• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 3
  • 1
  • Tagged with
  • 7
  • 7
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Métodos de balanceamento de linhas de montagem uni-modelo e mista

Reginato, Gustavo January 2014 (has links)
A concorrência nos mercados mundiais impõe a necessidade de aumento da eficiência das empresas que desejam assumir posições de liderança nos segmentos em que atuam. Neste ínterim, o balanceamento de linha de montagem assume papel fundamental ao permitir a eficiente utilização dos recursos produtivos visando à realização dos objetivos estratégicos. Esta dissertação aborda o balanceamento de linhas de montagem uni-modelo e mistas. Primeiramente, objetiva-se amenizar os impactos causados pela introdução de novos produtos em linhas de produção. Apoiada na integração da ferramenta Delphi a uma nova heurística de balanceamento uni-modelo, a sistemática foi aplicada em uma empresa de produção puxada com lote unitário de fabricação cuja linha de montagem é sujeita à introdução de novos produtos. Os resultados obtidos foram considerados satisfatórios em comparação à tradicional heurística de balanceamento de linha de montagem. Na sequência, objetivou-se atenuar as restrições de capacidade produtiva nas estações de trabalho de linhas de montagem mistas sujeitas a diversos mix de produtos, com a finalidade de incrementar a eficiência e capacidade produtiva da linha. O incremento da capacidade produtiva, a redução do ciclo de fabricação, o aumento da eficiência de balanceamento foram considerados satisfatórios na aplicação da heurística em uma linha de montagem mista que produz 7 modelos de produtos. / Companies aiming to assume leadership positions are required to increase their effectiveness due to competitive global markets. Thus, assembly line balancing plays a critical role in the efficient utilization of productive resources for achieving strategic goals. This dissertation focuses on the balancing of both single and mixed model assembly lines. The first goal is to mitigate impacts derived from the introduction of new products into the assembly line by associating the Delphi method with a new single-model balancing heuristic; such an approach was applied to a new product in a one-piece flow, pulled production company. Results were taken as satisfactory when compared with a traditional assembly line balancing heuristic. Next, we intended to attenuate capacity restrictions in workstations of assembly lines exposed to several combinations of products with the purpose of increasing the assembly line efficiency. The results were considered satisfactory, when aspects of production capacity, manufacturing cycle time and assembly line balancing were evaluated in a mixed assembly line with seven different products.
2

Métodos de balanceamento de linhas de montagem uni-modelo e mista

Reginato, Gustavo January 2014 (has links)
A concorrência nos mercados mundiais impõe a necessidade de aumento da eficiência das empresas que desejam assumir posições de liderança nos segmentos em que atuam. Neste ínterim, o balanceamento de linha de montagem assume papel fundamental ao permitir a eficiente utilização dos recursos produtivos visando à realização dos objetivos estratégicos. Esta dissertação aborda o balanceamento de linhas de montagem uni-modelo e mistas. Primeiramente, objetiva-se amenizar os impactos causados pela introdução de novos produtos em linhas de produção. Apoiada na integração da ferramenta Delphi a uma nova heurística de balanceamento uni-modelo, a sistemática foi aplicada em uma empresa de produção puxada com lote unitário de fabricação cuja linha de montagem é sujeita à introdução de novos produtos. Os resultados obtidos foram considerados satisfatórios em comparação à tradicional heurística de balanceamento de linha de montagem. Na sequência, objetivou-se atenuar as restrições de capacidade produtiva nas estações de trabalho de linhas de montagem mistas sujeitas a diversos mix de produtos, com a finalidade de incrementar a eficiência e capacidade produtiva da linha. O incremento da capacidade produtiva, a redução do ciclo de fabricação, o aumento da eficiência de balanceamento foram considerados satisfatórios na aplicação da heurística em uma linha de montagem mista que produz 7 modelos de produtos. / Companies aiming to assume leadership positions are required to increase their effectiveness due to competitive global markets. Thus, assembly line balancing plays a critical role in the efficient utilization of productive resources for achieving strategic goals. This dissertation focuses on the balancing of both single and mixed model assembly lines. The first goal is to mitigate impacts derived from the introduction of new products into the assembly line by associating the Delphi method with a new single-model balancing heuristic; such an approach was applied to a new product in a one-piece flow, pulled production company. Results were taken as satisfactory when compared with a traditional assembly line balancing heuristic. Next, we intended to attenuate capacity restrictions in workstations of assembly lines exposed to several combinations of products with the purpose of increasing the assembly line efficiency. The results were considered satisfactory, when aspects of production capacity, manufacturing cycle time and assembly line balancing were evaluated in a mixed assembly line with seven different products.
3

