• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 72
  • Tagged with
  • 72
  • 72
  • 30
  • 24
  • 21
  • 18
  • 15
  • 15
  • 12
  • 12
  • 9
  • 9
  • 9
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Influência do nível freático no sequenciamento de lavra aplicado ao planejamento estratégico de lavra

Fontes, Marcélio Prado January 2016 (has links)
Desenvolver o sequenciamento de mina envolve muitos fatores e uma grande quantidade de informações, consequentemente, a rentabilidade do projeto dependerá fortemente do cronograma de produção. Um projeto de mineração pode estar condicionado ao sequenciamento não ideal, o que afeta os resultados econômicos do projeto e também leva a uma utilização inadequada dos recursos minerais. Durante o sequenciamento da mina é necessário tomar decisões para cada bloco durante a extração, tais como: 1) Se um determinado bloco deve ou não ser minerado; 2) Se minerado, quando deveria ser extraído; 3) Uma vez extraído, como e quando deve ser processado. Essas decisões são fatores variáveis do fluxo de caixa que afetam um dado projeto. Via de regra, o limite da cava final é otimizado para um conjunto fixo de parâmetros (preço, custos, modelos de recursos etc.), sabendo que mudanças nesses parâmetros terão impactos sobre a vida do projeto. Incertezas são avaliadas apenas em analises de sensibilidade posteriores. O método convencional de sequenciar uma mina é dividido em três etapas principais: primeiro, delinear a cava final; segundo, dividir a cava final em pushbacks (avanços de lavra) e terceiro, definir os blocos do sequenciamento em cada um desses pushbacks levando em consideração a mina, a planta de processamento e as capacidades de mercado. Contudo, existem aspectos que não são geralmente incorporados no sequenciamento de produção como inclusão de minério abaixo do nível freático. Esse aspecto, por exemplo, impõe algumas limitações de avanços verticais que devem ser consideradas. O objetivo deste estudo é demonstrar a relevância e o impacto do lençol freático como restrição adicional no resultado do VPL (Valor Presente Líquido). Inclui-se como uma condição de contorno relacionada com a necessidade de rebaixamento do nível freático, considerando as variáveis: teor e relação estéril/minério no sequenciamento de uma mina de fosfato. A metodologia adotada consiste em fazer ajustes na determinação dos pushbacks dentro da cava final, respeitando as condições de contorno e perseguindo a rentabilidade global como objetivo principal do processo de otimização. / Developing mine sequencing involves many factors and a large amount of information, consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of mineral resources. During the mine sequencing it is necessary to make decisions for each block during extraction, such as: 1) If a particular block should or should not be mined; 2) If mined, when it should be extracted; 3) Once extracted, how and when it should be processed. These decisions are variable factors of cash flow that affect a given project. Normally, the final pit limit is optimized for a fixed set of parameters (price, costs, resource model, etc.), knowing that changes in these parameters will have impact on the life of mine plan. Uncertainties are held only in subsequent sensitivity analyzes. The conventional method of sequencing a mine is divided into three main steps: First the delineation of the final pit; second, subdividing the final pit in operational pushbacks (mining advances) and third, sequencing blocks in each of these pushbacks, taking into consideration the mine, processing plant and market capacities. However, there are aspects that are not usually incorporated into the production scheduling, including mining ore below the water table, this aspect imposes some vertical mining advancement constraints that must be considered. The objective of this study is to demonstrate the relevance and impact on the NPV result from the water level as a constraint related to the need for water table drawdown, also considering grades and stripping ratio variability during the mining sequence for a phosphate mine. The methodology adopted considers adjustments when determining each pushback within the limit of the final pit, trying to respect the constraints and pursuing global profitability as the main goal of the optimization process.
42

Sistematização do cálculo de diluição e perdas operacionais para reconciliação de teores e massas em larva a céu aberto

