fenômenos envolvidos no processo de degradação do material até a formação da fratura, como o modelo de dano. Tanto o modelo de dano como o modelo mecanismo duplo de deformação, de fluência estacionária, encontram-se implementados no programa, in-house, de elementos finitos CODE_BRIGHT (COupled DEformation BRIne Gas and Heat Transport). As análises apresentaram resultados consistentes, possibilitando o conhecimento do comportamento de fluência das rochas salinas, e seus efeitos, como subsidência, influxo de água, formações de chocos. Além disso, as análises demonstraram a viabilidade da aplicação da técnica de fratura em projetos de Engenharia com a aplicação da metodologia proposta. / This study aims to simulate numerically via the finite element method the deformability and geomechanical stability of underground mines in evaporites considering scenarios galleries performed by the method of room and pillar and digging for natural gas storage. The evaporites are economically important because they are sources of raw material for the manufacture of several products. The sylvite is the most explored mineral for potash production because its chemical structure simple chloride favors its industrial use. In Brazil, potash production is carried out by CVRD (Company Vale do Rio Doce) in the Taquari- Vassouras mine, which is located in Sergipe. We used the constitutive model dual mechanism of deformation with thermal activation. To validate the constitutive model was compared simulation results with measurement results, real, deformation convergence of the cameras of Panel D1. It studied the possibility of water inflow in Panel I5 and presented himself a modeling a pillar 3D. Was simulated also down side blocks and a camera for storage of natural gas. To reproduce the effects of the training process fractures, shows the fragmentation technique, which uses the interface elements to play them. Where regular elements have openly creep behavior and the behavior of the interface elements region is governed by an inelastic constitutive model able to simulate the phenomena involved in the material degradation process until the formation of the fracture, as the damage model. Any damage model as the model dual mechanism of deformation, creep stationary, are implemented in software, in-house finite element CODE_BRIGHT (Gas and Brine Deformation Coupled Heat Transport). The analysis showed consistent results, enabling the knowledge of the creep behavior of the salt rock, and its effects, as subsidence, water inflow and falling blocks. Furthermore, the analysis demonstrated the feasibility of applying the fracture technique in engineering projects with the application of the proposed methodology.
122

Aspectos relacionados às lavras de granitos ornamentais com fio diamantado no norte do estado do Espírito Santo, Brasil / Aspects related to quarries of ornamental granites with diamond wire in the north of Espirito Santo state, Brazil

Isaura Clotilde Martins da Costa Regadas 10 October 2006 (has links)
A utilização do fio diamantado na lavra de granitos ornamentais no Brasil é uma técnica de corte relativamente recente e, por esta razão, alguns problemas são decorrentes, principalmente do uso incorreto dos equipamentos, assim como também da falta de experiência dos operadores. Os casos aqui apresentados se reportam a observações em pedreiras localizadas no estado do Espírito Santo, nas quais as imperfeições no corte se relacionam à velocidade de corte, à torção do cabo, à refrigeração do fio, à retirada antecipada das polias auxiliares e à execução inadequada das emendas. A estes fatores técnicos se somam outros, de natureza geológica, como a necessidade de melhor conhecimento das características dos maciços rochosos e da petrografia dos granitos. / The use of the diamond wire in quarries of ornamental granites in Brazil is a relatively recent technique of cut and, for this reason, some problems are decurrent, mainly, of the incorrect use of the equipment, as well as of the lack of experience of operators. The cases here presented report the observations in quarries located in the state of Espirito Santo, in which the imperfections in the cut if regard the speed of cut, the twist and refrigeration of the wire and to the inadequate execution of the amendings. To these technical factors others are added, of geologic nature, like the necessity of better knowledge of the characteristics of the rocky bulks and the petrography of granites.
123

Sequenciamento e programação de lavra com alocação de equipamentos de carga. / Scheduling of mining with allocation of loading equipments.