Métodos de balanceamento de linhas de montagem uni-modelo e mista

Reginato, Gustavo January 2014 (has links)
A concorrência nos mercados mundiais impõe a necessidade de aumento da eficiência das empresas que desejam assumir posições de liderança nos segmentos em que atuam. Neste ínterim, o balanceamento de linha de montagem assume papel fundamental ao permitir a eficiente utilização dos recursos produtivos visando à realização dos objetivos estratégicos. Esta dissertação aborda o balanceamento de linhas de montagem uni-modelo e mistas. Primeiramente, objetiva-se amenizar os impactos causados pela introdução de novos produtos em linhas de produção. Apoiada na integração da ferramenta Delphi a uma nova heurística de balanceamento uni-modelo, a sistemática foi aplicada em uma empresa de produção puxada com lote unitário de fabricação cuja linha de montagem é sujeita à introdução de novos produtos. Os resultados obtidos foram considerados satisfatórios em comparação à tradicional heurística de balanceamento de linha de montagem. Na sequência, objetivou-se atenuar as restrições de capacidade produtiva nas estações de trabalho de linhas de montagem mistas sujeitas a diversos mix de produtos, com a finalidade de incrementar a eficiência e capacidade produtiva da linha. O incremento da capacidade produtiva, a redução do ciclo de fabricação, o aumento da eficiência de balanceamento foram considerados satisfatórios na aplicação da heurística em uma linha de montagem mista que produz 7 modelos de produtos. / Companies aiming to assume leadership positions are required to increase their effectiveness due to competitive global markets. Thus, assembly line balancing plays a critical role in the efficient utilization of productive resources for achieving strategic goals. This dissertation focuses on the balancing of both single and mixed model assembly lines. The first goal is to mitigate impacts derived from the introduction of new products into the assembly line by associating the Delphi method with a new single-model balancing heuristic; such an approach was applied to a new product in a one-piece flow, pulled production company. Results were taken as satisfactory when compared with a traditional assembly line balancing heuristic. Next, we intended to attenuate capacity restrictions in workstations of assembly lines exposed to several combinations of products with the purpose of increasing the assembly line efficiency. The results were considered satisfactory, when aspects of production capacity, manufacturing cycle time and assembly line balancing were evaluated in a mixed assembly line with seven different products.
4

Propuesta de implementación de un sistema de pintura electrostática para piezas metálicas utilizadas en tableros y celdas eléctricas

Yarasca Martinez, Jasir Jonathan, Espinoza Oscco, Mónica Emilia January 2015 (has links)
La presente investigación desarrolla un plan de mejora del área de pintura para una empresa fabricante de tableros y celdas eléctricas, que desea implementar un sistema que mejore la línea de producción de las piezas metálicas y consecuentemente reduzca los tiempos de pintado, secado y reprocesos generados que actualmente se pueden encontrar en la empresa. Además de permitir una mejor atención al cliente en cuanto a las entregas oportunas del producto terminado y regular los procesos de producción mediante la propuesta del nuevo sistema y mejoras. Por medio de la propuesta de implementación de un sistema de pintura Electrostática, también denominada pintura en polvo, se podrá dar un cambio sustancial tanto del entorno laboral, como productivo y económico, estableciendo medidas adecuadas que permitan trabajar de forma eficiente en el proceso de pintura. Se inicia con un mapeo, toma de datos y evidencias relevantes que nos indican las deficiencias en el área a estudiar. Es así que se plantea demostrar que un sistema de pintura electrostática mejorará el proceso del área de pintura. Además se muestra el costo de la inversión que representa la implementación del sistema de pintura electrostática y los beneficios al cabo de la propuesta de implementación, terminando con las conclusiones y recomendaciones al finalizar el proyecto de investigación. Se recogieron datos del año 2015, del sistema que se utiliza actualmente en el proceso de pintura, comparando resultados con el sistema de pintura propuesto. The present investigation develops an improvement plan to the painting area, for the manufacture of electrical panels and cells, that it wants to implement a system to improve the production line of metal parts and consequently reduce times of painting, drying and rework, usually generated in the company. Also to permit a better customer service in terms of timely deliveries of finished product and regulate the production processes by proposing the new system and improvements. By the proposal implementation of a system of electrostatic painting, also called as powder, it can make an important change between work environment as productive and economical, establishing appropriate measures and to permit work efficiently in the painting process . It starts with a mapping, data collection and relevant evidence which indicate deficiencies in the area to study. It's like that propose illustrated a system that improve electrostatic painting process of painting area. Also the cost of the investment required to implement the system of electrostatic painting and benefits of the proposal after the implementation, ending with conclusions and recommendations at the end of the research project it is shown. The information was collected in 2015, of the actual system used in the painting process, comparing results with the proposed system.
5