Câmara, Taís Renata January 2013 (has links)
Em lavra a céu aberto, a diluição nem sempre é um fator analisado e calculado sistematicamente, muitas vezes é apenas um número ajustado para atender necessidades de auditorias, por exemplo. A diluição, assim como a perda, são fatores que devem ser sempre considerados nas estimativas de teores e massas para quantificação de reservas. Estes fatores andam sempre conjugados e são determinados considerando diversas particularidades do depósito (complexidade geológica, geometria do corpo de minério, dureza da rocha, etc.) e características da operação (equipamentos, geometria de cava, habilidade dos operadores, entre outros). O principal objetivo deste estudo é a determinação de um fator de diluição que possa ser utilizado no planejamento de lavra (modelo de estimativas), levando em consideração diversas particularidades do depósito e da operação, além de considerar fatores objetivos relacionados à geometria. A reconciliação pode ser definida como uma comparação entre teores e massas estimados no modelo de blocos com as medidas reais dos teores e massas produzidos, dentro de um mesmo volume. O processo de reconciliação de teor e massa entre o planejamento e o executado atua como uma maneira para verificar se o planejamento está adequado, e se não estiver, identificar onde se encontram os problemas de falta de aderência. Além de verificar a confiabilidade dos procedimentos de construção do modelo utilizado, a reconciliação permite definir medidas corretivas e priorizá-las para aproximar os resultados entre produção e o planejamento. Para saber se o fator de diluição utilizado está correto e adequado às necessidades do depósito é necessário primeiramente, saber se existe uma boa aderência na reconciliação entre planejado e executado. Com o resultado, é possível saber quais fatores estão sendo causadores de diluição e/ou perdas de minério e onde estes estão ocorrendo. O fator de diluição pode ser uma ferramenta muito positiva se aplicado de maneira correta, já que este varia a partir de diferentes etapas ao longo do planejamento de mina, influenciando áreas a serem mineradas, orçamentos, eficiência da produção e também melhora do resultado financeiro do projeto. / In open pit mining, not always the dilution is a factor analyzed and systematically calculated, often is only a number adjusted for attending the needs of audits, for example. The dilution, as well as loss, are factors that should be always considered for tonnage and grade estimates during mine planning. These factors are always associated and can be determined considering several particularities of the deposit (like geology complexity, orebody geometry, rock hardness, etc.) and the operation itself (e.g. mining equipment, pit design, experience, among others). The main objective of this study is to determine a dilution factor that can be used in mine planning (estimation model), taking into consideration those particularities of the deposit and operation, besides considering objective factors related to the geometry. Reconciliation could be defined as a comparison of predicted grade and tonnage from the block model estimates against the effective measures of mined mass and produced ore, within a block. The reconciliation process of grade and mass of planning against executed is a way to check if planning is appropriate, and if not, identify where the problems of lack of adherence are. In addition to checking the reliability of the procedures used in the block model creation, reconciliation allows one to define corrective measures and prioritize them to optimize production and planning. To understand if the dilution factor used is correct and appropriate to the needs of the deposit it is first required knowing if there is a good adherence in reconciliation between planned and executed. With the results, is possible to know which factors are causing dilution and/or losses of ore and where they are occurring. The dilution factor can become a very positive tool if better assessed, because it varies from different locations along the mine planning, influencing areas to be mined; budgets; production efficiency and also profit increase.
43

Sistematização do cálculo de diluição e perdas operacionais para reconciliação de teores e massas em larva a céu aberto