Andrade, Arthur Quintão de 08 April 2014 (has links)
Este trabalho tem seu foco no problema de sequenciamento e programação da lavra em mina a céu aberto, com alocação de equipamentos de carregamento. Neste estudo considera-se a existência de uma frota heterogênea de equipamentos de carga e dois tipos de material lavráveis, sendo minério ou estéril. Para a lavra de minério são considerados requisitos de qualidade a serem atingidos pela mistura de minério, um britador, uma capacidade de operação atribuída à usina de beneficiamento e uma pilha de estoque objetivando abastecer a usina quando faltar minério nas frentes de lavra, denominada pilha de ROM. Em uma mina o carregamento pode ser gerido por um plano de lavra que descreve a movimentação e a produção horária de cada equipamento de carga ao longo do tempo. Neste contexto, apresenta-se um modelo matemático apoiado por um algoritmo responsável por mover o horizonte de tempo a cada execução do modelo com intuito de gerar ordens de lavra resolvidas com otimalidade. Juntas, essas ordens descreverão o plano de lavra dos equipamentos de carga. Os experimentos computacionais, realizados utilizando dados de uma jazida de cobre, mostram a efetividade da proposta considerando um horizonte de médio prazo. / This paper focuses on the mining scheduling problem in open pit, considering the allocation of loading equipment. This study considers the existence of a heterogeneous fleet loading equipment and two types of mineable material, namely ore or waste. For the mining of ore are considered quality requirements to be met by the ore blending, a crusher, the capacity of operation of the processing plant and a stockpile which feed the plant when there is lack of ore in mining fronts, called ROM stockpile. In a mine, loading can be managed by a mining plan that describes the movement and the schedule of each load equipment over time. In this context, we present a mathematical model supported by an algorithm that is responsible for moving the time horizon for each model run, with the goal of generating mining orders till resolved to optimality. Together, these orders describe the mining plan of the loading equipment. The computational experiments, conducted using data from a copper deposit, show the effectiveness of the proposal considering a medium-term horizon.
124

Modelo de gerenciamento de informações na cadeia de valor de mineração e de petróleo. / Information management model in the mining and oil value chain.

Azevedo, Ricardo Cabral de 07 August 2007 (has links)
Este trabalho começa abordando os aspectos estudados: visualização e gerenciamento de informações. Verifica-se hoje que uma das grandes dificuldades com eles é conseguir-se uma visão integrada de todas as atividades de uma empresa, especialmente nas de grande porte, bem como se manter dados precisos e atualizados sempre à disposição, para que se consiga identificar com rapidez possíveis erros e soluções. Estuda-se a utilização de conceitos de mapeamento de processos e de realidade virtual nas áreas de mineração e petrolífera - incluindo um breve histórico e exemplos de aplicações - para suprir estas dificuldades. Descreve-se, a seguir, os objetivos do trabalho, que envolvem o desenvolvimento de um modelo de integração de informações para as duas áreas citadas, além da análise dos benefícios inerentes ao acesso gráfico a repositórios centrais de dados. Parte-se de uma revisão bibliográfica relacionada aos problemas e soluções analisados, e de uma metodologia de trabalho adequada ao tema proposto, baseada em observação, entrevistas e análises com profissionais dos setores envolvidos. Passa-se para o estudo de caso da mina Rio das Pedras, da empresa PETROBRAS, em São Mateus do Sul, PR, que explora folhelhos para obtenção de óleo, escolhida para este estudo por envolver simultaneamente mineração e petróleo, focos dessa tese. Obteve-se diversos resultados, atendendo aos objetivos propostos. Foi desenvolvido um modelo de gerenciamento integrado de informações. Para isso, foi criado um diagrama representando a cadeia de valor de petróleo e foram mapeadas as atividades principais dessa cadeia, bem como as da mineração. Também foram criados modelos, com o auxílio de avançadas ferramentas computacionais, para uso de realidade virtual, além de um roteiro para implantação destes modelos. Estes resultados foram sendo divulgados ao longo deste projeto em diversos eventos, incluindo o Rio Oil & Gas Expo and Conference, em 2006 e o SIAEM, em 2004. Ao final, observou-se que há a possibilidade de uma boa integração dentro de cada setor, de mineração e petrolífero, e até a integração dos dois setores em alguns aspectos comuns a ambos, permitindo maior facilidade na obtenção de dados e na tomada de decisão. Com isso, verifica-se que essa tecnologia pode trazer melhorias importantes para os setores envolvidos, e muito pode ser feito para desenvolvê-la ainda mais. / This thesis starts by identifying the key issues of the research: visualization and management of information. It is widely known that one of the most common difficulties in information management is to obtain a complete and integrated view of all the company processes and activities. Another common difficulty is to maintain the necessary data always precise, updated and available to whoever needs them, so that it will be possible for the user to identify discrepancies right at the beginning and to immediately visualize the most appropriate solutions for each case. Evaluating the use of process mapping and virtual reality applied to the mining and petroleum industry - including a brief historical background and examples of applications - it is verified how these technologies can help to solve the problems identified. This thesis describes then the research objectives, which are based on developing a model suited for the integration of information in the mining and oil industry. The integration between mine planning and operation, and between oil exploration and production, together with the analysis of the benefits of a central graphical database, are also included. The thesis includes a bibliographic review, related to the problems and solutions analyzed, and also the methodology that has been developed, including observation, interviews, discussions, and analysis with professionals from the mining and petroleum industry. The thesis uses as a case study the oil shale mine Rio das Pedras (a mine from PETROBRAS, in São Mateus do Sul, Paraná). A brief description of this mine, and the reasons for its use on this study, related to the fact that it combines oil and mining engineering, are also presented here. The results of the research includes the development of an information management model, an oil production chain model, and models for processes mapping and virtual reality. These results were presented at international events like Rio Oil & Gas Expo and Conference, in 2006, and SIAEM, in 2004. Through the simulation of basic operations, as ore transport to the plant, and with the aid of the most advanced software tools available, it was verified how the data could be easily obtained, and how these technologies could be improved - it is already possible to integrate some mining and oil industry aspects - with a quite favorable forecast for its future use in several applications in the mining and petroleum industry.
125