Aplicación de técnicas Lean para incrementar la eficiencia del sector agroindustrial / Application of Lean techniques to increase the efficiency of the agroindustrial sector

Requena Izquierdo, Yakelin Milagritos, Zúñiga Halcón, Erick Daniel 09 January 2021 (has links)
La presente investigación examina la baja eficiencia en el procesamiento de frutos cítricos en la provincia de Huaral, Lima, Perú. La investigación se llevó a cabo con ayuda de artículos científicos en experiencia con la cadena de suministro, procesos y etapas especialmente en el sector agroindustrial. La contribución que aquí se propone es la disminución de desperdicios en la cadena de suministro mediante el uso de herramientas de Lean Manufacturing como 5S y Balance de línea. Finalmente, se simulará los procesos en una Mype y se distinguirán si las herramientas son las más factibles para el presente caso mediante los resultados obtenidos. Los resultados obtenidos luego de la simulación fueron un incremento en la eficiencia de 6.01%, reducción de merma de 6.70% y tiempo de ciclo de 47.15 minutos. / The present investigation examines the low efficiency in the processing of citrus fruits in the province of Huaral, Lima, Peru. The research was carried out with the help of scientific articles on experience with the supply chain, processes, and stages, especially in the agro-industrial sector. The contribution proposed here is the reduction of waste in the supply chain through the use of Lean Manufacturing tools such as 5S and Line Balance. Finally, the processes will be simulated in a Mype and it will be distinguished if the tools are the most feasible for the present case through the results obtained. The results obtained after the simulation were an increase in efficiency of 6.01%, reduction of waste of 6.70% and cycle time of 47.15 minutes. / Trabajo de investigación
6

Propuesta de mejora de los procesos de una empresa metalmecánica para reducir los tiempos de demora en la entrega utilizando la metodología lean manufacturing / Proposal to improve the processes of a metalworking company to reduce delay times in delivery using the lean manufacturing methodology

Davila Ramos, Percy Adalino 27 October 2021 (has links)
El presente trabajo se realizó con la finalidad de reducir los tiempos de demora que se tienen en la empresa en estudio, ya que se evidencian excesos de tiempo en cuanto a penalidades, cuellos de botella, reprocesos y merma. Por lo cual se realizó un análisis bibliográfico de distintas metodologías y también de algunos casos de éxito sobre empresas que han implementado las herramientas seleccionadas, lo cual me permitió utilizar la metodología de Lean Manufacturing para poder solucionar el problema de demora en la entrega, mediante las herramientas SMED, 5S, teoría de colas y balance de línea. Finalmente se realizó la validación de la propuesta, donde se calculó el VAN y el TIR para poder determinar la viabilidad de la propuesta, obteniéndose un resultado positivo. / The present work was carried out in order to reduce the delay times that exist in the company under study, since there are excesses of time in terms of penalties, bottlenecks, reprocesses and waste. For this reason, a bibliographic analysis of different methodologies was carried out and also of some success stories about companies that have implemented the selected tools, which allowed me to use the Lean Manufacturing methodology to be able to solve the problem of delay in delivery, through the SMED tools, 5S, queuing theory and line balance. Finally, the validation of the proposal was carried out, where the NPV and the IRR were calculated in order to determine the viability of the proposal, obtaining a positive result. / Trabajo de Suficiencia Profesional
7

Optimalizace pracoviště montáže v předvýrobě za použití principů štíhlé výroby / Rational layout of the assembly line in the pre-manufacturing stage and Lean principles

Škrdla, Michal January 2016 (has links)
This thesis deals with the current state of assembly workplace for prefabrication in selected company. Using lean manufacturing principles it describes and subsequently eliminating all forms of waste that occur in the workplace. Part of the project is to design a new layout of the manufacturing cell, operation balancing and standardize the work of operators in the process. The project aims to achieve the planned production volumes at the same or lower operating costs.

Page generated in 0.0738 seconds