Câmara, Taís Renata January 2013 (has links)
Em lavra a céu aberto, a diluição nem sempre é um fator analisado e calculado sistematicamente, muitas vezes é apenas um número ajustado para atender necessidades de auditorias, por exemplo. A diluição, assim como a perda, são fatores que devem ser sempre considerados nas estimativas de teores e massas para quantificação de reservas. Estes fatores andam sempre conjugados e são determinados considerando diversas particularidades do depósito (complexidade geológica, geometria do corpo de minério, dureza da rocha, etc.) e características da operação (equipamentos, geometria de cava, habilidade dos operadores, entre outros). O principal objetivo deste estudo é a determinação de um fator de diluição que possa ser utilizado no planejamento de lavra (modelo de estimativas), levando em consideração diversas particularidades do depósito e da operação, além de considerar fatores objetivos relacionados à geometria. A reconciliação pode ser definida como uma comparação entre teores e massas estimados no modelo de blocos com as medidas reais dos teores e massas produzidos, dentro de um mesmo volume. O processo de reconciliação de teor e massa entre o planejamento e o executado atua como uma maneira para verificar se o planejamento está adequado, e se não estiver, identificar onde se encontram os problemas de falta de aderência. Além de verificar a confiabilidade dos procedimentos de construção do modelo utilizado, a reconciliação permite definir medidas corretivas e priorizá-las para aproximar os resultados entre produção e o planejamento. Para saber se o fator de diluição utilizado está correto e adequado às necessidades do depósito é necessário primeiramente, saber se existe uma boa aderência na reconciliação entre planejado e executado. Com o resultado, é possível saber quais fatores estão sendo causadores de diluição e/ou perdas de minério e onde estes estão ocorrendo. O fator de diluição pode ser uma ferramenta muito positiva se aplicado de maneira correta, já que este varia a partir de diferentes etapas ao longo do planejamento de mina, influenciando áreas a serem mineradas, orçamentos, eficiência da produção e também melhora do resultado financeiro do projeto. / In open pit mining, not always the dilution is a factor analyzed and systematically calculated, often is only a number adjusted for attending the needs of audits, for example. The dilution, as well as loss, are factors that should be always considered for tonnage and grade estimates during mine planning. These factors are always associated and can be determined considering several particularities of the deposit (like geology complexity, orebody geometry, rock hardness, etc.) and the operation itself (e.g. mining equipment, pit design, experience, among others). The main objective of this study is to determine a dilution factor that can be used in mine planning (estimation model), taking into consideration those particularities of the deposit and operation, besides considering objective factors related to the geometry. Reconciliation could be defined as a comparison of predicted grade and tonnage from the block model estimates against the effective measures of mined mass and produced ore, within a block. The reconciliation process of grade and mass of planning against executed is a way to check if planning is appropriate, and if not, identify where the problems of lack of adherence are. In addition to checking the reliability of the procedures used in the block model creation, reconciliation allows one to define corrective measures and prioritize them to optimize production and planning. To understand if the dilution factor used is correct and appropriate to the needs of the deposit it is first required knowing if there is a good adherence in reconciliation between planned and executed. With the results, is possible to know which factors are causing dilution and/or losses of ore and where they are occurring. The dilution factor can become a very positive tool if better assessed, because it varies from different locations along the mine planning, influencing areas to be mined; budgets; production efficiency and also profit increase.
44

Influência do nível freático no sequenciamento de lavra aplicado ao planejamento estratégico de lavra

Fontes, Marcélio Prado January 2016 (has links)
Desenvolver o sequenciamento de mina envolve muitos fatores e uma grande quantidade de informações, consequentemente, a rentabilidade do projeto dependerá fortemente do cronograma de produção. Um projeto de mineração pode estar condicionado ao sequenciamento não ideal, o que afeta os resultados econômicos do projeto e também leva a uma utilização inadequada dos recursos minerais. Durante o sequenciamento da mina é necessário tomar decisões para cada bloco durante a extração, tais como: 1) Se um determinado bloco deve ou não ser minerado; 2) Se minerado, quando deveria ser extraído; 3) Uma vez extraído, como e quando deve ser processado. Essas decisões são fatores variáveis do fluxo de caixa que afetam um dado projeto. Via de regra, o limite da cava final é otimizado para um conjunto fixo de parâmetros (preço, custos, modelos de recursos etc.), sabendo que mudanças nesses parâmetros terão impactos sobre a vida do projeto. Incertezas são avaliadas apenas em analises de sensibilidade posteriores. O método convencional de sequenciar uma mina é dividido em três etapas principais: primeiro, delinear a cava final; segundo, dividir a cava final em pushbacks (avanços de lavra) e terceiro, definir os blocos do sequenciamento em cada um desses pushbacks levando em consideração a mina, a planta de processamento e as capacidades de mercado. Contudo, existem aspectos que não são geralmente incorporados no sequenciamento de produção como inclusão de minério abaixo do nível freático. Esse aspecto, por exemplo, impõe algumas limitações de avanços verticais que devem ser consideradas. O objetivo deste estudo é demonstrar a relevância e o impacto do lençol freático como restrição adicional no resultado do VPL (Valor Presente Líquido). Inclui-se como uma condição de contorno relacionada com a necessidade de rebaixamento do nível freático, considerando as variáveis: teor e relação estéril/minério no sequenciamento de uma mina de fosfato. A metodologia adotada consiste em fazer ajustes na determinação dos pushbacks dentro da cava final, respeitando as condições de contorno e perseguindo a rentabilidade global como objetivo principal do processo de otimização. / Developing mine sequencing involves many factors and a large amount of information, consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of mineral resources. During the mine sequencing it is necessary to make decisions for each block during extraction, such as: 1) If a particular block should or should not be mined; 2) If mined, when it should be extracted; 3) Once extracted, how and when it should be processed. These decisions are variable factors of cash flow that affect a given project. Normally, the final pit limit is optimized for a fixed set of parameters (price, costs, resource model, etc.), knowing that changes in these parameters will have impact on the life of mine plan. Uncertainties are held only in subsequent sensitivity analyzes. The conventional method of sequencing a mine is divided into three main steps: First the delineation of the final pit; second, subdividing the final pit in operational pushbacks (mining advances) and third, sequencing blocks in each of these pushbacks, taking into consideration the mine, processing plant and market capacities. However, there are aspects that are not usually incorporated into the production scheduling, including mining ore below the water table, this aspect imposes some vertical mining advancement constraints that must be considered. The objective of this study is to demonstrate the relevance and impact on the NPV result from the water level as a constraint related to the need for water table drawdown, also considering grades and stripping ratio variability during the mining sequence for a phosphate mine. The methodology adopted considers adjustments when determining each pushback within the limit of the final pit, trying to respect the constraints and pursuing global profitability as the main goal of the optimization process.
45

