• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 72
  • Tagged with
  • 72
  • 72
  • 30
  • 24
  • 21
  • 18
  • 15
  • 15
  • 12
  • 12
  • 9
  • 9
  • 9
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Análise da sensibilidade do seqüenciamento de lavra em função da incerteza do modelo geológico

Peroni, Rodrigo de Lemos January 2002 (has links)
Quantificação de incerteza e risco tem aplicação direta no projeto de limites de cava e na programação de produção. Pequenas variações nas condições de contorno de um projeto podem ter impacto significativo sobre o retorno final do mesmo na ordem de milhões de dólares. Preço de mercado do bem mineral, o custo de capital, taxas de atratividade, etc, são fatores usualmente testados para analisar a viabilidade de um empreendimento, porém, raramente é considerada a incerteza relacionada ao atributo geológico em questão. O propósito de um planejamento de lavra tem sido prover subsidio para o engenheiro de minas decidir sobre a capacidade de minerar determinadas unidades de lavra do depósito a partir de teores estimados. Salienta-se porém que existe, a partir dos dados amostrais, incertezas a respeito do modelo geológico que devem ser consideradas ao se projetar uma cava e desenvolver a lavra. A simulação geoestatistica tem a capacidade de produzir múltiplos modelos equiprováveis, os quais podem ser avaliados independentementecomo possíveis cenários do depósito mineral. Simulação condicional, ao contrário de técnicas de interpolação e estimativa, provê respostas para questões associadas a risco devido à variações nos teores do modelo geológico. Ao gerar múltiplos cenários tem-se acesso à probabilidade e conseqüentemente às variações de retorno financeiro e rotas de extração de minério de um projeto. o presente trabalho tem como objetivo a investigação de novas metodologias que contribuam para a construção de cenários de planejamento de lavra e avaliação do impacto provocado nestes pela incerteza fornecida a partir de modelos simulados. As respostas buscadas dentro da abordagem sugerida por esse trabalho, compreendem a definição de uma metodologia para controle e planejamento de lavra a médio e longo prazo por incorporação da flutuabilidade local associada ao minério, avaliando a sensibilidade do retorno financeiro e o traçado de lavra em relação ao método de geração do modelo geológico de teores. Para solucionar o problema em questão, sugere-se a geração de modelos estocásticos e a alimentação de múltiplos modelos selecionados por critérios considerados relevantes para a delimitação do espaço de incerteza. A aplicação de funções de transferência tais como mudança de suporte e seqüenciamento de produção sobre os modelos simulados é a chave para a obtenção de respostas a respeito do impacto sobre a lucratividade de um projeto. Ao alimentar à essas funções modelos equiprováveis que preservam as características estatísticas e a conectividade espacial dos dados amostrais mas que invariavelmente possuem diferentes distribuições de teores tem-se a dimensão em termos econômicos do risco associado à incerteza geológica. Foi confrontado o retorno financeiro produzido por modelos simulados e verificou-se para o caso especifico que os métodos de simulação geoestatistica empregados não produziram diferenças significativas quando comparados casos selecionados segundo os mesmos critérios. Porém, entre cenários extremos gerados pelo mesmo algoritmo de simulação foram verificadas desigualdades relevantes. Verificou-se também a transferência de minério entre diferentes classes de qualidade ao proceder-se com variações nas dimensões dos blocos de lavra.
22

Utilização de simulação conjunta colocada com variável supersecundária para construção de modelo geometalúrgico de nióbio Araxá-MG