Análise de cenários de planejamento de lavra para adequação de uso futuro de área de mineração de agregados

Schmitzhaus, Wagner Cristiano January 2018 (has links)
A produção de agregados para construção civil é o maior segmento mineral Brasileiro, em números de produção, sendo formada principalmente por pequenos e médios empreendimentos, normalmente utilizando técnicas e procedimentos obsoletos e pouco um nenhum planejamento tanto para extração quanto para o fechamento da mina. O fechamento de mina e posterior utilização da área ainda é um grande problema visto que existem muitas áreas mineradas em que o plano de fechamento de mina não foi executado, deixando assim um passivo socioambiental elevado, prejudicando a imagem da mineração. Existem diversos exemplos de sucesso em que antigas cavas foram utilizadas para a implantação de novos empreendimentos, como loteamentos, óperas e hotéis. Com o intuito de mostrar a importância do planejamento para fechamento e posterior utilização de área de mineração, bem como a análise ambiental e impactos da atividade na sociedade e meio ambiente, este trabalho tem o objetivo de desenvolver uma metodologia para auxiliar, principalmente o pequeno e médio produtor de agregados, sobre os impactos que o correto planejamento e manejo da operação têm sobre o retorno no uso futuro da área. Foram desenvolvidos diferentes cenários de usos futuros alternativos de uma área de mineração localizada no Litoral Norte do Rio Grande do Sul, que posteriormente foram comparados entre si em relação à recuperação mineral, impactos socioambientais, e retorno financeiro. Ao final do trabalho foi possível visualizar uma metodologia apropriada para a análise de impactos socioambientais e planejamento para preparação da área para o recebimento de novos empreendimentos. A partir destes métodos de análise dispõe-se de diversos cenários comparativos, podendo assim o empreendedor tomar a decisão mais correta em relação ao seu empreendimento minerário e futuros empreendimentos pós-fechamento. / Aggregate production for civil construction is the largest Brazilian mineral segment, in production numbers, consisting mainly of small and medium-sized enterprises, usually using obsolete techniques and procedures and little or no planning for both extraction and closure of the mine. The closure of mines and subsequent use of the area is still a major problem, there are many mined areas where the mine closure plan has not been implemented, thus leaving a high social and environmental liability, damaging the mining image, but there are several examples of use of deactivated mining sites for the implementation of diverse projects. In order to show the importance of planning for the closure and subsequent use of the mining area, as well as the environmental analysis of impacts of the activity on society and the environment, this work has the objective of developing a methodology to assist, especially small and medium aggregate producer, on the impacts that correct planning and management of the operation has on the future use of the area. Different scenarios of future uses of a mining area located in the Northern Coast of Rio Grande do Sul were developed, which were later compared to each other in relation to mineral recovery, socioenvironmental impacts, and financial return. At the end of the work it was possible to visualize an appropriate methodology for the analysis of socio-environmental impacts and planning to prepare the area to receive new projects. From these methods of analysis we have several comparative scenarios, so that the entrepreneur can make the most correct decision regarding his mining enterprise and future enterprises after the closing.
126