Uso de informação secundária imprecisa e inacurada no planejamento de curto prazo

Araújo, Cristina da Paixão January 2015 (has links)
No setor de mineração, a amostragem está presente no empreendimento mineral desde a fase da exploração até a lavra. Para diminuir a incerteza na previsão de teores, o planejamento de lavra requer adensamento da amostragem para garantir previsões acuradas e precisas. Acredita-se, que quanto maior a quantidade de amostras, maior a confiabilidade nas estimativa de teores. Na fase exploração, geralmente, a amostragem é realizada por furos de sondagem com coroas diamantadas, que é uma técnica com alto custo de execução e produz amostras com acuracidade e precisão. Nesta fase, existem poucos dados com alta qualidade. Já na fase operacional, a amostragem é realizada por outras técnicas devido a restrições orçamentárias e ao alto custo de execução da sondagem diamantada. Em geral, estas amostras possuem baixa qualidade (imprecisas e inacuradas) e não são submetidas a protocolos de controle que qualidade. Logo, nesta fase existem muitos dados com baixa qualidade com erro de vies e precisao. Esta dissertação avalia o impacto do uso de dados imprecisos no planejamento de curto prazo. Para isto, foram analisados dois bancos de dados distintos. O primeiro estudo utiliza o banco de dados exaustivo Walker Lake, que foi usado e considerado como o teor real do depósito. Inicialmente, as amostras foram obtidas a partir do conjunto de dados com espaçamento regular de 20×20 m e 5×5 m, a partir do banco de dados exaustivo. Um erro relativo de ±25% (imprecisão) e 10% de viés foram adicionados aos dados espaçados a 5×5 m (dados geológicos curto prazo) em diferentes cenários. Depois foram estudadas diferentes metodologias para incorporar a informação imprecisa nas estimativas. O segundo estudo é realizado em uma mina de ouro, com dois tipos de dados diferentes, a furos de sondagem (dados primários) e circulação reversa (dados secundários). Nestes estudos foram investigadas duas metodologias: cokrigagem e krigagem ordinária, e os dados foram utilizados para estimar blocos. As curvas teor tonelagem, análise de deriva e a classificação errônea dos blocos foram avaliadas para cada estudo. Para o banco de dados, Walker Lake, os resultados mostraram que o uso da cokrigagem ordinária estandardizada é a melhor metodologia em situações que existem dados imprecisos e enviesados, com boa correlação entre as variáveis primárias e secundárias. As estimativas produzidas são mais próximas da distribuição real dos blocos, reduzindo o erro de classificação dos blocos. Já para o banco de dados de Ouro, as amostras possuem moderada correlaçao e continuidade espacial curta para pequenas distâncias do depósito. Nesta situação, a correção da imprecisão da variável secundária utilizando a krigagem ordinária produziram melhores resultados com estimativas menos enviesadas e melhor classificação dos blocos como minério e estéril. / Decisions starting at mineral exploration through mining are based on grade block models obtained from samples. To decrease the uncertainty in the estimates, the short term mining planning requires additional sampling to ensure accurate and precise predictions. As more samples are made available, there is trend towards more reliable estimates. In the exploration stage, usually, sampling is performed by diamond drill holes (DDH), which are expensive but produces accurate and precise samples. In this stage there are few data with high quality. In the production stage, sampling is obtained by other techniques due to the high costs of DDHs. In general, these samples have low quality and are not controlled by QA / QC protocols. This study evaluates the impact of using imprecise data in short-term mineplanning. For this, it was analyzed two different data sets. The first case used the exhaustive Walker Lake dataset as the source to obtain the true and sampled grades. Initially, samples were obtained from the exhaustive dataset at regularly spaced grids at 20 × 20 m and 5 × 5 meters. A relative error (imprecision) of ± 25% and a 10% bias were added to the data spaced at 5 × 5 m (short-term geological data) in different scenarios. The second study is in a gold mine with two different types of data obtained from diamond drilling holes (DDH_Hard data) and reverse circulation (RC_Soft data).To combine these different types of data, two methodologies were investigated: cokriging and ordinary kriging. Both types of data were used to estimate a block model using the two methodologies. The grade tonnage curves and swath plots were used to compare the results against the true block grades at the same block support. In addition, the block misclassification was evaluated. In the Walker Lake the results show that standardized ordinary cokriging is a better methodology for imprecise and biased data and produces estimates closer to the true grade block distribution, reducing block misclassification. For the data set at the underground mine gold, the samples had moderate correlation and short spatial continuity for small distances at this deposit. In this situation, the estimates using ordinary kriging with hard and soft data (standardized and re-escaled) produced better results with less bias and better blocks classification of ore and waste.
46