Braga Júnior, José Marques January 2017 (has links)
Modelo de blocos para teor é um recurso comumente utilizado pelo planejamento de lavra na indústria mineira. Na maioria dos casos o conhecimento sobre os teores das variáveis químicas não é suficiente para prever o desempenho geometalúrgico do minério quando submetido ao processo de concentração. A geometalurgia engloba um conjunto de testes de comportamento metalúrgico do minério e seus resultados são incorporados ao modelo de bloco, ajudando a tornar o planejamento da lavra mais preciso quanto à capacidade de produção, melhorando os ganhos financeiros e reduzindo os riscos associados à lavra e a tomada de decisões. A recuperação metalúrgica de nióbio mede o quanto do conteúdo metálico de interesse no minério é recuperado no concentrado após o processamento mineral. Esta informação é muitas vezes subutilizada no modelo de bloco devido à baixa quantidade de dados primários, o que dificulta a construção de um modelo de bloco confiável. No entanto, para complementar a variável de interesse, informações secundárias de outros atributos podem ser utilizadas. A cossimulacão de informações não aditivas em depósitos multivariados com mais de duas variáveis secundárias envolvidas é extremamente trabalhosa e normalmente seus resultados precisam ser ajustados posteriormente. A necessidade de ajustes posteriores, aliada a falta de praticidade da maioria dos métodos de cossimulação, motiva a busca por solucões alternativas que gerem resultados tão ou mais precisos e que sejam de fácil aplicação na rotina de modelamento geológico. É comum que os programas utilizados para a cossimulação se baseiem em uma única variável secundária, porém, o fenômeno analisado pode estar sendo influenciado por vários fatores, neste caso, o uso combinado de todos fatores relevantes pode melhorar a predição da variável de interesse. O uso de múltiplas variáveis secundárias pode ser gerenciado criando-se uma variável supersecundária. Neste caso, a quimiometria pode ser aplicada, resolvendo problemas preditivos e modelando propriedades de sistemas químicos visando prever a recuperação metalúrgica. Nesse trabalho, após a combinação de múltiplas variáveis em um preditivo supersecundário, a cossimulação sequencial gaussiana foi aplicada para gerar o modelo geometalúrgico. A simulação conjunta colocada permite a simulação conjunta do dado supersecundário com o dado primário, integrando mais informações para melhorar a predição da recuperação metalúrgica do nióbio. A cossimulação foi realizada com base no modelo de corregionalização de Markov para simplificar a modelagem da covariância cruzada. O modelo probabilístico geometalúrgico obtido se mostrou eficiente, mantendo uma precisão adequada na previsão da variável de interesse. / Grade block models are a standard input in mine planning throughout the mining industry. In most cases, the ore grades knowledge is not enough to predict the behavior of the ore at the processing plant. Geometallurgy comprises a set of ore metallurgical behavior tests and their results incorporated into the block model, helping in making mine planning more precise when it comes to the production capacity, improving financial earnings and reducing risks. Niobium Metallurgical Recovery is a very important variable to be controlled, measuring how much of the metal content in the ore is recovered in the concentrate after mineral processing. This information is often underused in the block model due to the low quantity of primary data, which makes the construction of a reliable block model difficult. However, to supplement the variable of interest, secondary information from other attributes can be used. Cosimulation of non-additive information in multivariate deposits with more than two secondary variables involved is extremely labor-intensive and its results usually need to be later adjusted. The need for subsequent adjustments, combined with the lack of practicality of most cossimulation methods, motivates the search for alternative solutions that generate results that are as accurate and easy to apply in the routine of geological modeling in the mineral industry. In multivariate geostatistics most programs used for cosimulation are based on one secondary variables. Frequently the analyzed phenomenon is influenced by several factors. In this case, the use of them combined can improve the prediction of the variable of interest. The use of multiple secondary variables can be managed by creating a super-secondary variable. In this case, chemometrics can be applied, solving predictive problems, modeling properties of chemical systems aiming at predicting the metallurgical recovery. After combining multiple variables into a super-secondary predictive, Sequential Gaussian Cosimulation was applied in this study to generate a geometallurgical model. The collocated joint simulation allows the joint simulation of a super-secondary data with the primary data, integrating more information to improve the cosimulation of the niobium metallurgical recovery. The cosimulation was run based on the Markov coregionalization model to simplify the cross-covariance modeling. The result is a representative probabilistic geometallurgical model, which proved to be efficient maintaining an adequate precision in forecasting the predicted variable.
23

Simulação Sequencial Gaussiana usando Latin Hypercube Sampling : estudo de caso minério de ferro Carajás