Sequenciamento e programação de lavra com alocação de equipamentos de carga. / Scheduling of mining with allocation of loading equipments.

Arthur Quintão de Andrade 08 April 2014 (has links)
Este trabalho tem seu foco no problema de sequenciamento e programação da lavra em mina a céu aberto, com alocação de equipamentos de carregamento. Neste estudo considera-se a existência de uma frota heterogênea de equipamentos de carga e dois tipos de material lavráveis, sendo minério ou estéril. Para a lavra de minério são considerados requisitos de qualidade a serem atingidos pela mistura de minério, um britador, uma capacidade de operação atribuída à usina de beneficiamento e uma pilha de estoque objetivando abastecer a usina quando faltar minério nas frentes de lavra, denominada pilha de ROM. Em uma mina o carregamento pode ser gerido por um plano de lavra que descreve a movimentação e a produção horária de cada equipamento de carga ao longo do tempo. Neste contexto, apresenta-se um modelo matemático apoiado por um algoritmo responsável por mover o horizonte de tempo a cada execução do modelo com intuito de gerar ordens de lavra resolvidas com otimalidade. Juntas, essas ordens descreverão o plano de lavra dos equipamentos de carga. Os experimentos computacionais, realizados utilizando dados de uma jazida de cobre, mostram a efetividade da proposta considerando um horizonte de médio prazo. / This paper focuses on the mining scheduling problem in open pit, considering the allocation of loading equipment. This study considers the existence of a heterogeneous fleet loading equipment and two types of mineable material, namely ore or waste. For the mining of ore are considered quality requirements to be met by the ore blending, a crusher, the capacity of operation of the processing plant and a stockpile which feed the plant when there is lack of ore in mining fronts, called ROM stockpile. In a mine, loading can be managed by a mining plan that describes the movement and the schedule of each load equipment over time. In this context, we present a mathematical model supported by an algorithm that is responsible for moving the time horizon for each model run, with the goal of generating mining orders till resolved to optimality. Together, these orders describe the mining plan of the loading equipment. The computational experiments, conducted using data from a copper deposit, show the effectiveness of the proposal considering a medium-term horizon.
127

Estudo numérico do comportamento mecânico de pilhas de estéril de mineração.