Uso de informação secundária imprecisa e inacurada no planejamento de curto prazo

Araújo, Cristina da Paixão January 2015 (has links)
No setor de mineração, a amostragem está presente no empreendimento mineral desde a fase da exploração até a lavra. Para diminuir a incerteza na previsão de teores, o planejamento de lavra requer adensamento da amostragem para garantir previsões acuradas e precisas. Acredita-se, que quanto maior a quantidade de amostras, maior a confiabilidade nas estimativa de teores. Na fase exploração, geralmente, a amostragem é realizada por furos de sondagem com coroas diamantadas, que é uma técnica com alto custo de execução e produz amostras com acuracidade e precisão. Nesta fase, existem poucos dados com alta qualidade. Já na fase operacional, a amostragem é realizada por outras técnicas devido a restrições orçamentárias e ao alto custo de execução da sondagem diamantada. Em geral, estas amostras possuem baixa qualidade (imprecisas e inacuradas) e não são submetidas a protocolos de controle que qualidade. Logo, nesta fase existem muitos dados com baixa qualidade com erro de vies e precisao. Esta dissertação avalia o impacto do uso de dados imprecisos no planejamento de curto prazo. Para isto, foram analisados dois bancos de dados distintos. O primeiro estudo utiliza o banco de dados exaustivo Walker Lake, que foi usado e considerado como o teor real do depósito. Inicialmente, as amostras foram obtidas a partir do conjunto de dados com espaçamento regular de 20×20 m e 5×5 m, a partir do banco de dados exaustivo. Um erro relativo de ±25% (imprecisão) e 10% de viés foram adicionados aos dados espaçados a 5×5 m (dados geológicos curto prazo) em diferentes cenários. Depois foram estudadas diferentes metodologias para incorporar a informação imprecisa nas estimativas. O segundo estudo é realizado em uma mina de ouro, com dois tipos de dados diferentes, a furos de sondagem (dados primários) e circulação reversa (dados secundários). Nestes estudos foram investigadas duas metodologias: cokrigagem e krigagem ordinária, e os dados foram utilizados para estimar blocos. As curvas teor tonelagem, análise de deriva e a classificação errônea dos blocos foram avaliadas para cada estudo. Para o banco de dados, Walker Lake, os resultados mostraram que o uso da cokrigagem ordinária estandardizada é a melhor metodologia em situações que existem dados imprecisos e enviesados, com boa correlação entre as variáveis primárias e secundárias. As estimativas produzidas são mais próximas da distribuição real dos blocos, reduzindo o erro de classificação dos blocos. Já para o banco de dados de Ouro, as amostras possuem moderada correlaçao e continuidade espacial curta para pequenas distâncias do depósito. Nesta situação, a correção da imprecisão da variável secundária utilizando a krigagem ordinária produziram melhores resultados com estimativas menos enviesadas e melhor classificação dos blocos como minério e estéril. / Decisions starting at mineral exploration through mining are based on grade block models obtained from samples. To decrease the uncertainty in the estimates, the short term mining planning requires additional sampling to ensure accurate and precise predictions. As more samples are made available, there is trend towards more reliable estimates. In the exploration stage, usually, sampling is performed by diamond drill holes (DDH), which are expensive but produces accurate and precise samples. In this stage there are few data with high quality. In the production stage, sampling is obtained by other techniques due to the high costs of DDHs. In general, these samples have low quality and are not controlled by QA / QC protocols. This study evaluates the impact of using imprecise data in short-term mineplanning. For this, it was analyzed two different data sets. The first case used the exhaustive Walker Lake dataset as the source to obtain the true and sampled grades. Initially, samples were obtained from the exhaustive dataset at regularly spaced grids at 20 × 20 m and 5 × 5 meters. A relative error (imprecision) of ± 25% and a 10% bias were added to the data spaced at 5 × 5 m (short-term geological data) in different scenarios. The second study is in a gold mine with two different types of data obtained from diamond drilling holes (DDH_Hard data) and reverse circulation (RC_Soft data).To combine these different types of data, two methodologies were investigated: cokriging and ordinary kriging. Both types of data were used to estimate a block model using the two methodologies. The grade tonnage curves and swath plots were used to compare the results against the true block grades at the same block support. In addition, the block misclassification was evaluated. In the Walker Lake the results show that standardized ordinary cokriging is a better methodology for imprecise and biased data and produces estimates closer to the true grade block distribution, reducing block misclassification. For the data set at the underground mine gold, the samples had moderate correlation and short spatial continuity for small distances at this deposit. In this situation, the estimates using ordinary kriging with hard and soft data (standardized and re-escaled) produced better results with less bias and better blocks classification of ore and waste.
47