Batiston, Evandro Lino January 2010 (has links)
A utilização de modelos de incerteza geológica é fundamental para a quantificação e avaliação da flutuação dos atributos analisados pelos departamentos de planejamento da indústria mineira. O método de simulação seqüencial Gaussiana (SSG) é amplamente utilizado para a construção destes modelos. O SSG caracteriza-se por representar adequadamente o espaço de incerteza da variável aleatória (VA) Z(u), desde que o número de realizações L seja adequado para reproduzi-lo. Existem dois algoritmos implementados em SSG que efetuam a tiragem aleatória da distribuição condicional local de probabilidade (dclp) cumulativa, visando gerar as realizações que vão compor a simulação. O algoritmo clássico, baseado na tiragem simples por Monte Carlo, denomina-se Simple Random Sampling (SRS), enquanto que o método alternativo é denominado Latin Hypercube Sampling (LHS). Esta dissertação compara a eficiência destes dois algoritmos, como forma de caracterizar o espaço de incerteza de algumas funções de transferência usadas na indústria mineral. O estudo de caso envolveu a análise do número de realizações necessárias para caracterizar adequadamente a variabilidade da resposta destas funções, como mecanismo para comparação, para um banco de dados de minério de ferro da Província Mineral de Carajás. Observou-se que o método LHS ofereceu maior eficiência na caracterização do espaço de incerteza da VA Z(u), estratificando a dclp de acordo com cada realização, proporcionando menor número de realizações e melhor cobertura da dclp, na construção do modelo de incerteza. Estes benefícios facilitam a implementação da técnica de SSG nas rotinas de planejamento, de forma que os modelos de incerteza serão menores e mais fáceis de manipular. / Assessing geological uncertainty is of paramount importance in mining industry risk analysis. Sequential Gaussian Simulation (SGS) is widely used for building such models, especially when mapping grade uncertainty. SGS is commonly used for mapping the uncertainty space of a random variable (RV) Z(u), and the number of realizations L to adequate characterize this space is possible large. Two algorithms were herein implemented combined with SGS for random drawing from the conditional cumulative distribution function (ccdf). The classical algorithm, based on Monte Carlo simple drawing known as Simple Random Sampling (SRS), whereas the alternative method, Latin Hypercube Sampling (LHS). The present dissertation compares the efficiency of these two algorithms checking their efficiency in characterizing the uncertainty space of some transfer functions employed in the mineral industry. Through a case study it was checked the number of necessary realizations to adequately characterize the variability of these response functions, as a mechanism for comparison. The dataset comes from an iron ore mine at the Carajás Mineral Province It was observed that the LHS method is more efficient in characterizing uncertainty space of RV Z(u), by stratifying the ccdf according to each realization. Such characteristic of LHS requires fewer realizations to proper build the uncertainty model. These benefits facilitate the implementation simulations into the routines of planning, using smaller and easier to manipulate uncertainty models.
24

Análise da sensibilidade do seqüenciamento de lavra em função da incerteza do modelo geológico

Peroni, Rodrigo de Lemos January 2002 (has links)
Quantificação de incerteza e risco tem aplicação direta no projeto de limites de cava e na programação de produção. Pequenas variações nas condições de contorno de um projeto podem ter impacto significativo sobre o retorno final do mesmo na ordem de milhões de dólares. Preço de mercado do bem mineral, o custo de capital, taxas de atratividade, etc, são fatores usualmente testados para analisar a viabilidade de um empreendimento, porém, raramente é considerada a incerteza relacionada ao atributo geológico em questão. O propósito de um planejamento de lavra tem sido prover subsidio para o engenheiro de minas decidir sobre a capacidade de minerar determinadas unidades de lavra do depósito a partir de teores estimados. Salienta-se porém que existe, a partir dos dados amostrais, incertezas a respeito do modelo geológico que devem ser consideradas ao se projetar uma cava e desenvolver a lavra. A simulação geoestatistica tem a capacidade de produzir múltiplos modelos equiprováveis, os quais podem ser avaliados independentementecomo possíveis cenários do depósito mineral. Simulação condicional, ao contrário de técnicas de interpolação e estimativa, provê respostas para questões associadas a risco devido à variações nos teores do modelo geológico. Ao gerar múltiplos cenários tem-se acesso à probabilidade e conseqüentemente às variações de retorno financeiro e rotas de extração de minério de um projeto. o presente trabalho tem como objetivo a investigação de novas metodologias que contribuam para a construção de cenários de planejamento de lavra e avaliação do impacto provocado nestes pela incerteza fornecida a partir de modelos simulados. As respostas buscadas dentro da abordagem sugerida por esse trabalho, compreendem a definição de uma metodologia para controle e planejamento de lavra a médio e longo prazo por incorporação da flutuabilidade local associada ao minério, avaliando a sensibilidade do retorno financeiro e o traçado de lavra em relação ao método de geração do modelo geológico de teores. Para solucionar o problema em questão, sugere-se a geração de modelos estocásticos e a alimentação de múltiplos modelos selecionados por critérios considerados relevantes para a delimitação do espaço de incerteza. A aplicação de funções de transferência tais como mudança de suporte e seqüenciamento de produção sobre os modelos simulados é a chave para a obtenção de respostas a respeito do impacto sobre a lucratividade de um projeto. Ao alimentar à essas funções modelos equiprováveis que preservam as características estatísticas e a conectividade espacial dos dados amostrais mas que invariavelmente possuem diferentes distribuições de teores tem-se a dimensão em termos econômicos do risco associado à incerteza geológica. Foi confrontado o retorno financeiro produzido por modelos simulados e verificou-se para o caso especifico que os métodos de simulação geoestatistica empregados não produziram diferenças significativas quando comparados casos selecionados segundo os mesmos critérios. Porém, entre cenários extremos gerados pelo mesmo algoritmo de simulação foram verificadas desigualdades relevantes. Verificou-se também a transferência de minério entre diferentes classes de qualidade ao proceder-se com variações nas dimensões dos blocos de lavra.
25

Métodos estocásticos aplicados a definição de estratégias de amostragem e homogeneização