Teixeira, Marcílio Baltazar January 2011 (has links)
Submitted by Stéfany Moreira (stemellra@yahoo.com.br) on 2013-02-28T16:02:54Z No. of bitstreams: 1 DISSERTAÇÃO_EstudoNuméricoComportamento.pdf: 27938888 bytes, checksum: 5b2329c94a69e16145d8d44fcca64390 (MD5) / Approved for entry into archive by Neide Nativa (neide@sisbin.ufop.br) on 2013-03-01T17:37:47Z (GMT) No. of bitstreams: 1 DISSERTAÇÃO_EstudoNuméricoComportamento.pdf: 27938888 bytes, checksum: 5b2329c94a69e16145d8d44fcca64390 (MD5) / Made available in DSpace on 2013-03-01T17:37:47Z (GMT). No. of bitstreams: 1 DISSERTAÇÃO_EstudoNuméricoComportamento.pdf: 27938888 bytes, checksum: 5b2329c94a69e16145d8d44fcca64390 (MD5) Previous issue date: 2011 / O objetivo desta dissertação consiste na aplicação do método dos elementos finitos (MEF), através da utilização do programa computacional ANLOG (Análise Não Linear de Obras Geotécnicas), para análise do comportamento mecânico, sob condição de equilíbrio estático e deformação plana, de pilhas de estéril de mineração, realçando os aspectos relacionados à geometria, às condições de contorno, às propriedades constitutivas (tanto do material da pilha quanto do terreno de fundação) e ao processo construtivo. Este trabalho visa contribuir para o maior entendimento do comportamento mecânico das pilhas de estéril (aterros) de modo a colaborar para a elaboração de projetos mais seguros e viáveis. Para representação do comportamento constitutivo foram adotados os modelos: linear-elástico e elástico perfeitamente plástico adotando o critério de Mohr-Coulomb modificado. No que diz respeito à simulação do processo construtivo adota-se a técnica de “ligar a gravidade” juntamente com o procedimento da malha dinâmica. Algumas análises preliminares são apresentadas com o objetivo de verificar a utilização do programa computacional ANLOG na análise tensão- deformação deste tipo de obra geotécnica. Neste caso, optou-se por apresentar situações as quais possuíam solução analítica e/ou numérica conhecida e disponível na literatura. Em seguida, considerando as normas reguladoras de mineração no que diz respeito à elaboração e apresentação de projeto de disposição de estéril em pilha, várias configurações geométricas de pilhas de estéril, dispostas em encostas e construídas pelo método ascendente, foram analisadas com o intuito de avaliar a aplicação destas normas reguladoras e verificar o comportamento das pilhas á luz da análise elastoplástica de equilíbrio estático. Por fim, um estudo de caso da pilha de estéril de Mont Jardin da Nickel SLN em New Caledonia é apresentado e os resultados desta análise numérica são comparados com os resultados obtidos por Omraci et al. (2002). __________________________________________________________________________________________ / ABSTRACT: The objective of this dissertation is the application of the finite element method (FEM), by using the computer program ANLOG (Nonlinear Analysis Geotecnhical Constructions) for static analysis of mechanical behavior of mining sterile piles under plane strain condition, highlighting tha aspects of geometry boundary conditions, the constitutive properties (both material, pile and foundation) and the construction process. This work aims to contribute to better understanding of the mechanical behavior of mining sterile piles leading to the development of safer and reliable projects. The constitutive behavior of materials was represented by linear elastic model and elasticperfectly plastic model adopting the Modified Mohr-Coulomb criterion. Regarding the simulation of the construction process adopts the technique of "gravity turn" along with the dynamic mesh procedure. Some preliminary analysis is presented in order to verify the use of computer program ANLOG for stress-strain analysis of this type of geotchnical work. In this case, it was presented situations in wwhich analytical or numerical solution were known and available in the literature. Then, considering the regulatory standards formining regarding to elaboration and presentation of mining waste dump's project, several geometric configurations of hillside piles built by the ascending method, were analyzed in order to verify the regulatory standards and the behavior of these piles in the light of the elastoplastic analysis of static equilibrium. Finally, a case study of Mont Jardin's waste dump of Nickel SLN in New Caledonia is presented and the results of this numerical analysis are compared with results obtained by Omraci et al. (2002).
128

Análise de cenários de planejamento de lavra para adequação de uso futuro de área de mineração de agregados