Influência da incerteza dos teores no planejamento de lavra aplicado ao sequenciamento de longo prazo

Cherchenevski, Pablo Koury January 2015 (has links)
O mapeamento da incerteza dos teores através de métodos de simulação geoestatística é uma metodologia que está começando a ser amplamente utilizada na indústria mineira. No entanto, o uso correto desse intervalo de incerteza para os processos subsequentes à avaliação de recursos ainda carece de entendimento e aplicação no setor industrial, onde o modelo de krigagem é empregado para o planejamento de mina. O sequenciamento da produção de longo prazo, com o objetivo de maximizar o Valor Presente Líquido (VPL), é uma das etapas mais importantes no planejamento de lavra e, portanto, o acesso à informação da variabilidade dos teores torna-se de grande importância permitindo a maximização dos lucros e da extração dos recursos. O objetivo deste estudo é avaliar o impacto da incerteza geológica no planejamento de lavra de modo a definir um sequenciamento a partir das simulações. Para isso ser alcançado, propõe-se uma análise probabilística incorporando as incertezas dos teores no sequenciamento de lavra, e quantificando, através de um índice de classificação proposto no estudo, os potenciais ganhos e riscos de perda associado a cada cenário sequenciado. O método de co-simulação por bandas rotativas é utilizado para gerar cenários equiprováveis. Em seguida, o sequenciamento de lavra é definido para cada cenário de teor simulado utilizando um software de otimização. Então, cada sequência de extração dos blocos obtida foi reavaliada para cada simulação de teor. Além disso, um índice de classificação é utilizado para definir o sequenciamento de lavra que gera o maior VPL. Por fim, é realizada uma comparação entre a opção de planejamento selecionada pela metodologia proposta e o modelo utilizado tradicionalmente na indústria obtido a partir de interpolações lineares (krigagem) dos teores. / Mapping grade uncertainty through geostatistical simulation is becoming widely used in the mining industry. However, the proper use of this uncertainty interval for subsequent decision making processes still lacks of understanding and use, where a grade kriging model is mostly employed for mine planning. The long-term scheduling aiming at maximizing Net Present Value (NPV) is one of the most important stages in mine planning, and therefore the assessment of grade variability is of great importance and allowing maximizing profit and resources extraction. The aim of this study is to evaluate the impact of geological uncertainty in mine planning in order to define the best scheduling given grade uncertainty derived from the simulations. For this to be achieved, it is proposed a probabilistic analysis incorporating grade uncertainties in the mining sequencing and quantifying, through a proposed classification index, the potential gains and risks of loss associated with each sequenced scenario. Turning bands algorithm is used to generate equally probable scenarios. Next, it is defined the mining sequence for each grade simulated scenario using an optimization software. Then, each block extraction sequence obtained is reevaluated for each grade simulation. Furthermore, a classification index is used to select the schedule which leads to the highest NPV. Finally, a comparison is performed with the selected schedule and the one obtained using the model traditionally used based on kriged grades.
48

Sistematização do cálculo de diluição e perdas operacionais para reconciliação de teores e massas em larva a céu aberto