Marques, Diego Machado January 2014 (has links)
Estimar os teores de minério alimentando uma usina de beneficiamento não é uma tarefa trivial e é uma contínua fonte de controvérsia na indústria de mineração. Os teores determinados como parte do planejamento de lavra de curto prazo muitas vezes não são reproduzidos pela amostragem do fluxo contínuo de minério na planta, devido a problemas na amostragem e/ou interpolação de baixa qualidade de teores. Os teores são normalmente obtidos por amostragens periódicas do fluxo contínuo durante um dia ou por turnos e tomando a média das múltiplas amostras recolhidas. O erro padrão do teor médio depende da variabilidade do minério e a frequência (número) de amostras. Quanto maior o número de amostras coletadas, maior será a precisão da média calculada. Experimentos variográficos são normalmente utilizados para mapear a variabilidade dos teores durante certo período, e a variância de extensão é derivada desse variograma. Esta abordagem é demorada, cara e complicada, e, por conseguinte, a sua utilização é muitas vezes evitada na indústria de mineração. Em alguns casos, as pilhas de homogeneização são utilizadas na indústria de mineração para a redução da variabilidade nos teores de minério que alimentam as plantas de beneficiamento, fornecidos pelo planeamento mina de curto prazo. Vários métodos são utilizados no design das pilhas de homogeneização, e a maioria não incorporam o a variabilidade in situ que é intrínseca ao depósito mineral A metodologia proposta aqui investiga uma nova abordagem baseada em simulação dos teores de minério que alimenta a planta de beneficiamento e as pilhas de homogeneização. Modelos tridimensionais dos teores in situ são construídos usando simulações geoestatísticas. A continuidade espacial dos teores e sua variabilidade são reproduzidos em modelos com as mesmas características do depósito real. Estes modelos são utilizados no planejamento de mina e sequenciamento de lavra, transformando um modelo de blocos tridimensionais em uma sequência unidimensional de valores que alimentam a planta de beneficiamento (fluxo unidimensional) e/ou a pilha de homogeneização. O método combina pilhas longitudinais e simulações geoestatísticas para emular a variabilidade in situ, bem como a variabilidade dos teores da pilha retomada. Foi desenvolvido dois algoritmos de emulação: um para emular o processo de amostragem de fluxo contínuo e um emulador de blendagem/homogeneização para pilhas de homogeneização longitudinais. No algoritmo de amostragem, é emulado o intervalo de amostragem de um fluxo contínuo baseado unicamente em simulações geoestatísticas que imitam o processo de extração de várias amostras a intervalos diferentes e o erro relativo calculado para cada plano de amostragem, comparando a média das amostras contra a média real (média de todas as amostras do fluxo contínuo emulada). No emulador de blendagem/homogeneização, em que a entrada consiste na sequência pré-definida de lavra, o algoritmo foi aplicado a vários cenários simulados do depósito mineral Esta sequência é rearranjada pelo algoritmo, que seleciona os blocos que formam a pilha de cada modelo de blocos simulado, e simula a operação de empilhamento e retomada do material. Usando esta metodologia pode-se avaliar, dentro de um determinado período de tempo, a variabilidade dos teores para vários tamanhos de pilha, bem como a variabilidade interna dos teores da pilha quando determinada pilha é retomada. Os resultados de um estudo de caso em duas grandes minas de ferro mostraram consistência e forneceu estimativas satisfatórias de o erro de amostragem para vários intervalos de amostragem, utilizando os teores simulados. Além disso demonstra-se que a taxa de variabilidade nas pilhas de homogeneização diminui à medida que o tamanho da pilha aumenta e a variabilidade interna teores diminui para um dado tamanho de pilha, quando o número de camadas na pilha é aumentado. / Estimating the head grades from the ore feeding a processing plant is not a trivial task and is a continuing source of controversy in the mining industry. Grades determined as part of short-term mine planning are frequently not reproduced by sampling the continuous flow of ore at the plant, due to problems in the sampling and/or due to poor grade interpolations. Head grades are normally obtained by sampling the continuous flow periodically during a day or shift and taking the average of the multiple samples collected. The standard error of this mean grade depends on the ore variability and the frequency (number) of samples. The more samples that are taken, the higher the precision of the calculated mean. Variographic experiments are normally used to map grade variability during a certain period, and the extension variance is derived from this variogram. This approach is time-consuming, expensive, and cumbersome, and therefore its use is often avoided in the mining industry. In some cases, homogenization piles are used in the mining industry for variability reduction in the head grades of the ore feeding the processing plants provided by the short-term mine planning. Various methods are used when designing homogenization piles, and most fail to incorporate the in situ grade variability that is intrinsic to the mineral deposit The methodology proposed here investigates a novel approach based on simulating the grades of ore feeding the processing plant and the homogenization piles. In situ three-dimensional grade models are constructed using geostatistical simulations. Grade spatial continuity and variability are reproduced in models with the same characteristics of the real deposit. These models are used in mine planning and scheduling, transforming a threedimensional block model into a one-dimensional string of values feeding the plant (onedimensional flow) and/or the homogenization pile. The method combines longitudinal piles and geostatistical simulations to emulate the in situ variability as well as the reclaimed pile grade variability. It has been developed two emulator algorithms: one to emulate the process of sampling of continuous flow and a blending/homogenization emulator for longitudinal stockpiles. In the sampling algorithm, it is emulated the sampling interval from a continuous flow based solely on geostatistical simulations mimicking the process of extracting various samples at different intervals and calculate for each sampling scheme the relative error by comparing the average of the samples against the true mean (mean of all samples in the emulated continuous flow). In the blending/homogenization emulator, where the input consists of the pre-defined mining sequence, the algorithm has been applied to several simulated scenarios of the mineral deposit This sequence is re-arranged by the algorithm, which selects the blocks that will form the pile of each simulated block model, and simulates the operation of the stacking and reclaiming equipment. Using this methodology one can evaluate, within a certain period, the expected grade variability for various pile sizes as well as the internal grade variability when a given pile is reclaimed. Results from a case study at two large iron mines showed consistency and provided satisfactory estimates of the sampling error for various sampling intervals using the simulated grades. Also, it is demonstrated that the rate of variability in the homogenization piles decreases as the pile size increases and the internal grade variability decreases for a given pile size, when the number of layers in the pile is increased.
26