Schmitzhaus, Wagner Cristiano January 2018 (has links)
A produção de agregados para construção civil é o maior segmento mineral Brasileiro, em números de produção, sendo formada principalmente por pequenos e médios empreendimentos, normalmente utilizando técnicas e procedimentos obsoletos e pouco um nenhum planejamento tanto para extração quanto para o fechamento da mina. O fechamento de mina e posterior utilização da área ainda é um grande problema visto que existem muitas áreas mineradas em que o plano de fechamento de mina não foi executado, deixando assim um passivo socioambiental elevado, prejudicando a imagem da mineração. Existem diversos exemplos de sucesso em que antigas cavas foram utilizadas para a implantação de novos empreendimentos, como loteamentos, óperas e hotéis. Com o intuito de mostrar a importância do planejamento para fechamento e posterior utilização de área de mineração, bem como a análise ambiental e impactos da atividade na sociedade e meio ambiente, este trabalho tem o objetivo de desenvolver uma metodologia para auxiliar, principalmente o pequeno e médio produtor de agregados, sobre os impactos que o correto planejamento e manejo da operação têm sobre o retorno no uso futuro da área. Foram desenvolvidos diferentes cenários de usos futuros alternativos de uma área de mineração localizada no Litoral Norte do Rio Grande do Sul, que posteriormente foram comparados entre si em relação à recuperação mineral, impactos socioambientais, e retorno financeiro. Ao final do trabalho foi possível visualizar uma metodologia apropriada para a análise de impactos socioambientais e planejamento para preparação da área para o recebimento de novos empreendimentos. A partir destes métodos de análise dispõe-se de diversos cenários comparativos, podendo assim o empreendedor tomar a decisão mais correta em relação ao seu empreendimento minerário e futuros empreendimentos pós-fechamento. / Aggregate production for civil construction is the largest Brazilian mineral segment, in production numbers, consisting mainly of small and medium-sized enterprises, usually using obsolete techniques and procedures and little or no planning for both extraction and closure of the mine. The closure of mines and subsequent use of the area is still a major problem, there are many mined areas where the mine closure plan has not been implemented, thus leaving a high social and environmental liability, damaging the mining image, but there are several examples of use of deactivated mining sites for the implementation of diverse projects. In order to show the importance of planning for the closure and subsequent use of the mining area, as well as the environmental analysis of impacts of the activity on society and the environment, this work has the objective of developing a methodology to assist, especially small and medium aggregate producer, on the impacts that correct planning and management of the operation has on the future use of the area. Different scenarios of future uses of a mining area located in the Northern Coast of Rio Grande do Sul were developed, which were later compared to each other in relation to mineral recovery, socioenvironmental impacts, and financial return. At the end of the work it was possible to visualize an appropriate methodology for the analysis of socio-environmental impacts and planning to prepare the area to receive new projects. From these methods of analysis we have several comparative scenarios, so that the entrepreneur can make the most correct decision regarding his mining enterprise and future enterprises after the closing.
129

Desenho de polígonos e sequenciamento de blocos de minério para planejamento de curto prazo procurando estacionarização dos teores

Toledo, Augusto Andres Torres January 2018 (has links)
O planejamento de curto prazo em minas a céu aberto exige a definição de poligonais, que representam os sucessivos avanços de lavra. As poligonais, tradicionalmente, são desenhadas em um processo laborioso na tentativa de delinear como minério em qualidade e quantidade de acordo com os limites determinados. O minério delimitado deve apresentar a menor variabilidade em qualidade possível, com o objetivo de maximizar a recuperação na usina de processamento. Essa dissertação visa desenvolver um fluxo do trabalho para definir poligonais de curto prazo de forma automática, além disso, sequenciar todos os blocos de minério de cada polígono de modo a definir uma sequência interconectada lavrável de poligonais. O fluxo do trabalho foi aplicada à incerteza de teores, obtida através de simulações estocásticas. Algoritmos genéticos foram desenvolvidos em linguagem de programação Python e implementados na forma de plug-in no software geoestatístico Ar2GeMS. Múltiplas iterações são criadas para cada avanço individual, gerando regiões (ou poligonais). Então, a região que apresenta menor variabilidade de teores é selecionada. A distribuição de probabilidade dos teores dos blocos em cada avanço é comparada com a distribuição global de teores, calculada a partir de todos os blocos do corpo de minério. Os resultados mostraram que os teores dos blocos abrangidos pelas poligonais criadas dessa forma apresentam teores similares à distribuição de referência, permitindo o sequenciamento de lavra com distribuição de teores mais próximo possível da distribuição global. Modelos equiprováveis permitem avaliar a incerteza associada à solução proposta. / Open-pit short-term planning requieres the definition of polygons identifying the successive mining advances. These polygons are drawn in a labour intensive task attempting to delineate ore with the quantity and quality within established ranges. The ore delineated by the polygons should have the least possible quality variability among them, helping in maximizing ore recovery at the processing plant. This thesis aims at developíng a workflow for drawing short-term polygons automatically, sequencing all ore blocks within each polygon and leading to a mineable and connected sequence of polygons. This workflow is also tested under grade uncertainty obtained through multiple syochastic simulated models. For this, genetics algorithms were developed in Python programming language and pluged in Ar2GeMS geostatistical software. Multiple iterations were generated for each of the individual advances, generating regions or polygons, and selecting the regions of lower grade variability. The blocks probability distribution within each advance were compared to the global distribution, including all blocks within the ore body. Results show that the polygons generated are comprised by block grades similar to the ones from the reference distribution, leading to mining sequence as close as possible to the global maintaining a quasi-satationarity. Equally probable models provide the means to access the uncertainy in the solution provided.
130