Câmara, Taís Renata January 2013 (has links)
Em lavra a céu aberto, a diluição nem sempre é um fator analisado e calculado sistematicamente, muitas vezes é apenas um número ajustado para atender necessidades de auditorias, por exemplo. A diluição, assim como a perda, são fatores que devem ser sempre considerados nas estimativas de teores e massas para quantificação de reservas. Estes fatores andam sempre conjugados e são determinados considerando diversas particularidades do depósito (complexidade geológica, geometria do corpo de minério, dureza da rocha, etc.) e características da operação (equipamentos, geometria de cava, habilidade dos operadores, entre outros). O principal objetivo deste estudo é a determinação de um fator de diluição que possa ser utilizado no planejamento de lavra (modelo de estimativas), levando em consideração diversas particularidades do depósito e da operação, além de considerar fatores objetivos relacionados à geometria. A reconciliação pode ser definida como uma comparação entre teores e massas estimados no modelo de blocos com as medidas reais dos teores e massas produzidos, dentro de um mesmo volume. O processo de reconciliação de teor e massa entre o planejamento e o executado atua como uma maneira para verificar se o planejamento está adequado, e se não estiver, identificar onde se encontram os problemas de falta de aderência. Além de verificar a confiabilidade dos procedimentos de construção do modelo utilizado, a reconciliação permite definir medidas corretivas e priorizá-las para aproximar os resultados entre produção e o planejamento. Para saber se o fator de diluição utilizado está correto e adequado às necessidades do depósito é necessário primeiramente, saber se existe uma boa aderência na reconciliação entre planejado e executado. Com o resultado, é possível saber quais fatores estão sendo causadores de diluição e/ou perdas de minério e onde estes estão ocorrendo. O fator de diluição pode ser uma ferramenta muito positiva se aplicado de maneira correta, já que este varia a partir de diferentes etapas ao longo do planejamento de mina, influenciando áreas a serem mineradas, orçamentos, eficiência da produção e também melhora do resultado financeiro do projeto. / In open pit mining, not always the dilution is a factor analyzed and systematically calculated, often is only a number adjusted for attending the needs of audits, for example. The dilution, as well as loss, are factors that should be always considered for tonnage and grade estimates during mine planning. These factors are always associated and can be determined considering several particularities of the deposit (like geology complexity, orebody geometry, rock hardness, etc.) and the operation itself (e.g. mining equipment, pit design, experience, among others). The main objective of this study is to determine a dilution factor that can be used in mine planning (estimation model), taking into consideration those particularities of the deposit and operation, besides considering objective factors related to the geometry. Reconciliation could be defined as a comparison of predicted grade and tonnage from the block model estimates against the effective measures of mined mass and produced ore, within a block. The reconciliation process of grade and mass of planning against executed is a way to check if planning is appropriate, and if not, identify where the problems of lack of adherence are. In addition to checking the reliability of the procedures used in the block model creation, reconciliation allows one to define corrective measures and prioritize them to optimize production and planning. To understand if the dilution factor used is correct and appropriate to the needs of the deposit it is first required knowing if there is a good adherence in reconciliation between planned and executed. With the results, is possible to know which factors are causing dilution and/or losses of ore and where they are occurring. The dilution factor can become a very positive tool if better assessed, because it varies from different locations along the mine planning, influencing areas to be mined; budgets; production efficiency and also profit increase.
49

Análise de expansão de cava com múltiplas restrições de superfície sob incerteza geológica