Introdução de parâmetros de controle de incertezas para planejamento de lavra

Capponi, Luciano Nunes January 2012 (has links)
Desde a exploração até o planejamento de lavra, metodologias para quantificação do risco associado ao empreendimento mineiro podem melhorar drasticamente o processo de tomada de decisão. Pequenas variações nas condições de contorno de um projeto podem ter impacto significativo sobre o retorno final do mesmo. Dentro deste contexto, na mineração, a incerteza geológica é vista como um dos principais fatores que contribuem para o insucesso do projeto. A medição e gerenciamento do risco geológico na avaliação do projeto e tomada de decisão pode ser realizada em varias etapas do empreendimento mineiro, desde a quantificação dos recursos, sequenciamento de lavra até a exaustão das reservas. Além disso, a incerteza geológica pode ser traduzida no risco financeiro associado, proporcionando uma análise sobre a viabilidade econômica do empreendimento. A necessidade da quantificação da incerteza geológica já era reconhecida pela indústria de mineração desde a década de 1970, onde estimativas globais e locais eram consideradas insuficientes para a otimização do planejamento de produção, sequenciamento de lavra ou estratégias de homogeneização de pilhas. Desta forma, a simulação estocástica vem desempenhando um papel crucial na construção de modelos de incerteza de teores em depósitos minerais, proporcionando uma ferramenta para obter uma análise do risco associado. Este trabalho tem como objetivo o desenvolvimento de uma metodologia que contribua para a construção de cenários de planejamento de lavra e avaliação do impacto provocado pelas incertezas geológicas fornecidas a partir de modelos simulados. As respostas buscadas, usando a abordagem sugerida, compreendem a definição de uma metodologia para controle e planejamento de lavra incorporando a incerteza local associada ao minério, avaliando a sensibilidade do retorno financeiro e o impacto no planejamento de lavra, considerando variações e incertezas relacionadas ao modelo geológico e estimativa de teores. / From exploration to mine planning, methodologies for quantifying the risk associated with mining enterprise can dramatically improve decision making process. Small variations in the boundary conditions of a project may have significant impact on the final return of the same. Within this context, in mining, geological uncertainty is seen as a major factor contributing to the failure of the project. The need to quantify and manage the geological risk for project evaluation and decision making can be translated into the need to assess the geological risk of any parameter at all stages, from the resources quantification, mining sequencing to reserves exhaustion. In addition, the geological uncertainty can be translated into financial risk, providing an analysis of the economic feasibility of the project. However, the need for quantification of geological uncertainty was already recognized by the mining industry since the 1970, where local and global estimates were considered insufficient for the optimization of production planning, sequencing mining, strategies of homogenization. Thus, the stochastic simulation has played a crucial role in the construction of grade uncertainty models in mineral deposits, providing a tool to perform risk analysis. This study aims to develop a methodology able to contribute in building scenarios of mine planning and evaluation of the impact caused by geological uncertainties supplied from simulated models. Answers searched using the suggested approach include understand the definition of a methodology to control and mine planning incorporating the local uncertainty associated with the ore, assessing the sensitivity of financial return and mine planning considering variantions and uncertainty related to the geological model and grade estimation.
27