Análise de cenários de planejamento de lavra para adequação de uso futuro de área de mineração de agregados

Schmitzhaus, Wagner Cristiano January 2018 (has links)
A produção de agregados para construção civil é o maior segmento mineral Brasileiro, em números de produção, sendo formada principalmente por pequenos e médios empreendimentos, normalmente utilizando técnicas e procedimentos obsoletos e pouco um nenhum planejamento tanto para extração quanto para o fechamento da mina. O fechamento de mina e posterior utilização da área ainda é um grande problema visto que existem muitas áreas mineradas em que o plano de fechamento de mina não foi executado, deixando assim um passivo socioambiental elevado, prejudicando a imagem da mineração. Existem diversos exemplos de sucesso em que antigas cavas foram utilizadas para a implantação de novos empreendimentos, como loteamentos, óperas e hotéis. Com o intuito de mostrar a importância do planejamento para fechamento e posterior utilização de área de mineração, bem como a análise ambiental e impactos da atividade na sociedade e meio ambiente, este trabalho tem o objetivo de desenvolver uma metodologia para auxiliar, principalmente o pequeno e médio produtor de agregados, sobre os impactos que o correto planejamento e manejo da operação têm sobre o retorno no uso futuro da área. Foram desenvolvidos diferentes cenários de usos futuros alternativos de uma área de mineração localizada no Litoral Norte do Rio Grande do Sul, que posteriormente foram comparados entre si em relação à recuperação mineral, impactos socioambientais, e retorno financeiro. Ao final do trabalho foi possível visualizar uma metodologia apropriada para a análise de impactos socioambientais e planejamento para preparação da área para o recebimento de novos empreendimentos. A partir destes métodos de análise dispõe-se de diversos cenários comparativos, podendo assim o empreendedor tomar a decisão mais correta em relação ao seu empreendimento minerário e futuros empreendimentos pós-fechamento. / Aggregate production for civil construction is the largest Brazilian mineral segment, in production numbers, consisting mainly of small and medium-sized enterprises, usually using obsolete techniques and procedures and little or no planning for both extraction and closure of the mine. The closure of mines and subsequent use of the area is still a major problem, there are many mined areas where the mine closure plan has not been implemented, thus leaving a high social and environmental liability, damaging the mining image, but there are several examples of use of deactivated mining sites for the implementation of diverse projects. In order to show the importance of planning for the closure and subsequent use of the mining area, as well as the environmental analysis of impacts of the activity on society and the environment, this work has the objective of developing a methodology to assist, especially small and medium aggregate producer, on the impacts that correct planning and management of the operation has on the future use of the area. Different scenarios of future uses of a mining area located in the Northern Coast of Rio Grande do Sul were developed, which were later compared to each other in relation to mineral recovery, socioenvironmental impacts, and financial return. At the end of the work it was possible to visualize an appropriate methodology for the analysis of socio-environmental impacts and planning to prepare the area to receive new projects. From these methods of analysis we have several comparative scenarios, so that the entrepreneur can make the most correct decision regarding his mining enterprise and future enterprises after the closing.

Page generated in 0.0347 seconds