Kuckartz, Bruno Tomasi January 2017 (has links)
A operação e gerência de empreendimentos mineiros são tarefas normalmente difíceis e complexas. Para otimizar toda a operação, os engenheiros precisam lidar com muitos aspectos técnicos e restrições, como a modelagem geológica, estimativa de reservas, determinação da necessidade de blendagem, projeto das cavas ótimas e operacionais, custos operacionais, questões ambientais, entre outros. Nesse sentido, o posicionamento de infraestruturas de superfície é um dos pontos críticos dentro do planejamento de mina. Aproximar as estruturas da cava, com o intuito de reduzir custos operacionais, pode interferir em eventuais expansões da cava em novos e favoráveis cenários. Nesses casos, impactos no valor presente líquido (VPL) do projeto são inevitáveis e precisam ser tratados tecnicamente, avaliando um grande número de cenários alternativos para delinear uma estratégia que incremente a lucratividade do projeto. O objetivo deste estudo é avaliar, por meio de comparações de VPL entre diferentes cenários de múltiplas restrições de superfície, sob incerteza geológica, a possibilidade de mover pilhas de estéril e outras infraestruturas de suas atuais posições e/ou definir prioridades e mensurar o impacto que cada restrição representa na lucratividade do projeto. A metodologia foi aplicada a uma mina de fosfato para ilustrar como determinar a melhor alternativa em uma perspectiva de planejamento de mina de longo prazo. Utilizando o método de cavas híbridas, aplicado ao modelo de teores simulados, foi possível identificar zonas de probabilidade de ocorrência dentro da cava matemática, o que forneceu informações cruciais para auxiliar na tomada de decisão a respeito da necessidade de relocação de estruturas. / The operation and management of mining enterprises are usually difficult and complex tasks. To optimize the entire operation the engineers must deal with several technical aspects and constraints, such as orebody modelling, reserves estimation, determination of blending necessity, optimum and operational pit designs, operational costs, environmental issues, among others. In this sense, locating surface infrastructures is one of the most critical mine planning concerns. Approximating these structures to the pit, in order to reduce the operational costs, might interfere with future pit expansions in new favorable scenarios. In such cases, impacts on project’s net present value (NPV) are inevitable and must be deal technically, evaluating several alternative scenarios to delineate a strategy to maximize profitability. The aim of this study is to evaluate, through NPV comparisons considering different scenarios with multiple constraints, under geological uncertainty, the possibility of moving waste piles and infrastructure buildings from their current position and/or defining priorities to after measuring the impact that each constraint represents on the project´s profitability. The methodology will be applied to a phosphate mine, to determine the best alternative from a long-term mine planning perspective. Using the hybrid pits method, applied to a simulated grades model, allowed the identification os occurrence probability zones within mathematical pit, providing critical data to support decision making regarding infrastructure relocation.
50

Método para auxílio na definição da quantidade de minério liberado

Fontoura, Daniel Mayer January 2017 (has links)
Em uma operação mineira, a quantidade e a qualidade do minério disponível para alimentação na usina são essenciais para a continuidade e flexibilidade das operações. A quantidade de minério liberado não é considerada em softwares especialistas de sequenciamento de lavra. Geralmente quando o minério liberado é utilizado em rotinas de planejamento, a tonelagem mínima de minério liberado é definida a partir de métodos empíricos. Este estudo desenvolve uma metodologia que auxilia na definição da quantidade de minério liberado a ser considerada nos planos de lavra. Por meio da análise de um estudo de caso, usando krigagem ordinária como método de estimativa e simulação geoestatística para acesso à incerteza, foi avaliado o potencial da metodologia proposta. Foram gerados planos de lavra de cinco anos como referência a partir de cada um dos dois modelos de blocos. Os sequenciamentos de referência foram usados para gerar novos sequenciamentos, com quantidades variáveis de minério liberado (a saber, um, três, cinco e oito meses) para homogeneização na lavra, com posterior alimentação de usina com pilhas de homogeneização. Usando estas possíveis configurações, observou-se o impacto no valor presente líquido de cada um dos cenários e os efeitos do uso de minério liberado na variação de teores para composição de pilhas de homogeneização. A convergência desses critérios é capaz de fornecer diretrizes para a definição da quantidade adequada de minério liberado, a ser usada nos planos de lavra, que permita um balanço entre despesas com antecipação de descobertura para liberação de minério e, também, propicie uma atenuação da variância de teores na formação de pilhas de homogeneização para alimentação da usina. / In a mining operation the quantity and quality of the exposed ore available for plant feeding are essential for the continuity and flexibility of the operations. The quantity of exposed ore it is not considered in the mine sequencing specialist softwares. Generally when esposed ore is considered in mine planning routines, the minimum tonnage of exposed ore is defined by empirical methods. This study develops a methodology that helps in the definition of the quantity of exposed ore to be considered in the mine planning. Trough analyzing a case study, using ordinary kriging and geoestatistical simulation to access the uncertainty, it was evaluated the proposed methodology potential. It was generated five year mine planning as a reference for each one of the two block models. The reference mine plans were used to generate new scenarios with variable quantities of exposed ore (namely one, three, five and eight months) to mining blend, with posterior plant feed with homogenization piles. Using these possible configurations, it was observed the impact on the net present value of each scenario and the effects of using exposed ore on the grade variability while composing homogenization piles. The convergence of these criteria is able to give drivers for the definition of the quantity of exposed ore, to be used in the mine plans, which balances the expenses with stripping anticipation for ore exposure and give lower grade variability in the homogenization pile formation for plant feed.

Page generated in 0.1128 seconds