Utilização de simulação conjunta colocada com variável supersecundária para construção de modelo geometalúrgico de nióbio Araxá-MG

Braga Júnior, José Marques January 2017 (has links)
Modelo de blocos para teor é um recurso comumente utilizado pelo planejamento de lavra na indústria mineira. Na maioria dos casos o conhecimento sobre os teores das variáveis químicas não é suficiente para prever o desempenho geometalúrgico do minério quando submetido ao processo de concentração. A geometalurgia engloba um conjunto de testes de comportamento metalúrgico do minério e seus resultados são incorporados ao modelo de bloco, ajudando a tornar o planejamento da lavra mais preciso quanto à capacidade de produção, melhorando os ganhos financeiros e reduzindo os riscos associados à lavra e a tomada de decisões. A recuperação metalúrgica de nióbio mede o quanto do conteúdo metálico de interesse no minério é recuperado no concentrado após o processamento mineral. Esta informação é muitas vezes subutilizada no modelo de bloco devido à baixa quantidade de dados primários, o que dificulta a construção de um modelo de bloco confiável. No entanto, para complementar a variável de interesse, informações secundárias de outros atributos podem ser utilizadas. A cossimulacão de informações não aditivas em depósitos multivariados com mais de duas variáveis secundárias envolvidas é extremamente trabalhosa e normalmente seus resultados precisam ser ajustados posteriormente. A necessidade de ajustes posteriores, aliada a falta de praticidade da maioria dos métodos de cossimulação, motiva a busca por solucões alternativas que gerem resultados tão ou mais precisos e que sejam de fácil aplicação na rotina de modelamento geológico. É comum que os programas utilizados para a cossimulação se baseiem em uma única variável secundária, porém, o fenômeno analisado pode estar sendo influenciado por vários fatores, neste caso, o uso combinado de todos fatores relevantes pode melhorar a predição da variável de interesse. O uso de múltiplas variáveis secundárias pode ser gerenciado criando-se uma variável supersecundária. Neste caso, a quimiometria pode ser aplicada, resolvendo problemas preditivos e modelando propriedades de sistemas químicos visando prever a recuperação metalúrgica. Nesse trabalho, após a combinação de múltiplas variáveis em um preditivo supersecundário, a cossimulação sequencial gaussiana foi aplicada para gerar o modelo geometalúrgico. A simulação conjunta colocada permite a simulação conjunta do dado supersecundário com o dado primário, integrando mais informações para melhorar a predição da recuperação metalúrgica do nióbio. A cossimulação foi realizada com base no modelo de corregionalização de Markov para simplificar a modelagem da covariância cruzada. O modelo probabilístico geometalúrgico obtido se mostrou eficiente, mantendo uma precisão adequada na previsão da variável de interesse. / Grade block models are a standard input in mine planning throughout the mining industry. In most cases, the ore grades knowledge is not enough to predict the behavior of the ore at the processing plant. Geometallurgy comprises a set of ore metallurgical behavior tests and their results incorporated into the block model, helping in making mine planning more precise when it comes to the production capacity, improving financial earnings and reducing risks. Niobium Metallurgical Recovery is a very important variable to be controlled, measuring how much of the metal content in the ore is recovered in the concentrate after mineral processing. This information is often underused in the block model due to the low quantity of primary data, which makes the construction of a reliable block model difficult. However, to supplement the variable of interest, secondary information from other attributes can be used. Cosimulation of non-additive information in multivariate deposits with more than two secondary variables involved is extremely labor-intensive and its results usually need to be later adjusted. The need for subsequent adjustments, combined with the lack of practicality of most cossimulation methods, motivates the search for alternative solutions that generate results that are as accurate and easy to apply in the routine of geological modeling in the mineral industry. In multivariate geostatistics most programs used for cosimulation are based on one secondary variables. Frequently the analyzed phenomenon is influenced by several factors. In this case, the use of them combined can improve the prediction of the variable of interest. The use of multiple secondary variables can be managed by creating a super-secondary variable. In this case, chemometrics can be applied, solving predictive problems, modeling properties of chemical systems aiming at predicting the metallurgical recovery. After combining multiple variables into a super-secondary predictive, Sequential Gaussian Cosimulation was applied in this study to generate a geometallurgical model. The collocated joint simulation allows the joint simulation of a super-secondary data with the primary data, integrating more information to improve the cosimulation of the niobium metallurgical recovery. The cosimulation was run based on the Markov coregionalization model to simplify the cross-covariance modeling. The result is a representative probabilistic geometallurgical model, which proved to be efficient maintaining an adequate precision in forecasting the predicted variable.
28

Verificação da aplicabilidade do programa MAFMO como ferramenta auxiliar na estimativa de custos em projetos conceituais

