• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Estudo do Impacto da Ampliação de Berço e de Área de Pátio no Aumento da Capacidade Operacional de uma Base de Apoio Offshore

AGUIAR, R. A. 30 August 2013 (has links)
Made available in DSpace on 2016-08-29T15:10:12Z (GMT). No. of bitstreams: 1 tese_6836_Renato Armani Aguiar.pdf: 1971217 bytes, checksum: 7a8325c23d4f72fc2ea9a1e6c477a870 (MD5) Previous issue date: 2013-08-30 / No cenário competitivo mundial os portos sempre desempenharam um papel de destaque, atuando como elemento propulsor para o desenvolvimento das empresas e das regiões onde estão inseridos. Neste contexto também estão incluídos os portos de apoio offshore que prestam serviços de apoio às unidades marítimas (plataformas e sondas), atuando como elo logístico na cadeia produtiva de óleo e gás. Por sua vez, o setor portuário que, no Brasil passou por um longo período sem investimentos em infraestrutura começa a apresentar as marcas negativas daquele tempo, com o crescimento da demanda por serviços de apoio, as empresas têm sofrido com a escassez de bases portuárias. Logo, o investimento em infraestrutura apresenta-se como uma solução tardia para este anunciado problema e que desponta como fundamental para evitar um apagão logístico offshore. Assim, este estudo tem o objetivo de avaliar o impacto da ampliação da infraestrutura nos indicadores de desempenho utilizados num terminal de apoio offshore. Buscando responder ao objetivo proposto, utilizou-se a ferramenta de simulação a fim de se estudar a melhor opção para o investidor aplicar recursos seja em berços ou no aumento da área de pátio. Os resultados mostram que, embora o senso comum indique que o aumento de berços aumenta a capacidade operacional, neste caso o aumento de área, para o terminal analisado, apresentou melhores resultados operacionais, sendo a melhor opção para investimento em infraestrutura.
2

Vila do Conde : um porto nortenho na expansão ultramarina quinhentista

Polónia, Amélia January 1999 (has links)
A dissertação pretende abordar a articulação do porto de Vila do Conde com o processo de expansão ultramarina portuguesa no decurso do séc. XVI. Destacam-se como vectores de análise: 1- O estudo do universo espacial infra-estrutural e humano do porto de V. Conde, no sentido de identificar os condicionalismos que assistem ao envolvimento em estudo; 2- A avaliação da dimensão desse envolvimento, tendo em conta quer a logística naval (estaleiros, frota e náuticos), quer os particulares desempenhos e rumos assumidos a nível das navegações, comércio, colonização e evangelização ultramarinos; 3- As repercussões internas dessa dinâmica, a nível do espaço urbano, economia, sociedade, estruturas e comportamentos demográficos e mentalidades colectivas.
3

Optimizing the ENAP's systems for distributing refined petroleum products by tankers and pipelines

Quinteros Grijalva, Martín January 2017 (has links)
Doctor en Sistemas de Ingeniería / This thesis is compused by two research projects developed at Empresa Nacional del petroleo, ENAP. In the first part of this thesis we present an optimization framework for determining the optimal schedule for a fleet of tankers delivering refined petroleum products for ENAP, a state-owned company in Chile. The scheduling process addresses the distribution task of satisfying the demand for multiple products to multiple clients while minimizing the overall cost. These clients have different storage capacities and are located near ports along the coast. The optimization model is an exact one, based on defining each leg of each trip for each tanker. It was however a very large scale MIP model unsolvable using a commercial code (Node Model). We generated an approximate model based on a set of feasible routes for each tanker. This model make the problem more tractable and provides good feasible solutions (Routes model). The best solution is used as a hot start for the original Node Model, allowing its solution with very low residual gaps in moderate computer times. This two-step approach was implemented and has been used at ENAP since 2015. A graphical user interface provides a friendly format for the schedulers. The new system replaces the manual process that was used in the past. It has been a milestone change at ENAP and it is currently saving 8-9% of the total operational cost for the maritime distribution system. In the second part of this work we describe the creation, development, implementation and impact of a system optimizing the distribution of petroleum products by pipeline at ENAP. Scheduling used to be done by hand, based on experience and on the need to satisfy physical constraints in the pipeline, supply constraints in and out of the refinery and demand constraints from clients. The complexity of the problem and the need to cut down on operating costs suggested turning to optimization, specifically integer programming. The positive results of the project owe a lot to the constant interaction between schedulers, deciders, and the optimization team, and to the insights provided by the schedulers that allowed to limit the model's complexity. The resulting system is easy to use for schedulers thanks to a graphical user interface (GUI), and its solution requires little computer time. It is used once a month for planning the next month operations and negotiating delivery dates and amounts with the clients based on the solution suggested by the model. Operating cost savings are of the order of 10%. The system has also been used to evaluate an alternative distribution approach. / Este trabajo ha sido parcialmente financiado por Conicyt, Programa de Atracción e Inserción de Capital Humano Avanzado, 7813110023

Page generated in 0.0706 seconds