Carriconde, Milton Correa January 2010 (has links)
Os empreendimentos em mineração são frequentemente classificados como de elevado fator de risco econômico por associarem características de investimentos elevados, com longo tempo de preparação e com certo grau de incertezas no que se refere a reservas geológicas ou caracterização tecnológica do minério. Portanto, é imperativo que a continuidade de um projeto, desde a prospecção geológica, seja acompanhada por frequentes reavaliações técnicas e econômicas, de forma que, a decisão de prosseguir seja respaldada pela aferição da viabilidade do empreendimento à luz das novas informações agregadas ao longo de seu desenvolvimento. As avaliações efetuadas nas etapas preliminares são, em geral, estimativas grosseiras, pois as informações disponíveis sobre a jazida e o minério estão incompletas e somente serão intensificadas se houver intenção de prosseguir no projeto, mas essa decisão deverá ser tomada com base nas avaliações econômicas preliminares. Alguns modelos de cálculo estimativo de custos de implantação e operação de instalações mineiras e de beneficiamento de minério foram desenvolvidos para auxiliar o profissional de engenharia de minas nessa tarefa. Alguns deles estão disponíveis em aplicativos para computadores. Este trabalho avalia a aplicabilidade do programa MAFMO – Modele d’Analyse Financière sur Micro-Ordenateur, desenvolvido no Centre de Géotechnique et d’Exploitation du Sous-sol da Ecole National Superieure dês Mines de Paris, que utiliza modelos matemáticos desenvolvidos por T. Alan O’Hara em 1980, para determinação de parâmetros econômicos adequados para proceder a avaliação econômica de um empreendimento mineiro. O estudo é desenvolvido para comparação dos resultados de avaliação do MAFMO, em três exemplos de jazida reais, com os valores de investimentos e custos operacionais calculados a partir de Projetos Conceituais, para lavra a céu aberto. / Mining ventures are, frequently, qualified as an activity with elevated economical risk factor joining characteristics of high investment, long preparation time and a substantial amount of uncertainty about geological reserves and technological characteristics of ore. Therefore, it is paramount for the continuity of a mining project, starting from the geological prospection, to be followed closely by technical and economical revaluations so that the decision to proceed or to stop, anytime, can be supported, or reviewed by every new datum added. Preliminary evaluations are, usually, an exercise of forecasting. The available information about the ore body shape or the ore qualities are quite incomplete at the beginning and will be detailed as long as the project proceeds based on favorable economical prognostic. There are some mathematical models that can help the mining engineer on that task of estimating investment and operational costs on mine and mineral process plant. Some of those models are available as computer software. This work evaluates the application of the software MAFMO - Modele d’Analyse Financière sur Micro-Ordenateur, developed by Centre de Géotechnique et d’Exploitation du Sous-sol da Ecole National Superieure dês Mines de Paris, which utilizes a cost estimation model, prepared by T. Alan O’Hara in 1980, to estimate suitable parameters such as capital investments and operating costs for a mine and processing plant. This study compares the results given by MAFMO software applied on actual ore bodies, with values attained from three different conceptual projects developed for preliminary feasibility studies for open pit mining exploitation.
29

Análise da sensibilidade do seqüenciamento de lavra em função da incerteza do modelo geológico

Peroni, Rodrigo de Lemos January 2002 (has links)
Quantificação de incerteza e risco tem aplicação direta no projeto de limites de cava e na programação de produção. Pequenas variações nas condições de contorno de um projeto podem ter impacto significativo sobre o retorno final do mesmo na ordem de milhões de dólares. Preço de mercado do bem mineral, o custo de capital, taxas de atratividade, etc, são fatores usualmente testados para analisar a viabilidade de um empreendimento, porém, raramente é considerada a incerteza relacionada ao atributo geológico em questão. O propósito de um planejamento de lavra tem sido prover subsidio para o engenheiro de minas decidir sobre a capacidade de minerar determinadas unidades de lavra do depósito a partir de teores estimados. Salienta-se porém que existe, a partir dos dados amostrais, incertezas a respeito do modelo geológico que devem ser consideradas ao se projetar uma cava e desenvolver a lavra. A simulação geoestatistica tem a capacidade de produzir múltiplos modelos equiprováveis, os quais podem ser avaliados independentementecomo possíveis cenários do depósito mineral. Simulação condicional, ao contrário de técnicas de interpolação e estimativa, provê respostas para questões associadas a risco devido à variações nos teores do modelo geológico. Ao gerar múltiplos cenários tem-se acesso à probabilidade e conseqüentemente às variações de retorno financeiro e rotas de extração de minério de um projeto. o presente trabalho tem como objetivo a investigação de novas metodologias que contribuam para a construção de cenários de planejamento de lavra e avaliação do impacto provocado nestes pela incerteza fornecida a partir de modelos simulados. As respostas buscadas dentro da abordagem sugerida por esse trabalho, compreendem a definição de uma metodologia para controle e planejamento de lavra a médio e longo prazo por incorporação da flutuabilidade local associada ao minério, avaliando a sensibilidade do retorno financeiro e o traçado de lavra em relação ao método de geração do modelo geológico de teores. Para solucionar o problema em questão, sugere-se a geração de modelos estocásticos e a alimentação de múltiplos modelos selecionados por critérios considerados relevantes para a delimitação do espaço de incerteza. A aplicação de funções de transferência tais como mudança de suporte e seqüenciamento de produção sobre os modelos simulados é a chave para a obtenção de respostas a respeito do impacto sobre a lucratividade de um projeto. Ao alimentar à essas funções modelos equiprováveis que preservam as características estatísticas e a conectividade espacial dos dados amostrais mas que invariavelmente possuem diferentes distribuições de teores tem-se a dimensão em termos econômicos do risco associado à incerteza geológica. Foi confrontado o retorno financeiro produzido por modelos simulados e verificou-se para o caso especifico que os métodos de simulação geoestatistica empregados não produziram diferenças significativas quando comparados casos selecionados segundo os mesmos critérios. Porém, entre cenários extremos gerados pelo mesmo algoritmo de simulação foram verificadas desigualdades relevantes. Verificou-se também a transferência de minério entre diferentes classes de qualidade ao proceder-se com variações nas dimensões dos blocos de lavra.
30

Verificação da aplicabilidade do programa MAFMO como ferramenta auxiliar na estimativa de custos em projetos conceituais

Carriconde, Milton Correa January 2010 (has links)
Os empreendimentos em mineração são frequentemente classificados como de elevado fator de risco econômico por associarem características de investimentos elevados, com longo tempo de preparação e com certo grau de incertezas no que se refere a reservas geológicas ou caracterização tecnológica do minério. Portanto, é imperativo que a continuidade de um projeto, desde a prospecção geológica, seja acompanhada por frequentes reavaliações técnicas e econômicas, de forma que, a decisão de prosseguir seja respaldada pela aferição da viabilidade do empreendimento à luz das novas informações agregadas ao longo de seu desenvolvimento. As avaliações efetuadas nas etapas preliminares são, em geral, estimativas grosseiras, pois as informações disponíveis sobre a jazida e o minério estão incompletas e somente serão intensificadas se houver intenção de prosseguir no projeto, mas essa decisão deverá ser tomada com base nas avaliações econômicas preliminares. Alguns modelos de cálculo estimativo de custos de implantação e operação de instalações mineiras e de beneficiamento de minério foram desenvolvidos para auxiliar o profissional de engenharia de minas nessa tarefa. Alguns deles estão disponíveis em aplicativos para computadores. Este trabalho avalia a aplicabilidade do programa MAFMO – Modele d’Analyse Financière sur Micro-Ordenateur, desenvolvido no Centre de Géotechnique et d’Exploitation du Sous-sol da Ecole National Superieure dês Mines de Paris, que utiliza modelos matemáticos desenvolvidos por T. Alan O’Hara em 1980, para determinação de parâmetros econômicos adequados para proceder a avaliação econômica de um empreendimento mineiro. O estudo é desenvolvido para comparação dos resultados de avaliação do MAFMO, em três exemplos de jazida reais, com os valores de investimentos e custos operacionais calculados a partir de Projetos Conceituais, para lavra a céu aberto. / Mining ventures are, frequently, qualified as an activity with elevated economical risk factor joining characteristics of high investment, long preparation time and a substantial amount of uncertainty about geological reserves and technological characteristics of ore. Therefore, it is paramount for the continuity of a mining project, starting from the geological prospection, to be followed closely by technical and economical revaluations so that the decision to proceed or to stop, anytime, can be supported, or reviewed by every new datum added. Preliminary evaluations are, usually, an exercise of forecasting. The available information about the ore body shape or the ore qualities are quite incomplete at the beginning and will be detailed as long as the project proceeds based on favorable economical prognostic. There are some mathematical models that can help the mining engineer on that task of estimating investment and operational costs on mine and mineral process plant. Some of those models are available as computer software. This work evaluates the application of the software MAFMO - Modele d’Analyse Financière sur Micro-Ordenateur, developed by Centre de Géotechnique et d’Exploitation du Sous-sol da Ecole National Superieure dês Mines de Paris, which utilizes a cost estimation model, prepared by T. Alan O’Hara in 1980, to estimate suitable parameters such as capital investments and operating costs for a mine and processing plant. This study compares the results given by MAFMO software applied on actual ore bodies, with values attained from three different conceptual projects developed for preliminary feasibility studies for open pit mining exploitation.

Page generated in 0.1437 seconds